GeezerVison is showing en.wikipedia.org — Project network - Wikipedia "Network chart" redirects here. For the 1980s and early 1990s British radio show, see The Network Chart Show.
A project network diagram, also known an activity network diagram (AND) is a graph that displays the order in which a project’s activities are to be completed. Derived from the work breakdown structure, the terminal elements of a project are organized sequentially based on the relationship among them. It is typically drawn from left to right to reflect project chronology.[1] TechniquesActivity-on-NodeThe Activity-on-Node (AON) technique uses nodes to represent individual project activities and path arrows to designate the sequence of activity completion.[2] Nodes are labelled using information pertaining to the activity. According to Project Management, nodes should at least display the following information:[3]
Start and finish times are used to determine the critical path of a project. Activity float, or slack, time is used in project crashing. Other techniquesThe condition for a valid project network is that it doesn't contain any circular references. Project dependencies can also be depicted by a predecessor table. Although such a form is very inconvenient for human analysis, project management software often offers such a view for data entry. An alternative way of showing and analyzing the sequence of project work is the design structure matrix or dependency structure matrix. See alsoReferences
External links
| ||||
| You are visitor 01402503 — GeezerVison does not store the pages you look up. Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required. |