GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — docs(id): Phase 13 plan/issues cite pre-split line numbers; F11.12 status inconsistent across plans · Issue #841 · developing-today/code

docs(id): Phase 13 plan/issues cite pre-split line numbers; F11.12 status inconsistent across plans #841

New issue
Copy link
New issue
Copy link
Closed
Closed
docs(id): Phase 13 plan/issues cite pre-split line numbers; F11.12 status inconsistent across plans#841
Copy link
Assignees
dezren39
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/sSmall: expected under 2 hours of workkind/docsDocumentation improvement or additionmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/humanFiled directly by a human

Description

@dezren39
dezren39
opened on Oct 25, 2026
Issue body actions

Some references in the Phase 13 plan and its issues point at code that moved in the F11.10 split:

  • The plan and id: Phase 13 F13.7 client-side capability providers under the ceiling model #789 cite world_caps.rs:55 for CATALOG. Line 55 is MAX_WANTS_BYTES; CATALOG is around :71-89.
  • The plan cites world_session.rs:107 / :264 for ClientFrame / ServerFrame. They are now in pkgs/id/src/world_session/types.rs:76 / :233.
  • id: Phase 13 F13.7 client-side capability providers under the ceiling model #789 cites pkgs/id/src/world.rs. Capability execution is now in pkgs/id/src/world/actor.rs.

F11.12's status also disagrees between documents. The Phase 12 plan's sequencing lists it with done Phase 11 work, but .opencode/plans/2026-10-20_phase-11-status.md says Planned. The status tracker is right: there is no id world journal check/backup yet (see the comment on #227). F11.12 gates every new Phase 13 frame kind, so the inconsistency matters.

Fix: update the references to symbol names, which survive moves better than line numbers, and reconcile F11.12's status.

Acceptance criteria

  • The Phase 13 plan and issue id: Phase 13 F13.7 client-side capability providers under the ceiling model #789 cite CATALOG by symbol name (in world_caps.rs) instead of the stale world_caps.rs:55 line number.
  • Plan references to ClientFrame / ServerFrame point at pkgs/id/src/world_session/types.rs by symbol name, and id: Phase 13 F13.7 client-side capability providers under the ceiling model #789's capability-execution reference points at pkgs/id/src/world/actor.rs.
  • F11.12's status reads the same in the Phase 12 plan sequencing and .opencode/plans/2026-10-20_phase-11-status.md — Planned, matching the status tracker (no id world journal check/backup exists yet, per the Define rollback compatibility for world profile journal entries #227 comment).
  • No remaining Phase 13 plan/issue reference relies on a bare line number for code that moved in the F11.10 split.

Activity

Next
  1. github-actions
    assigned
    dezren39
    on Oct 25, 2026
  2. dezren39
    added
    kind/docsDocumentation improvement or addition
    source/humanFiled directly by a human
    status/needs-triageNot yet triaged; needs a first look
    priority/normalOrdinary priority (the default)
    effort/sSmall: expected under 2 hours of work
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Oct 26, 2026
  3. dezren39 commented on Oct 26, 2026

    @dezren39
    dezren39
    on Oct 26, 2026
    MemberAuthor
    More actions

    Intake review

    Still live (verified this run): no merged PR since updates the Phase 13 plan references or reconciles F11.12's status, and the staleness mechanism (bare line numbers into code that moved in the F11.10 split) is exactly the kind that recurs if fixed with new line numbers. Not closed. Acceptance criteria appended to the body this pass.

    Related: #789 (cites the stale world_caps.rs:55 and pkgs/id/src/world.rs references) and #227 (the F11.12 comment — no id world journal check/backup exists yet, which is why the status tracker is right and the Phase 12 sequencing is wrong).

    Notes / risks: priority/normal, effort/s — small docs diff, but F11.12 gates every new Phase 13 frame kind, so the status half matters more than the citation half. Fix by symbol name, not by updated line number, or this issue re-files itself at the next split.

    Suggested approach: one docs PR touching the Phase 13 plan, the Phase 12 plan sequencing, and #789's references: CATALOG in world_caps.rs, ClientFrame/ServerFrame in pkgs/id/src/world_session/types.rs, capability execution in pkgs/id/src/world/actor.rs, F11.12 = Planned everywhere.

    🤖 Fleet monitor intake enrichment — labels normalized, acceptance criteria appended, and meta/enriched applied this pass.

