GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — pkgs/web-gen crate split — step 0: workspace conversion + baselines (no code motion) · Issue #8959 · developing-today/code

pkgs/web-gen crate split — step 0: workspace conversion + baselines (no code motion) #8959

New issue
Copy link
New issue
Copy link
Closed
Closed
pkgs/web-gen crate split — step 0: workspace conversion + baselines (no code motion)#8959
Copy link
Assignees
dezren39
Labels
epic/crate-splitsEpic: crate-splits - all issues of this effort carry itstatus:done

Description

@dezren39
dezren39
opened on Nov 12, 2026
Issue body actions

pkgs/web-gen crate split — step 0: workspace conversion + baselines (no code motion)

Umbrella: #8958 (#8958)

Template: doc/2026-11-01T16-53-00Z_design_id_crate_split/2026-11-01T16-53-00Z_design_id_crate_split.md (design of record for the pkgs/id split, from #3195). Worked example: pkgs/id umbrella #3447, step issues #4403-#4411. Program: fleet-wide crate-splitting program (Drew's order, 2026-11-11); this issue set comes from the Part 2 inventory, 2026-11-12.

Scope

Convert pkgs/web-gen to a Cargo workspace in place (root package stays the shipped web-gen binary; crates/ layout created), pin shared dependency versions in [workspace.dependencies], and record the baselines on the umbrella: current build result for the wasm CSR target setup this project uses, cargo test result (expected 0 tests). No code moves in this step.

Acceptance

Acceptance discipline (from the id template; applies to every step):

  • One PR per step; no step bundles another step's extraction.
  • Full test suite green on that PR. Baseline is recorded in step 0 (this project currently has 0 tests, so the gate is: cargo test passes, the workspace builds clean, and any tests added by a step pass).
  • Behavior-preserving: no functional changes, no dependency version bumps, no renames beyond the crate-path moves in scope.
  • Facade re-exports where consumers exist: the facade crate keeps the pre-split public paths working for the whole migration, and a step is complete only when the moved code exists solely in its new crate (the old location holds at most the re-export). The 2026-11-12 inventory found no external/Nix consumers of this project (grep of *.nix outside the project dir: no hits); the known consumer is the project's own binary/lib entry points.
  • Never leave main red: a step that cannot go green stops and reports here instead of merging partial state.

Activity

  1. developing-today commented on Nov 12, 2026

    @developing-today
    developing-todayBot
    on Nov 12, 2026 – with developing.today
    Contributor
    More actions

    CODE-2719

  2. dezren39
    added
    epic/crate-splitsEpic: crate-splits - all issues of this effort carry it
    on Nov 12, 2026
  3. dezren39
    added a parent issue on Nov 12, 2026
    • epic: crate splits — splitting monolith pkgs crates into workspace sub-crates #8977
  4. github-actions
    assigned
    dezren39
    on Nov 12, 2026
  5. dezren39 commented on Nov 13, 2026

    @dezren39
    dezren39
    on Nov 13, 2026
    MemberAuthor
    More actions

    Step-0 baseline recorded on the umbrella #8958 (2026-11-13): the project does not build as it stands — see the evidence and the blocker recorded there. Closing this step-0; the extraction steps remain open on the umbrella pending a revival decision.

  6. dezren39
    closed this as completedon Nov 13, 2026
  7. developing-today
    added
    status:done
    on Nov 13, 2026
  8. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    Adjudication (oc-code-01, 2026-11-24, AUDIT-7 Lane 2): LEGITIMATE CLOSURE. Closed as step 0 only, with the baseline blocker recorded on umbrella #8958. The extraction steps remain open on that umbrella, so this close does not claim the crate split is done.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

epic/crate-splitsEpic: crate-splits - all issues of this effort carry itstatus:done

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.