GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — souk/docs/project/tasks.md at main · sakialabs/souk

Expand file tree

/

tasks.md

Copy path
More file actions
More file actions

Latest commit

 

History

History
History
777 lines (592 loc) · 42.9 KB
/

tasks.md

Copy path

File metadata and controls

777 lines (592 loc) · 42.9 KB
Raw
Copy raw file
Download raw file
Outline
Edit and raw actions

Souk: Tasks

Purpose

This document breaks the Souk roadmap into clear, actionable tasks.

Each task connects to a roadmap phase from docs/project/roadmap.md.

Task ID System

Task IDs follow this pattern:

R{phase}-T{task_number}

Example:

R3-T04: Set up PostgreSQL database

Status Legend

Use these statuses:

  • Not Started
  • In Progress
  • Blocked
  • Review
  • Done
  • Parked

Priority Legend

Use these priorities:

  • P0: Critical for MVP
  • P1: Important
  • P2: Nice to have
  • P3: Future

R1: Product Framing and Discovery

Goal

Clarify what Souk is, who it serves, and what the first version should focus on.

ID Task Priority Status
R1-T01 Finalize vision and mission doc P0 Done
R1-T02 Finalize product framing doc P0 Done
R1-T03 Define user roles P0 Done
R1-T04 Define MVP boundaries P0 Done
R1-T05 Define early product categories P0 Done
R1-T06 Prepare community partner discussion notes P0 Done
R1-T07 Create vendor discovery questions P0 Done
R1-T08 Create customer discovery questions P1 Done
R1-T09 Identify 5 to 10 potential pilot vendors P0 Not Started
R1-T10 Validate working name and basic brand direction P1 Done
R1-T11 List open questions, assumptions, and risks P1 Not Started

R1 Completion Criteria

  • Vision and mission are clear
  • MVP scope is realistic
  • User roles are defined
  • First vendor and customer discovery questions are ready
  • Pilot direction is clear enough to plan

R2: Requirements and System Planning

Goal

Turn the idea into clear requirements, system design, and technical decisions.

ID Task Priority Status
R2-T01 Finalize requirements doc P0 Done
R2-T02 Finalize system design doc P0 Done
R2-T03 Finalize tech stack doc P0 Done
R2-T04 Create accessibility doc P1 Done
R2-T05 Create internationalization doc P1 Not Started
R2-T06 Create data and ML strategy doc P1 Not Started
R2-T07 Define database schema draft P0 Done
R2-T08 Define admin workflows P0 Done
R2-T09 Define vendor application flow P0 Done
R2-T10 Define customer inquiry flow P0 Done
R2-T11 Define search and filter behavior P1 Not Started
R2-T12 Define analytics events P1 Not Started
R2-T13 Define MVP security requirements P0 Not Started
R2-T14 Define out-of-scope features P0 Done
R2-T15 Define visual style system P1 Done

R2 Completion Criteria

  • MVP requirements are clear
  • System design is clear
  • Tech stack is decided
  • Admin-managed workflow is ready to build
  • Database and data strategy are ready for implementation

R3: MVP Foundation Build

Goal

Build the technical foundation for the Souk MVP.

ID Task Priority Status
R3-T01 Create Next.js project P0 Done
R3-T02 Add TypeScript P0 Done
R3-T03 Add Tailwind CSS P0 Done
R3-T04 Add shadcn/ui P1 Done
R3-T05 Add Lucide icons P2 Done
R3-T06 Set up app folder structure P0 Done
R3-T07 Set up locale-based routing P0 Done
R3-T08 Add translation files for English, French, Arabic, and Spanish P0 Done
R3-T09 Add RTL support foundation for Arabic P0 Done
R3-T10 Add Drizzle ORM P0 Done
R3-T11 Set up local PostgreSQL database P0 Done
R3-T12 Create initial database schema P0 Done
R3-T13 Add seed script P1 Done
R3-T14 Add basic layout and navigation P0 Done
R3-T15 Add admin login foundation P0 Done
R3-T16 Protect admin routes P0 Done
R3-T17 Add environment variable setup P0 Done
R3-T18 Add basic error and loading patterns P1 Done
R3-T19 Organize repo into web, api, mobile, docs, and scripts folders P0 Done
R3-T20 Add FastAPI backend foundation P1 Done
R3-T21 Add mobile and community-market planning lane P2 Done
R3-T22 Add contributor scripts and local environment setup P1 Done
R3-T23 Add shared skeleton and motion primitives P1 Done
R3-T24 Add stable local Docker container names P2 Done

R3 Completion Criteria

  • App runs locally
  • PostgreSQL database works
  • Public routes work
  • Admin routes are protected
  • Multilingual routing foundation exists
  • Basic UI foundation is ready

R4: Core Marketplace Build

Goal

Build the main customer-facing and admin-managed marketplace features.