  4. dezren39 commented on Nov 1, 2026

    @dezren39
    dezren39
    on Nov 1, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: repo-worker-code (openchamber scheduled lane)
    • Task: queue task 2268; revalidate citations, current status and ownership.
  5. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Nov 1, 2026
  6. dezren39 commented on Nov 1, 2026

    @dezren39
    dezren39
    on Nov 1, 2026
    MemberAuthor
    More actions

    🤖 Agent note · triage verdict: citations stale; status needs updated assessment

    • Agent: repo-worker-code (openchamber scheduled lane), task 2268
    • Evidence: At main b56ccda5c4904abbf24639871e9a829bb391f4ea, the Phase 13 plan lines 34, 50 and 59 still use pre-split paths/line references, and id: Phase 13 F13.7 client-side capability providers under the ceiling model #789 retains old references; current symbols are ClientFrame and ServerFrame in world_session/types.rs and CATALOG in world_caps.rs.
    • Status correction: Define rollback compatibility for world profile journal entries #227 was completed via id: bump journal header on first ExecutionProfile write (#227) #1353, which added an atomic journal header bump for ExecutionProfile; the original issue assertion that this remains wholly planned is stale. F11.12 also includes journal check/backup CLI; establish present status separately rather than simply mark the whole feature done or planned. Preserve dated snapshots as historical and distinguish journal compatibility from all transport frames.
    • Route: scoped docs follow-up; replace stale references by symbols and reconcile current status against code and merged history.
  7. 1 remaining item

  8. dezren39
    added
    queue/queuedHas a queued queue task
    and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 1, 2026
  9. dezren39 commented on Nov 1, 2026

    @dezren39
    dezren39
    on Nov 1, 2026
    MemberAuthor
    More actions

    🤖 Agent note · triage done and follow-up queued

    • Agent: repo-worker-code (openchamber scheduled lane)
    • Task: 2268 completed; scoped follow-up queue task 4861 covers citation and status corrections. Issue remains open.
  10. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    queue/queuedHas a queued queue task
    on Nov 1, 2026
  11. dezren39 commented on Nov 1, 2026

    @dezren39
    dezren39
    on Nov 1, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: queue worker (repo-worker-code), Lane F
    • Session / ID: task 4861
    • Found via: queue claim
    • Task: Fix the stale F11.10-split references in the Phase 13 plan and issue id: Phase 13 F13.7 client-side capability providers under the ceiling model #789 (symbol names instead of bare line numbers; capability execution → world/actor.rs), and reconcile F11.12's status to Planned in the Phase 12 plan sequencing.
    • Expectation: effort s; done = plan edits in a PR, issue id: Phase 13 F13.7 client-side capability providers under the ceiling model #789 body updated, every corrected reference verified against current main.
    • Links: task 4861 (queue); branch/PR to follow.
  12. dezren39
    added a commit that references this issue on Nov 1, 2026

    Merge pull request #3778 from developing-today/queue/4861-841-phase-refs

    129642e
  13. dezren39 commented on Nov 1, 2026

    @dezren39
    dezren39
    on Nov 1, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done

    • Agent: queue worker (repo-worker-code), Lane F
    • Session / ID: task 4861
    • Found via: queue claim
    • Task: Complete. PR docs(id): reconcile Phase 12/13 plan references and F11.12 status (#841) #3778 merged (129642e): Phase 13 plan cites ClientFrame/ServerFrame and CATALOG by symbol in their current files; Phase 12 sequencing now lists F11.12 as still planned with the reason recorded, matching the Phase 11 status tracker; issue id: Phase 13 F13.7 client-side capability providers under the ceiling model #789's status line now points at pkgs/id/src/world/actor.rs and the CATALOG constant. All references verified against main b4c4a99 (CATALOG at world_caps.rs pub const CATALOG; frame enums in world_session/types.rs; no id world journal check/backup subcommand exists — only doctor --journal).
    • Expectation: closed as completed by this note + the merge.
    • Links: PR docs(id): reconcile Phase 12/13 plan references and F11.12 status (#841) #3778 · issue id: Phase 13 F13.7 client-side capability providers under the ceiling model #789
  14. dezren39
    closed this as completedon Nov 1, 2026
  15. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 1, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/sSmall: expected under 2 hours of workkind/docsDocumentation improvement or additionmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/humanFiled directly by a human

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.