GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — sustainability-toolkit/docs/STAKEHOLDERS.md at main · DataWithSyed/sustainability-toolkit

Expand file tree

/

STAKEHOLDERS.md

Copy path
More file actions
More file actions

Latest commit

 

History

History
History
112 lines (90 loc) · 6.29 KB
/

STAKEHOLDERS.md

Copy path

File metadata and controls

112 lines (90 loc) · 6.29 KB
Raw
Copy raw file
Download raw file
Outline
Edit and raw actions

sustainkit.stakeholders: register, influence x interest map, engagement plan, survey weights

Added in v0.3.0.

What it does

  1. Loads and validates a stakeholder register (CSV or Excel) and lists every problem at once: missing columns, blank names, duplicate stakeholders, ratings outside the scale, unknown categories, bad dates.
  2. Classifies each stakeholder on an influence x interest grid into four strategies: Manage closely, Keep satisfied, Keep informed, Monitor.
  3. Builds an engagement plan: next due date from the last engagement and a review interval, with status overdue, due soon (within 14 days), ok or never engaged.
  4. Derives stakeholder-group weights for the materiality survey (stakeholder_group, weight), in the format sustainkit materiality reads. It also checks that the register groups and the survey groups match.
  5. Plots the map (PNG) with quadrant shading, ESRS stakeholder categories as colours and point size by salience (influence x interest).

Stakeholder map, fictional example

Register format

Column Required Meaning
stakeholder yes Name of the stakeholder (unique)
group yes Stakeholder group. Use the same names as in the materiality survey (stakeholder_group)
influence yes Influence on the undertaking, 1..scale (default 1-5)
interest yes Interest in the undertaking's sustainability matters, 1..scale
category no affected, user or both (ESRS 1 paras 22-23, see below)
owner, channel, notes no Free text carried through to the outputs
last_engaged no Date of the last engagement (YYYY-MM-DD)
frequency_days no Review interval for this stakeholder; overrides the strategy default

Method and sources

Stakeholder categories. ESRS 1 (Commission Delegated Regulation (EU) 2023/2772), para 22: "Stakeholders are those who can affect or be affected by the undertaking", in two main groups: (a) affected stakeholders, whose interests are or could be affected by the undertaking's activities and business relationships across its value chain, and (b) users of sustainability statements (investors, lenders and other creditors, business partners, trade unions, civil society, governments, analysts and academics). Para 23: some stakeholders belong to both groups. Para 24 makes engagement with affected stakeholders central to due diligence and the materiality assessment. The category column records exactly this distinction. The tool does not decide it for you.

Influence x interest grid. This is the power-interest grid of strategy textbooks. It is usually credited to Mendelow (1981, Environmental Scanning: The Impact of the Stakeholder Concept, Proceedings of the Second International Conference on Information Systems). Mendelow's own matrix set stakeholder power against the dynamism of the stakeholder's environment. The interest axis is a later textbook adaptation (often cited, wrongly, as "Mendelow 1991"). No reporting standard prescribes this grid. The following are tool choices you can change:

Choice Default Option
High / low cut-off rating >= scale midpoint (3 on 1-5) is "high" --threshold, MapConfig(threshold=...)
Strategy names Manage closely / Keep satisfied / Keep informed / Monitor QUADRANTS
Review interval 30 / 90 / 90 / 180 days MapConfig(frequency_days=...), per row frequency_days
"Due soon" window 14 days DUE_SOON_DAYS
Group weight scheme salience = mean of influence x interest in the group influence, interest, mean, equal

Group weights. A group's weight is the mean stakeholder score in that group under the chosen scheme. The weights are then scaled so their mean over groups is 1. Using the mean rather than the sum means a group does not gain weight just because more of its members are listed. This matches the materiality module, where a group counts by its weight, not its head-count. Whether survey groups should be weighted by influence at all is a methodological choice. ESRS 1 para 24 emphasises affected stakeholders, who may have little influence. --weight-scheme interest or equal avoids giving powerful groups extra say. Record the choice in your methodology note.

On the chart, with integer ratings, the dashed boundary is drawn half a step below the cut-off so a rating equal to the cut-off appears inside the "high" zone where it is classified.

Command line

sustainkit stakeholders example stakeholders.csv                 # fictional example register
sustainkit stakeholders map stakeholders.csv --as-of 2026-11-26 \
    --chart map.png --markdown map.md --csv map.csv \
    --weights weights.csv --survey survey.csv                    # survey: check group names

weights.csv can replace the weights table of a materiality assessment (CSV folder) or be pasted into the weights sheet of the workbook.

Python

from sustainkit.stakeholders import MapConfig, build_map, load_register
from sustainkit.stakeholders.plot import plot_map

smap = build_map(load_register("stakeholders.csv"), MapConfig(weight_scheme="salience"), as_of="2026-11-26")
smap.table                     # strategy, salience, next_due, engagement_status per stakeholder
smap.weights                   # stakeholder_group, weight (mean 1), n, mean influence / interest
smap.quadrant_counts()
smap.link_survey(["Employees", "Investors"])
plot_map(smap, "map.png")

Fictional example

sustainkit stakeholders example writes the register of the fictional "Example Manufacturing Co." (15 stakeholders in the 6 groups of the materiality example survey). As of 2026-11-26: 7 Manage closely, 2 Keep satisfied, 5 Keep informed, 1 Monitor. Engagement: 10 overdue, 2 due soon, 2 ok, 1 never engaged. Salience weights: Investors 1.47, Customers 1.19, Employees 1.04, NGOs 0.96, Local community 0.76, Suppliers 0.58. Full table: assets/stakeholders_example_summary.md.

Not covered yet

  • A communication plan (messages, channels and owners by topic) and a calendar/.ics export of the engagement schedule (roadmap item 16).
  • Several assessors rating the same stakeholder, or uncertainty in the ratings.
  • Links from individual stakeholders to the material topics they raised.
You are visitor 01402792 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.