Public Marketplace

ID Task Priority Status
R4-T01 Build homepage P0 Done
R4-T02 Build vendor listing page P0 Done
R4-T03 Build vendor profile page P0 Done
R4-T04 Build product listing page P0 Done
R4-T05 Build product detail page P0 Done
R4-T06 Build category browsing P0 Done
R4-T07 Build search input P0 Done
R4-T08 Build category filters P0 Done
R4-T09 Build location filter P1 Done
R4-T10 Build language filter P1 Done
R4-T11 Build featured vendors section P1 Done
R4-T12 Build featured products section P1 Done
R4-T13 Build About page P1 Done
R4-T14 Build language switcher P0 Done

Forms

ID Task Priority Status
R4-T15 Build customer inquiry form P0 Done
R4-T16 Add inquiry form validation P0 Done
R4-T17 Save inquiries to database P0 Done
R4-T18 Build vendor application form P0 Done
R4-T19 Add vendor application validation P0 Done
R4-T20 Save vendor applications to database P0 Done
R4-T21 Add success and error states for forms P0 Done
R4-T22 Add spam protection strategy P1 Done
R4-T39 Add inquiry basket helper P1 Done

Admin Dashboard

ID Task Priority Status
R4-T23 Build admin dashboard home P0 Done
R4-T24 Build vendor applications admin page P0 Done
R4-T25 Build vendor application review flow P0 Done
R4-T26 Build vendor management page P0 Done
R4-T27 Build create vendor form P0 Done
R4-T28 Build edit vendor form P0 Done
R4-T29 Build product management page P0 Done
R4-T30 Build create product form P0 Done
R4-T31 Build edit product form P0 Done
R4-T32 Build category management page P0 Done
R4-T33 Build inquiry management page P0 Done
R4-T34 Add status controls for vendors, products, applications, and inquiries P0 Done
R4-T35 Add featured controls for vendors and products P1 Done
R4-T36 Add image upload support P0 Done
R4-T37 Add image alt text fields P0 Done
R4-T38 Add admin empty states P1 Done

R4 Completion Criteria

  • Visitors can browse vendors and products
  • Customers can submit inquiries
  • Optional basket-like UX stays inquiry-first and grouped by vendor
  • Vendor applicants can submit applications
  • Admins can manage marketplace content
  • Unapproved content stays hidden
  • Core flows work on mobile and desktop

R5: Quality, Data, and Pilot Readiness

Goal

Polish the MVP and prepare it for a small public pilot.

ID Task Priority Status
R5-T01 Run accessibility review on public pages P0 Done
R5-T02 Run accessibility review on admin pages P1 Review
R5-T03 Improve keyboard navigation P0 Done
R5-T04 Improve focus states P0 Done
R5-T05 Check colour contrast P0 Done
R5-T06 Improve mobile layouts P0 Review
R5-T07 Improve empty states P1 Done
R5-T08 Improve form validation messages P0 Done
R5-T09 Add event tracking helper P0 Done
R5-T10 Track page views P1 Done
R5-T11 Track vendor views P0 Done
R5-T12 Track product views P0 Done
R5-T13 Track search submissions P0 Done
R5-T14 Track filter usage P1 Done
R5-T15 Track inquiry submissions P0 Done
R5-T16 Track vendor application submissions P0 Done
R5-T17 Track language changes P1 Done
R5-T18 Add basic admin metrics P1 Done
R5-T19 Create privacy page P0 Done
R5-T20 Create terms page P0 Done
R5-T21 Test with seed vendor data P0 Done
R5-T22 Test with early users P0 Blocked
R5-T23 Fix confusing user flows P0 Blocked
R5-T24 Create pilot launch checklist P0 Done
R5-T25 Create known issues list P1 Done
R5-T26 Finalize public UI polish P0 Done
R5-T27 Prepare Netlify demo deployment P0 Done
R5-T28 Fix dark-mode public CTA colour states P0 Done
R5-T29 Remove decorative public labels and icons P0 Done
R5-T30 Add read-only public fallback for DB-free deployments P0 Done
R5-T31 Polish marketplace product, basket, and discovery UX P0 Done
R5-T32 Harden inquiry basket edge cases and focused tests P0 Done
R5-T33 Add account-ready basket and onboarding boundaries P1 Done
R5-T34 Add preview-only vendor onboarding prototype P1 Done
R5-T35 Prepare shipping, payment, security, and deployment decision docs P1 Done

