Battery
│
├── Large pump ──┬── Accumulator ×2 ──┬── Valve pinlb ── left-rear soft joint
│ │ └── Valve pinrb ── right-rear soft joint
│
└── Small pump ──┬── Accumulator ×2 ──┬── Valve pinlf ── left-front soft joint
│ ├── Valve pinrf ── right-front soft joint
│ └── Valve pinpp ── sampling tube
| Component | Qty | Role |
|---|---|---|
| 12 V air pump (large) | 1 | Drives both hind limbs — the primary power source |
| 12 V air pump (small) | 1 | Drives forelimbs and the water sampler |
| Home-made accumulator | 2 per pump | Modified syringe + compression spring; stores pressure ahead of valve opening for a burst release |
| 3-port 2-position 12 V solenoid valve | 6 channels | Channel switching and venting |
- Inside the hull — silicone tubing between components
- At the hull wall — sealed fitting into the elliptical cylindrical interface
- At the limb — interface into the silicone soft joint
Joint sealing (three layers): PTFE tape → rubber ring → cable tie.
This is a substantial improvement on the original bare press-fit, but it remains the project's longest-standing piece of technical debt. It is not a designed seal — it is three passive layers stacked until the leak rate became tolerable.
Oct 2023 — line simplification. The original "silicone tube + fitting" approach was bulky, with a lot of uncut surplus tubing. Pressure sensors that had proven useless in bench testing (originally PRE1–PRE5 on pins 36/39/34/35/32) were removed along with their lines, freeing volume for a future gas cylinder.
Dec 2023 — accumulators added. Modified syringes with compression springs were fitted in-line, markedly improving rapid joint inflation.
Replacing the pumps with a steel gas cylinder was recommended by the advisor in early 2023. It would substantially cut mass and improve manoeuvrability, but depends on solving the sealing problem first, and did not happen within the project window.
Prev: 3 · Webbed foot · Next: 5 · Electronics
