The proposed platform is being developed for Enron to support the launch of a trading platform by December 31st, 2023. The primary purpose is to enable real-time financial transactions and provide executives with mobile access to critical information, thereby enhancing operational efficiency and compliance.
The business context revolves around addressing several key challenges: ensuring robust security for all financial transactions, meeting stringent performance requirements, and integrating necessary features such as single sign-on (SSO) for enterprise clients. Without the proposed platform, Enron would face significant risks in terms of data breaches, non-compliance with regulatory standards, and loss of competitive edge due to slower transaction processing times.
| Stakeholder | Title | Primary Role in Project |
|---|---|---|
| Kenneth Lay | CEO | Overall project oversight and strategic direction |
| Jeff Skilling | CTO | Technical leadership and security mandates |
| Louise Kitchen | Director of Trading Systems | Performance requirements and dashboard specifications |
| Andy Fastow | CFO | Budget constraints and resource allocation |
- [MUST HAVE] Timeline Constraint: The project must be completed by December 31st, 2023, as per the Q4 Platform Strategy (Source: [1]).
- [SHOULD HAVE] Budget Constraint: The current estimate of handling 10,000 concurrent users is insufficient; the platform must handle at least 50,000 during peak trading hours (Source: [3]).
- [LOW RISK] Resource Constraint: Engineering headcount has been frozen, limiting additional resources for Phase 1 (Source: [1]).
- Implement single sign-on (SSO) for enterprise clients as a non-negotiable requirement.
- Ensure all financial transactions are encrypted with AES-256 encryption to meet security mandates.
- Develop real-time P&L display and data refresh under 500ms for traders.
- Provide export functionality to Excel and PDF formats.
- [MUST HAVE] Mobile access for executives is deferred until Phase 2 due to significant scope expansion (Source: [4]).
- [SHOULD HAVE] Reporting module development has been deferred from Phase 1 to Phase 2 due to budget constraints and resource limitations (Source: [1]).
Note: The project timeline may be extended to January 15th, 2024, for Phase 1 authentication only, as proposed by Jeff Skilling (Source: [7]).