R5 Completion Criteria

  • Core pages are usable and accessible
  • Forms are clear and reliable
  • Basic analytics are tracked
  • Privacy and terms pages exist
  • The MVP is ready for a small pilot

R6: Public Pilot

Goal

Launch Souk with a small group of vendors and learn from real usage.

ID Task Priority Status
R6-T01 Confirm pilot vendor list P0 Blocked
R6-T02 Collect vendor profile information P0 Blocked
R6-T03 Collect product information P0 Blocked
R6-T04 Collect product and vendor images P0 Blocked
R6-T05 Add real vendor profiles P0 Blocked
R6-T06 Add real product listings P0 Blocked
R6-T07 Review vendor profiles for quality P0 Blocked
R6-T08 Review product listings for quality P0 Blocked
R6-T09 Launch public pilot P0 Not Started
R6-T10 Promote pilot through community channels P1 Not Started
R6-T11 Monitor marketplace usage P0 Not Started
R6-T12 Monitor customer inquiries P0 Not Started
R6-T13 Collect vendor feedback P0 Not Started
R6-T14 Collect customer feedback P0 Not Started
R6-T15 Review search behavior P1 Not Started
R6-T16 Review category performance P1 Not Started
R6-T17 Review language usage P1 Not Started
R6-T18 Identify missing features P0 Not Started
R6-T19 Write pilot report P0 Not Started
R6-T20 Update roadmap after pilot P0 Not Started
R6-T21 Update requirements after pilot P0 Not Started
R6-T22 Update tasks after pilot P0 Not Started

R6 Completion Criteria

  • At least 5 vendors are onboarded
  • Customers can browse and inquire
  • Vendors feel professionally represented
  • Souk generates useful inquiries or leads
  • Feedback gives clear direction for the next phase

R7: Marketplace Expansion

Goal

Turn Souk from an admin-managed pilot into a stronger marketplace platform.

These tasks should generally stay parked until the public pilot proves demand. Supabase and optional customer accounts are now in review because customer onboarding has been raised as a possible acceleration path.

ID Task Priority Status
R7-T01 Review pilot results and choose expansion features P0 Parked
R7-T02 Review managed PostgreSQL hosting and backup needs P0 Parked
R7-T03 Move production services to Supabase if needed P1 Review
R7-T04 Add production image storage P0 Parked
R7-T05 Add vendor accounts P1 Parked
R7-T06 Add vendor dashboard P1 Parked
R7-T07 Add vendor product self-management P1 Parked
R7-T08 Add optional customer accounts P1 Review
R7-T09 Add saved products P2 Parked
R7-T10 Add saved vendors P2 Parked
R7-T11 Add reviews or trust signals P2 Parked
R7-T12 Add subscription billing P1 Parked
R7-T13 Add online checkout P2 Parked
R7-T14 Add order management P2 Parked
R7-T15 Add advanced search P1 Parked
R7-T16 Add vendor analytics P1 Parked
R7-T17 Add community partner pages P2 Parked
R7-T18 Add stronger admin automation P1 Parked
R7-T19 Add more language support P2 Parked
R7-T20 Add monitoring and error tracking P1 Parked
R7-T21 Add publish-readiness checklist per vendor/product P1 Parked
R7-T22 Add inquiry CRM saved replies and aging alerts P1 Parked
R7-T23 Add vendor listing quality queue P1 Parked
R7-T24 Add curated collection pages P2 Parked
R7-T25 Add multilingual search synonyms P1 Parked
R7-T26 Add inquiry basket persistence P2 Parked
R7-T27 Add cart and Stripe Checkout P2 Parked
R7-T28 Add customer dashboard P2 Parked

R7 Completion Criteria

  • Vendors can manage more of their own content
  • Souk can support more vendors without manual chaos
  • The pricing model is validated
  • The platform is ready for broader growth

R8: Data and Intelligence Layer

Goal

Use data science and machine learning to improve discovery, search, recommendations, and vendor support.

