GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — bionic-frog/docs/04-pneumatics.md at main · purticra/bionic-frog

Expand file tree

/

04-pneumatics.md

Copy path
More file actions
More file actions

Latest commit

 

History

History
History
51 lines (35 loc) · 2.44 KB
/

04-pneumatics.md

Copy path

File metadata and controls

51 lines (35 loc) · 2.44 KB
Raw
Copy raw file
Download raw file
Outline
Edit and raw actions

4 · Pneumatic System

Topology

Battery
   │
   ├── Large pump ──┬── Accumulator ×2 ──┬── Valve pinlb ── left-rear soft joint
   │                │                    └── Valve pinrb ── right-rear soft joint
   │
   └── Small pump ──┬── Accumulator ×2 ──┬── Valve pinlf ── left-front soft joint
                    │                    ├── Valve pinrf ── right-front soft joint
                    │                    └── Valve pinpp ── sampling tube

Components

Component Qty Role
12 V air pump (large) 1 Drives both hind limbs — the primary power source
12 V air pump (small) 1 Drives forelimbs and the water sampler
Home-made accumulator 2 per pump Modified syringe + compression spring; stores pressure ahead of valve opening for a burst release
3-port 2-position 12 V solenoid valve 6 channels Channel switching and venting

Connections and sealing

  • Inside the hull — silicone tubing between components
  • At the hull wall — sealed fitting into the elliptical cylindrical interface
  • At the limb — interface into the silicone soft joint

Joint sealing (three layers): PTFE tape → rubber ring → cable tie.

This is a substantial improvement on the original bare press-fit, but it remains the project's longest-standing piece of technical debt. It is not a designed seal — it is three passive layers stacked until the leak rate became tolerable.

Two key revisions

Oct 2023 — line simplification. The original "silicone tube + fitting" approach was bulky, with a lot of uncut surplus tubing. Pressure sensors that had proven useless in bench testing (originally PRE1–PRE5 on pins 36/39/34/35/32) were removed along with their lines, freeing volume for a future gas cylinder.

Dec 2023 — accumulators added. Modified syringes with compression springs were fitted in-line, markedly improving rapid joint inflation.

Not implemented

Replacing the pumps with a steel gas cylinder was recommended by the advisor in early 2023. It would substantially cut mass and improve manoeuvrability, but depends on solving the sealing problem first, and did not happen within the project window.


Prev: 3 · Webbed foot · Next: 5 · Electronics

You are visitor 01402792 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.