GeezerVisonThe World Wide Web, restored to 800 pixels of glory. |
| Home|About|Gaming cabinet|Archives|How it works|Starter sites |
GeezerVison is showing github.com — algorithms/heap/merge_sorted_k_lists.py at master · vspriya05/algorithms Expand file tree/ Copy pathmerge_sorted_k_lists.pyMore file actions 63 lines (49 loc) · 1.83 KB / Copy pathmerge_sorted_k_lists.pyFile metadata and controls63 lines (49 loc) · 1.83 KB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 """ Merge k sorted linked lists and return it as one sorted list. Analyze and describe its complexity. """ # Definition for singly-linked list. # class ListNode(object): # def __init__(self, x): # self.val = x # self.next = None from heapq import heappush, heappop, heapreplace, heapify def mergeKLists(lists): dummy = node = ListNode(0) h = [(n.val, n) for n in lists if n] heapify(h) while h: v, n = h[0] if n.next is None: heappop(h) #only change heap size when necessary else: heapreplace(h, (n.next.val, n.next)) node.next = n node = node.next return dummy.next from Queue import PriorityQueue def merge_k_lists(lists): dummy = ListNode(None) curr = dummy q = PriorityQueue() for node in lists: if node: q.put((node.val,node)) while q.qsize()>0: curr.next = q.get()[1] curr=curr.next if curr.next: q.put((curr.next.val, curr.next)) return dummy.next """ I think my code's complexity is also O(nlogk) and not using heap or priority queue, n means the total elements and k means the size of list. The mergeTwoLists functiony in my code comes from the problem Merge Two Sorted Lists whose complexity obviously is O(n), n is the sum of length of l1 and l2. To put it simpler, assume the k is 2^x, So the progress of combination is like a full binary tree, from bottom to top. So on every level of tree, the combination complexity is n, beacause every level have all n numbers without repetition. The level of tree is x, ie logk. So the complexity is O(nlogk). for example, 8 ListNode, and the length of every ListNode is x1, x2, x3, x4, x5, x6, x7, x8, total is n. on level 3: x1+x2, x3+x4, x5+x6, x7+x8 sum: n on level 2: x1+x2+x3+x4, x5+x6+x7+x8 sum: n on level 1: x1+x2+x3+x4+x5+x6+x7+x8 sum: n """ |
| You are visitor 01402792 — GeezerVison does not store the pages you look up. Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required. |