GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Main page
  • Contents
  • Current events
  • Random article
  • About Wikipedia
  • Contact us
  • Help
  • Learn to edit
  • Community portal
  • Recent changes
  • Upload file
  • Special pages
  • Search
  • Donate

This view

  • Original page
  • New address

GeezerVison is showing en.wikipedia.org — Launch Control Center - Wikipedia

Coordinates: 28°35′7″N 80°38′59″W / 28.58528°N 80.64972°W / 28.58528; -80.64972
This article is about the Launch Control Center at Kennedy Space Center. For underground facilities used to launch ICBMs, see Missile launch control center. For other topics, see launch control (disambiguation).
Launch Control Center
U.S. National Register of Historic Places
LC-39 Launch Control Center
Launch Control Center is located in Florida
Launch Control Center
Location within Florida
Show map of Florida
Launch Control Center is located in the United States
Launch Control Center
Location within the United States
Show map of the United States
Nearest cityTitusville, Florida
Coordinates28°35′7″N 80°38′59″W / 28.58528°N 80.64972°W / 28.58528; -80.64972
Area12,047 m2 (129,670 sq ft)
Built1967
MPSJohn F. Kennedy Space Center MPS
NRHP reference No.99001645[1]
Added to NRHPJanuary 21, 2000

The Rocco A. Petrone Launch Control Center (commonly known as just the Launch Control Center or LCC) is a four-story building at NASA's Kennedy Space Center on Merritt Island, Florida, used to manage launches of launch vehicles from Kennedy Space Center Launch Complex 39. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking, and instrumentation equipment; and firing rooms.

LCC has conducted launches since the unmanned Apollo 4 (SA-501) launch on November 9, 1967. LCC's first launch with a human crew was Apollo 8 on December 21, 1968. NASA's Space Shuttle program also used LCC. NASA has renovated the center for Space Launch System (SLS) missions, which began in 2022 with Artemis I. In February 2022, the center was renamed after former director of launch operations Rocco A. Petrone.[2]

Firing rooms

Firing Room 1 configured for Space Shuttle launches
Firing Room 2 as it appeared in the Apollo era
A Saturn I-B control panel from an Apollo-era Firing Room

Launch operations are supervised and controlled from several control rooms known as "firing rooms". The controllers are in control of pre-launch checks, the booster and spacecraft. Once the rocket has cleared the launch tower (usually within the first 10–15 seconds), control is switched over to the mission's mission control center (the Christopher C. Kraft Jr. Mission Control Center at the Johnson Space Center in Houston, Texas for NASA launches or SpaceX Mission Control Center in Hawthorne, California for SpaceX launches.)

Extensive renovation of Firing Room 4 was finished in 2006.[3]

Firing Room 4 was leased by SpaceX and serves as their launch control center for Launch Complex 39A until August 2023 when the company moved into its own facility just before the launch of the Crew-7 mission.[4][5]

Key personnel

Launch Director (LD)

The Launch Director is the head of the launch team, and is responsible for making the final "go" or "no go" decision for launch after polling the relevant team members. There have been eight different Space Shuttle launch directors between 1981 and 2011.[6] Since 2016, Charlie Blackwell-Thompson has served as the launch director for SLS/Orion missions as part of the Artemis program.[7][8]

Flow Director (FD)

The Flow Director is responsible for the preparation of the spacecraft for launch, and remains in the LCC in an advisory capacity.

NASA Test Director (NTD)

The NASA Test Director is responsible for all pre-launch testing, whether involving the flight crew, the orbiter, the external tank/solid rocket booster, or ground support equipment. The NTD is also responsible for the safety of all personnel on the pad after fuelling has occurred. Reports to the Launch Director.

Orbiter Test Conductor (OTC)

The Orbiter Test Conductor is in charge of all pre-flight checkout and testing of the orbiter, and manages the engineers in the firing room who monitor the orbiter's systems. OTC is an employee of a contractor rather than of NASA.

Tank/Booster Test Conductor (TBC)

[icon]
This section is empty. You can help by adding to it. (June 2025)

Payload Test Conductor (PTC)

The Payload Test Conductor is responsible for the pre-flight test and checkout of payloads carried by the orbiter and manages the engineering and test teams responsible for monitoring and controlling payload ground operations. PTC is a contractor member of the Space Shuttle Team.

