@@ -67,7 +67,7 @@ For first-time contributors, check if the commit author is the same as the |
67 | 67 | pull request author, and ask if they have configured their git |
68 | 68 | username and email to their liking as per [this guide][git-username]. |
69 | 69 | This is to make sure they would be promoted to "contributor" once |
70 | | -their pull request gets landed. |
| 70 | +their pull request lands. |
71 | 71 |
|
72 | 72 | ### Closing Issues and Pull Requests |
73 | 73 |
|
@@ -82,32 +82,31 @@ necessary. |
82 | 82 | ### Author ready pull requests |
83 | 83 |
|
84 | 84 | A pull request that is still awaiting the minimum review time is considered |
85 | | -`author-ready` as soon as the CI has been started, it has at least one approval, |
| 85 | +_author ready_ as soon as the CI has been started, it has at least one approval, |
86 | 86 | and it has no outstanding review comments. Please always make sure to add the |
87 | | -appropriate `author-ready` label to the PR in that case and remove it again as |
88 | | -soon as that condition is not met anymore. |
| 87 | +`author ready` label to the PR in that case and remove it again as soon as that |
| 88 | +condition is not met anymore. |
89 | 89 |
|
90 | 90 | ### Handling own pull requests |
91 | 91 |
|
92 | | -If you as a Collaborator open a pull request, it is recommended to start a CI |
93 | | -right after (see [testing and CI](#testing-and-ci) for further information on |
94 | | -how to do that) and to post the link to it as well. Starting a new CI after each |
95 | | -update is also recommended (due to e.g., a change request in a review or due to |
96 | | -rebasing). |
| 92 | +When you open a pull request, it is recommended to start a CI right away (see |
| 93 | +[testing and CI](#testing-and-ci) for instructions) and to post the link to it |
| 94 | +in a comment in the pull request. Starting a new CI after each update is also |
| 95 | +recommended (for example, after an additional code change or after rebasing). |
97 | 96 |
|
98 | | -As soon as the PR is ready to land, please go ahead and do so on your own. |
99 | | -Landing your own pull requests distributes the work load for each Collaborator |
100 | | -equally. If it is still awaiting the |
101 | | -[minimum time to land](#waiting-for-approvals), please add the `author-ready` |
102 | | -label to it so it is obvious that the PR can land as soon as the time ends. |
| 97 | +As soon as the PR is ready to land, please do so. Landing your own pull requests |
| 98 | +allows other Collaborators to focus on other pull requests. If your pull request |
| 99 | +is still awaiting the [minimum time to land](#waiting-for-approvals), add the |
| 100 | +`author ready` label so other Collaborators know it can land as soon as the time |
| 101 | +ends. |
103 | 102 |
|
104 | 103 | ## Accepting Modifications |
105 | 104 |
|
106 | 105 | All modifications to the Node.js code and documentation should be performed via |
107 | 106 | GitHub pull requests, including modifications by Collaborators and TSC members. |
108 | 107 | A pull request must be reviewed, and must also be tested with CI, before being |
109 | | -landed into the codebase. There may be exception to the latter (the changed code |
110 | | -can not be tested with a CI or similar). If that is the case, please leave a |
| 108 | +landed into the codebase. There may be exceptions to the latter (the changed |
| 109 | +code cannot be tested with a CI or similar). If that is the case, please leave a |
111 | 110 | comment that explains why the PR does not require a CI run. |
112 | 111 |
|
113 | 112 | ### Code Reviews |
@@ -140,7 +139,7 @@ the CI outcome. |
140 | 139 | If there is no disagreement amongst Collaborators, a pull request should be |
141 | 140 | landed given appropriate review, a green CI, and the minimum |
142 | 141 | [waiting time](#waiting-for-approvals) for a PR. If it is still awaiting the |
143 | | -[minimum time to land](#waiting-for-approvals), please add the `author-ready` |
| 142 | +[minimum time to land](#waiting-for-approvals), please add the `author ready` |
144 | 143 | label to it so it is obvious that the PR can land as soon as the time ends. |
145 | 144 |
|
146 | 145 | Where there is discussion amongst Collaborators, consensus should be sought if |
|