These tasks should come after Souk has enough real marketplace data.

ID Task Priority Status
R8-T01 Create data dictionary P1 Parked
R8-T02 Create analytics dashboard P1 Parked
R8-T03 Analyze product views P1 Parked
R8-T04 Analyze vendor views P1 Parked
R8-T05 Analyze search queries P1 Parked
R8-T06 Analyze inquiry conversion P1 Parked
R8-T07 Build popular products feature P1 Parked
R8-T08 Build popular vendors feature P1 Parked
R8-T09 Build trending categories feature P1 Parked
R8-T10 Build related products by tags P2 Parked
R8-T11 Build related vendors by category P2 Parked
R8-T12 Prototype TF-IDF product similarity P2 Parked
R8-T13 Prototype nearest-neighbor recommendations P2 Parked
R8-T14 Prototype category suggestions P2 Parked
R8-T15 Prototype tag suggestions P2 Parked
R8-T16 Prototype duplicate listing detection P2 Parked
R8-T17 Prototype semantic search P3 Parked
R8-T18 Prototype multilingual embeddings P3 Parked
R8-T19 Prototype AI-assisted product descriptions P3 Parked
R8-T20 Prototype AI-assisted translation drafts P3 Parked
R8-T21 Prototype product image similarity P3 Parked
R8-T22 Write responsible AI notes P1 Parked

R8 Completion Criteria

  • Data improves marketplace decisions
  • Search becomes more useful
  • Vendors receive better listing support
  • Customers discover relevant products faster
  • AI features support trust, accessibility, and discovery

First Sprint Recommendation

Sprint 1: Docs and Setup

Focus on getting the repo ready and the foundation clean.

ID Task Priority
R1-T02 Finalize product framing doc P0
R1-T05 Define early product categories P0
R1-T06 Prepare community partner discussion notes P0
R1-T07 Create vendor discovery questions P0
R1-T08 Create customer discovery questions P1
R2-T07 Define database schema draft P0
R2-T08 Define admin workflows P0
R2-T09 Define vendor application flow P0
R2-T10 Define customer inquiry flow P0
R3-T01 Create Next.js project P0
R3-T03 Add Tailwind CSS P0
R3-T10 Add Drizzle ORM P0
R3-T11 Set up local PostgreSQL database P0

Sprint 1 Definition of Done

Sprint 1 is done when:

  • Core docs are ready
  • Product categories are drafted
  • Discovery questions are ready
  • Database schema is drafted
  • Admin, vendor application, and inquiry flows are drafted
  • Next.js app runs locally
  • PostgreSQL and Drizzle are connected

Current Focus

Current phase:

R5: Quality, Data, and Pilot Readiness

Next build phase:

R6: Public Pilot

Main priority:

Finish the remaining review checks, polish stakeholder-facing product flows, then decide whether optional customer onboarding should be accelerated before the public pilot.

Latest Implementation Notes

2026-07-12

Live Marketplace Foundation Sprint

Completed a safe foundation pass without activating accounts, checkout, payouts, production shipping, or real order processing:

  • Hardened the browser-local inquiry basket with validation cleanup, final-item clearing, vendor-group preservation, same-tab/cross-tab subscription helpers, and an account-ready service boundary.
  • Added focused basket tests for add, duplicate prevention, remove, final-item clearing, clear-all, vendor grouping, invalid stored data, multi-vendor preservation, merging, and change notifications.
  • Added a non-blocking basket account preview that keeps guest continuation active and labels account behavior as preview-only.
  • Added a local-only vendor onboarding prototype on /apply with fake sample data, browser save/resume, progress steps, category selection, pickup/shipping preferences, first-product preview, image preview, review, and confirmation.
  • Added disabled provider-neutral shipping and payment boundaries plus privacy-safe analytics metadata filtering.
  • Created customer onboarding, cart and checkout, vendor onboarding, shipping, payments, security, deployment, and ADR docs with stakeholder-dependent choices marked Pending stakeholder approval.