Launch Processing System Coordinator (LPS)

The LPS Coordinator monitors and oversees the LPS System; specifically, the desired launch rate, Space Shuttle stacking (assembly), and all safety requirements. This is made possible by the Launch Processing System, or LPS — a highly automated, computer-controlled system that oversees the entire checkout and launch process.[9]

Support Test Manager (STM)

[icon]
This section is empty. You can help by adding to it. (June 2025)

Safety Console Coordinator (SAFETY)

[icon]
This section is empty. You can help by adding to it. (June 2025)

Shuttle Project Engineer (SPE)

[icon]
This section is empty. You can help by adding to it. (June 2025)

Landing and Recovery Director (LRD)

[icon]
This section is empty. You can help by adding to it. (June 2025)

No Landing and Recovery Director (NLRD)

[icon]
This section is empty. You can help by adding to it. (June 2025)

Superintendent of Range Operations (SRO)

The Superintendent of Range Operations ensures that all tracking and communications systems are ready to support the launch operation as well as ensuring that downrange airspace and splashdown areas remain clear for launch, and monitors weather near the launch site.

Ground Launch Sequencer Engineer (CGLS)

The Ground Launch Sequencer Engineer is responsible for monitoring the operation of the automated Ground Launch Sequencer system, which controls the countdown from T−9 minutes until launch. After this point through to T−31 seconds, they are in charge of implementing a manual hold if necessary. After T−31 seconds only an automatic cutoff is available. The automatic cutoff recycles the countdown clock to T−20 minutes. Usually this will extend the launch time beyond the launch window causing a scrub and a 24-hour turnaround.

Gallery

  • Interior of the recently renovated firing room 1 in 2018.
    Interior of the recently renovated firing room 1 in 2018.
Wide angle panorama of the Launch Control Center.

See also

  • Ground station
  • Launch status check
  • Mission control center
  • Spacecraft naming

References

  1. ↑ "National Register Information System". National Register of Historic Places. National Park Service. July 9, 2010.
  2. ↑ Cawley, James (22 February 2022). "NASA Kennedy's Control Center Named for Apollo-Era Launch Director". NASA (Press release). Retrieved 3 April 2022.
  3. ↑ "Firing Rooms at Kennedy Space Center" (PDF). 2019-09-24.
  4. ↑ "NASA Astronauts Launch from America in Historic Test Flight of SpaceX Crew Dragon" (Press release). NASA. May 30, 2020. Retrieved June 1, 2020.
  5. ↑ Clark, Stephen [@StephenClark1] (July 25, 2023). "A couple bits of info from the Crew-7 preview news conference: SpaceX has begun using a new launch control center at the company's Hangar X facility at KSC for Starlink missions. It'll be used to control the Falcon Heavy/Jupiter 3 launch Wednesday night, then again for Crew-7" (Tweet). Retrieved October 3, 2024 – via X (formerly Twitter).
  6. ↑ "History of Space Shuttle Launch Directors" (PDF). NASA. Retrieved November 7, 2022.
  7. ↑ Siceloff, Steven (2016-02-01). "Blackwell-Thompson Launch Director for SLS/Orion". NASA. Archived from the original on 2023-04-16. Retrieved 2026-09-14.
  8. ↑ "Meet NASA's Artemis II Moon Mission Masterminds - NASA". 2025-08-27. Retrieved 2026-09-14.
  9. ↑ "NASA: KSC Launch Control Center". Archived from the original on 2020-09-24. Retrieved 2009-08-12.

Sources

  • Launch Control Center Archived 2016-10-18 at the Wayback Machine
  • Launch Control Center Archived 2008-06-19 at the Wayback Machine Main page.
  • Launch Team Archived 2015-06-19 at the Wayback Machine

External links

Wikimedia Commons logo
Wikimedia Commons has media related to Launch Control Center.
  • History of the Firing Rooms at the Launch Control Center
  • Floor plan layout of the Firing Rooms at the Launch Control Center
  • New Launch Control Room Ready for STS-121 Liftoff Archived 2021-07-29 at the Wayback Machine
  • KSC Launch Processing System Archived 2020-09-24 at the Wayback Machine

Retrieved from "https://en.wikipedia.org/w/index.php?title=Launch_Control_Center&oldid=1380259619"
Categories:
  • Kennedy Space Center
  • Buildings and structures in Merritt Island, Florida
  • National Register of Historic Places in Brevard County, Florida
Hidden categories:
  • Articles with short description
  • Short description is different from Wikidata
  • Pages using gadget WikiMiniAtlas
  • Articles using NRISref without a reference number
  • Coordinates on Wikidata
  • Articles to be expanded from June 2025
  • All articles to be expanded
  • Articles with empty sections from June 2025
  • All articles with empty sections
  • Webarchive template wayback links
  • Commons category link from Wikidata
  • Use American English from January 2014
  • All Wikipedia articles written in American English
You are visitor 01402503 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.