This directory contains exhaustive battle plans for the Unheaded infrastructure deployment.
File: Session_74_2026_02_27_BATTLE-PLAN-part1.md
Status: PART 1 COMPLETE ✓
Size: 2,149 lines, 72 KB
Phases Covered: 0, 1, 2 (+ outline of 3-12)
Duration: ~100 minutes execution time for Part 1
-
Phase 0: Intelligence & Environment Verification (15 steps, ~25 min)
- Git validation, build/test PASS verification, eBPF ELF targets
- Toolchain inventory (Go 1.24+, Rust, Nix, Docker, bpftool, etc.)
-
Phase 1: Wire Format Freeze — S67 RFC Overlap (40 steps, ~40 min)
- Monad draft-05 wire format analysis (8-bit flags breakdown)
- RFC collision detection, IANA registries draft
- Breaking changes identification & scoring
- Version locks: Monad v5.0.0, Sophia v2.0.0, Wotan v1.0.0
-
Phase 2: WEST Bare Metal — NixOS Bootstrap (56 steps total, shown through Step 42, ~35 min)
- WEST hardware verification
- NixOS installation from flake.nix (partition → install → reboot)
- FRR BGP AS 65001 configuration
- Firewall rules (Moat Ghost pattern: iptables DROP default)
- WireGuard tunnel setup (fd00:dead:beef::1/64)
- IPv6 stack verification, BGP peering readiness
✓ Exhaustive Style (S42-S50 aligned)
- Every step has exact bash command(s)
- 40+ debug branches [D] with fallback strategies
- 3 commit checkpoints [C] (Phase 0, 1, 2)
- Clear phase EXIT GATES with completion checklists
✓ Services Coverage
- All 23 Unheaded services documented
- Deployment order: doom → doom-bridge → ... → waf
- Port assignments (Doom Range 16666-26666)
- Health checks, service discovery, log aggregation
✓ Infrastructure Design
- WEST: AS 65001, fd00:dead:beef::1/64
- EAST: AS 65002, fd00:dead:beef::2/64 (Phase 4+)
- BGP peering, WireGuard tunnel, IPv6 routing
- Firewall (Moat Ghost), security hardening
-
Start Here: Phase 0 — Intelligence & Environment Verification
# Step 1: Validate git repository cd /tmp/unheaded git status git log --oneline -10 git branch -a | grep -i s74
-
Execute Phase 0: Steps 1-15 (~25 min)
-
Execute Phase 1: Steps 16-55 (~40 min)
-
Execute Phase 2: Steps 30-85 (~35+ min for full phase)
PART 1 STATUS: COMPLETE ✓
- Phase 0 definition: COMPLETE
- Phase 1 definition: COMPLETE
- Phase 2 definition: COMPLETE (through Step 42, with full outline)
- Phases 3-12: Outlined in agent assignment matrix
READY FOR:
- Phase 0 execution (Environment verification)
- Phase 1 execution (Wire format freeze)
- Phase 2 execution (WEST NixOS bootstrap)
PENDING:
- PART 2 (Phases 3-12, ~250+ additional steps, 20+ hours)
| Tag | Meaning |
|---|---|
| [HARDWARE] | Hardware verification/physical operations |
| [GIT] | Git operations, branching, commits |
| [BUILD] | Build operations (go, cargo, nix) |
| [TEST] | Test execution |
| [EBPF] | eBPF compilation and verification |
| [NIXOS] | NixOS installation and boot |
| [NETWORK] | Network configuration, routing |
| [FIREWALL] | Firewall rules and security |
| [WIREGUARD] | WireGuard tunnel setup |
| [BGP] | BGP routing configuration |
| [SERVICE] | Service deployment and health checks |
| [DISCOVERY] | Service discovery integration |
| [OBSERVABILITY] | Logging, metrics, tracing |
| [PROTOCOL] | Protocol specification work |
| [D] | Debug branch (failure recovery) |
| [C] | Commit checkpoint |
Before starting Phase 0:
- S73 complete (git repo accessible)
- go build ./... PASS
- go test ./... PASS
- 10+ eBPF ELF targets compiled
- Go 1.24+, Rust stable, Nix, Docker available
- WEST bare metal machine accessible
/references/
├── Session_74_2026_02_27_BATTLE-PLAN-part1.md (this file, 2,149 lines)
├── README.md (this index)
└── [Part 2 to be created] (forthcoming, Phases 3-12)
- Total Lines: 2,149
- Total Size: 72 KB
- Bash Commands: 70+
- Debug Branches: 40+
- Commit Checkpoints: 3
- Service Coverage: 23 unique services
- Phase Coverage: 0, 1, 2 (+ outline of 3-12)
- Time Estimate: ~100 min for Part 1 execution
Created: 2026-02-27 Author: Warmonger, Battle Planner of the Unheaded Kingdom Status: PRODUCTION-READY for Phase 0-2 execution