Verification:

  • npm run test:basket

2026-07-10

Marketplace UX Polish

Completed a consolidated public marketplace polish pass:

  • Reworked product detail pages into a cleaner image-led marketplace layout with seller context, balanced pickup/shipping details, related-product discovery, and smoother inquiry scrolling.
  • Added global anonymous inquiry-basket access, item-level review/edit actions, and a dedicated basket page while keeping the basket browser-local, grouped by vendor, and sign-in free.
  • Improved homepage discovery with clickable vendor/product cards, balanced featured-vendor cards, and a button-driven Fresh finds rail without nested scrollbars.
  • Simplified the marketplace header to a prominent search row plus flat direct links on the original shared header surface, removed public Manage access, and renamed the footer support column to Support.
  • Moved optional Supabase/customer onboarding into review while keeping required customer accounts, checkout, orders, and payments outside the pilot path.

Verification:

  • npm run typecheck
  • npm run lint
  • npm run build
  • Browser and CDP audits covered product detail light/dark/mobile layouts, anonymous basket add/remove flows, sticky header-basket editing, /en/basket review actions, Fresh finds rail movement, hidden scrollbar styling, and 390px mobile layouts without horizontal overflow.

2026-07-07

Inquiry-First MVP Boundary

Locked the accounts, cart, and payments decision into the MVP plan:

  • Kept public browsing, customer inquiries, vendor applications, admin-managed publishing, and admin-only authentication as the active MVP shape.
  • Added a lightweight inquiry basket that lets visitors save products across vendors and prefill editable inquiry messages by vendor.
  • Kept the basket in browser storage only; it does not create customer accounts, carts, orders, payments, checkout sessions, or vendor dashboards.
  • Parked Supabase Auth, customer accounts, saved products, persistent inquiry baskets, carts, Stripe Checkout, orders, payments, customer dashboards, and vendor dashboards until after pilot validation.

Verification:

  • npm run typecheck
  • npm run lint
  • npm run build
  • Local HTTP smoke checks returned 200 OK for /en/products and /en/products/hand-building-clay-workshop.
  • Hydrated Chrome/CDP check confirmed the inquiry basket button, no-checkout note, basket storage, CTA navigation, and inquiry message prefill.

2026-07-06

Public UI Label/Icon Cleanup and Local Container Names

Completed a focused R5/R3 cleanup pass:

  • Removed decorative public homepage eyebrow labels, visible "Featured" chips, vendor callout chips, and public link/button icons from the shopper-facing pages.
  • Kept functional controls such as search, menu, settings, theme, language, and product tags where they support navigation or discovery.
  • Replaced missing product-image icon placeholders with text-based category fallback visuals.
  • Simplified public header and footer links so navigation reads as text-first rather than icon-first.
  • Added stable Docker Compose container names for local Postgres, web, and API services: souk-postgres, souk-web, and souk-api.
  • Clarified that real submissions and admin workflows still need a reachable production PostgreSQL database.

Read-Only Public Deployment Fallback

Added a frontend-only safety path for stakeholder demos:

  • Public pages now use live PostgreSQL data when available, but fall back to bundled marketplace seed data when DATABASE_URL is missing or unreachable.
  • Vendor application and inquiry submissions now return a localized read-only preview message instead of crashing when no database is connected.
  • Marketplace event tracking becomes a no-op when the database is unavailable.
  • The seed catalogue is import-safe so public fallback data can reuse the same demo vendors, products, categories, and images without opening a database connection.
  • Added SOUK_PUBLIC_DATA_MODE=static as an explicit demo override for frontend-only review environments.

Admin pages, admin actions, and real pilot submissions still require PostgreSQL before the app should collect live data.

Verification:

  • npm run typecheck
  • npm run lint
  • npm run build
  • SOUK_PUBLIC_DATA_MODE=static npm run build
  • npm run db:seed
  • docker compose config
  • docker compose up -d --force-recreate db
  • Static-mode production smoke checks returned 200 OK for /en, /en/products, /en/vendors, /en/products/hand-building-clay-workshop, /en/vendors/amara-bead-house, and /en/apply.
  • Headless Chromium homepage screenshot at 1440px wide.
  • Headless Chromium products-page screenshot in static mode.

2026-06-20

PostgreSQL Persistence Baseline

Completed the first infrastructure hardening pass from the expansion lane:

  • Moved the web database layer from SQLite-specific Drizzle schema/client code to PostgreSQL.
  • Added a Docker Compose db service using Postgres 16 with a healthcheck and persistent local volume.
  • Regenerated Drizzle migrations as a PostgreSQL baseline with JSONB fields, timestamptz columns, booleans, foreign keys, and practical queue/search indexes.
  • Switched local defaults and .env.example to postgres://souk:souk@localhost:5432/souk.
  • Removed the SQLite demo database build hook and native SQLite runtime dependency from the web app.
  • Kept the Next.js app talking to Drizzle directly; the API remains reserved for mobile, integrations, background jobs, and data/ML boundaries.
  • Added the infrastructure evolution note covering the Postgres, API, Supabase Auth, and Stripe sequence.
  • Parked publish-readiness, inquiry CRM, listing-quality queue, curated collections, and multilingual synonym work as post-pilot expansion candidates.

Verification:

  • npm run typecheck
  • npm run lint
  • npm run build
  • docker compose config
  • npm run db:generate

Blocked verification:

  • Live docker compose up -d db, npm run db:migrate, and npm run db:seed could not be completed in this environment because the Docker daemon socket was unavailable.

2026-06-19

Netlify Demo Prep and Dark CTA Finish

Completed a focused R5 deployment and colour-state pass:

  • Replaced the footer vendor-application label with the shorter "Apply" text while leaving the header and hero CTA language intact.
  • Added Netlify demo configuration with the web app as the build base, pinned Node version metadata, and production build settings.
  • Included the packaged SQLite demo database in Next.js output tracing, added a postbuild copy into .next/server, and added a Netlify fallback that copies it to temporary runtime storage when no production DATABASE_URL is configured.
  • Documented the temporary Netlify demo storage caveat in the pilot checklist and known issues.
  • Simplified shared outline button colours back to theme tokens and fixed the hero "Bring your table" CTA so dark mode uses a cream surface with espresso text.
  • Verified with npm run typecheck, npm run lint, NETLIFY=1 NEXT_TELEMETRY_DISABLED=1 npm run build, production preview CSS hash checks, and Chromium light/dark homepage checks.

Header Shape and Favicon Radius Follow-Up

Completed a focused R5 header shape pass:

  • Replaced pill/circle-heavy header radii with rounded-rectangle tokens for the public header shell, logo badge, utility controls, search submit, and main header CTA.
  • Regenerated the PNG, SVG, app icon, and ICO favicon assets as a rounded-square basket badge.
  • Updated the homepage loading header skeleton so it matches the new header silhouette.
  • Moved the mobile header CTA out of the narrow header at the same breakpoint as the compact menu label so the header stays contained.
  • Verified with typecheck, lint, build, a live CSS asset check, and styled Chromium screenshots for desktop and the narrowest reliable CLI viewport.

Short-Page Footer Finish

Completed a focused R5 footer alignment pass:

  • Added a shared full-height contract to the localized public shell, page transition wrapper, and page main elements.
  • Kept public pages painted with the normal Souk background while letting the document finish in the footer's espresso tone, removing the light blank strip below short-page footers.
  • Preserved the footer's natural document flow so longer pages keep scrolling normally.
  • Verified with typecheck, lint, build, and tall Chromium screenshots for contact, terms, and privacy.

Product Strip Copy and Card Rhythm Follow-Up

Completed a focused R5 homepage product strip polish pass:

  • Replaced the product-strip helper copy with warmer market-table language that better matches Souk's tone.
  • Removed the horizontal strip edge fade so product cards no longer look visually faded at the sides.
  • Reduced the product strip card shadow to match the calmer public card language.
  • Tightened product card height, image height, body padding, and copy clamps so the action row sits naturally without extra bottom dead space.
  • Verified with typecheck, lint, build, and Chromium screenshots for desktop and mobile homepage.

Hidden-Scroll Product Bento and CTA Icon Follow-Up

Completed a focused R5 public interaction polish pass:

  • Removed the icon from the main header CTA so the button reads cleanly as "Bring your table."
  • Reworked the homepage product bento into a horizontal snap strip with hidden scrollbars, touch momentum, and partial-card peeking.
  • Gave product cards consistent strip height and arranged title, copy, price, and action rows so the cards align without awkward bottom gaps.
  • Moved the footer Home link to the top of the Community list and switched it to a home icon.
  • Verified with typecheck, lint, build, and Chromium screenshots for desktop homepage, mobile homepage, and footer/contact.

Public Bento Copy and Vendor Story Follow-Up

Completed a focused R5 public polish follow-up:

  • Replaced the literal homepage bento heading with market-table language that better matches Souk's voice.
  • Removed forced equal-height behavior from homepage bento product cards so shorter cards no longer carry empty bottom space.
  • Changed featured vendor callouts from stretched bars to content-sized pills.
  • Simplified the centered header dropdown triggers by removing their leading icons and restored the main CTA to "Bring your table."
  • Added delayed close transitions for header dropdowns so exits feel smoother.
  • Reworked the footer to use a Community group, remove the footer GitHub link, and add icons to every footer link.
  • Moved vendor story copy into a compact card below the vendor name and description while keeping vendor details focused on facts and contact actions.
  • Verified with typecheck, lint, build, and Chromium screenshots for homepage, footer/contact, and vendor detail pages.

Public Motion and Rail Polish

Completed a focused R5 public motion and horizontal navigation pass:

  • Added Framer Motion to the web app and introduced shared public motion primitives for route transitions, hero content, card grids, and card rails.
  • Added a third centered header dropdown group for Join actions while keeping management access under settings and the Apply CTA on roomy headers.
  • Moved expandable header search into an inline header overlay with a wider field so the placeholder has room to breathe.
  • Reworked public horizontal card rails to use intentional bottom scrollbar styling instead of hidden scrollbars.
  • Verified with typecheck, lint, build, and Chromium screenshots for desktop and narrow public pages.

Public Bento, Contact, and Footer Polish

Completed a focused R5 public layout repair pass:

  • Replaced the homepage product and vendor rails with responsive bento grids so cards no longer clip or depend on horizontal scrollbar tracks.
  • Updated the homepage loading state to match the current hero, stats, and bento sections instead of showing skeletons for moved About content.
  • Added a public Contact page with GitHub, issue, vendor browsing, and application paths, then wired it into the header and footer.
  • Moved vendor story copy into the vendor hero area and gave vendor products the main detail-page space.
  • Expanded the public footer with browse, community, pilot, and bottom-message links.
  • Added a header popover controller so dropdown groups close when another group, a panel action, outside click, or Escape is used.
  • Re-tuned dark-mode public CTA and active product-filter colors away from muddy brown states.
  • Verified with typecheck, lint, build, and Chromium screenshots for homepage desktop/mobile, products, contact, and vendor detail pages.

Public Header and Hero Flow Polish

Completed a focused R5 public navigation polish pass:

  • Made the public header fixed and glassier so it stays present while the hero image runs behind it from the top of the viewport.
  • Replaced the crowded standalone header links with centered Explore and Info dropdown groups.
  • Moved search into an expandable icon control and grouped theme, language, and management access under a settings dropdown.
  • Kept the vendor application CTA as the final header action on desktop and narrow layouts.
  • Verified the homepage header/hero composition in desktop and narrow Chromium screenshots, plus product search routing.

Dark Mode Public Readability Polish

Completed a focused R5 public visual accessibility pass:

  • Moved the homepage's high-emphasis public text onto semantic market text classes so dark mode no longer depends on light-mode token overrides.
  • Re-tuned the homepage oasis bubble to a cooler rain-washed teal with warm ivory, saffron, and mint text contrast.
  • Moved approved vendor, product, and category counts into the oasis bubble so the card carries useful MVP data instead of decorative filler.
  • Limited the dot-and-line motif to the loading skeleton version of the oasis bubble and kept the real homepage content free of fake skeleton marks.
  • Verified the dark homepage in desktop and mobile Chromium renders, including mobile containment for the oasis card.

2026-06-18

Public Header Visual Refinement

Refined the public visual direction without expanding MVP scope:

  • Replaced the placeholder header mark with the basket logo asset and wired it as the app favicon.
  • Added an emoji light/dark theme toggle using the existing warm Souk colour system.
  • Simplified the language switcher into an emoji menu with localized language names.
  • Removed public UI gradients in favour of flat earthy sand, ivory, clay, spice, saffron, and oasis accent surfaces.
  • Updated docs/architecture/visual-style.md with the sandy beach oasis marketplace direction.

Final Public Polish

Finished the public marketplace polish pass:

  • Added a blue oasis tone to the homepage market-entrance callout while preserving the sandy stall visual.
  • Removed the ambiguous product placeholder tag motif.
  • Used category-specific icons on product placeholders when listings do not have images yet.
  • Regenerated the favicon from the basket artwork and added a basket emoji SVG fallback.
  • Rounded the header logo/home hover state to match the soft header shell.

2026-06-17

Public UI Theme Direction

Completed a warm Souk public UI direction pass:

  • Adopted the 🧺 Souk placeholder brand in the public floating header.
  • Replaced the green-heavy public palette with ivory, sand, straw, clay, spice, saffron, date, espresso, cocoa, turquoise, indigo, and rose tokens.
  • Reworked public page backgrounds, hero bands, cards, badges, form surfaces, and hover/focus transitions around the open-market direction.
  • Rebuilt the homepage entrance with search, CTAs, a pilot note, a horizontal market-stall scroller, stall-style category cards, visual product placeholders, warmer featured vendor/product cards, and a closing market-note footer.
  • Carried the same public card language through vendor, product, detail, apply, about, privacy, and terms surfaces without changing marketplace data or admin workflows.
  • Verified with npm run typecheck, npm run lint, npm run build, a production /en smoke check, and headless Chromium homepage screenshots. The desktop render was verified; the narrow CLI screenshot path cropped the page and should not replace a hands-on mobile browser pass before pilot.

R5/R6 Readiness

Completed a focused R5/R6 readiness slice:

  • Added dedicated language_changed analytics through the shared language switcher.
  • Added language-change counts to the admin activity metrics.
  • Added localized skip-to-content links and post-header focus targets for public and admin surfaces.
  • Verified the core semantic colour pairs for light and dark mode against WCAG AA contrast targets.
  • Added docs/project/changelog.md as a short status log.
  • Moved early user testing and confusing-flow fixes to Blocked until real pilot users provide feedback.
  • Marked R6 vendor/content onboarding rows as Blocked until the real pilot vendor list, profile information, product information, and images are available.

R5 still needs an authenticated admin review and visual mobile pass before the public pilot date.

R4 Admin-Managed Content

Completed the R4 admin-managed content slice:

  • Added protected admin management pages for vendors, products, and categories.
  • Added create and edit forms for vendors and products on their management pages.
  • Added create and edit support for categories with sort order, optional parent category, and active/hidden status.
  • Added vendor and product status controls, completing the status-control set across applications, inquiries, vendors, and products.
  • Added featured controls for vendors and products.
  • Added MVP image support through managed image URL fields, plus required product image alt text.
  • Rendered managed product images on product listing and product detail pages when image URLs are provided.
  • Added honeypot spam protection to public inquiry and vendor application forms.
  • Improved admin empty states for review queues and content management pages.

R4 is now feature-complete for the admin-managed MVP. R4-T36 is satisfied as hosted image URL support for the pilot; production image storage remains parked in R7.

This handed the project into R5 quality and pilot validation.

2026-06-16

Completed a focused R4/R5 pilot-readiness slice:

  • Added public location and language filters to product browsing.
  • Replaced the public vendor application placeholder with a validated, database-backed form.
  • Added customer inquiry forms to approved vendor and product detail pages.
  • Added protected admin queues for vendor applications and customer inquiries.
  • Added admin status controls for applications and inquiries.
  • Added basic marketplace event tracking for page views, vendor views, product views, searches, filters, inquiry submissions, and vendor application submissions.
  • Added privacy and terms pages for pilot readiness.
  • Added docs/project/pilot-launch-checklist.md and docs/project/known-issues.md.

The next R4 lane was completed on 2026-06-17.

You are visitor 01402792 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.