GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — EPIC: transactional e-mails — one design system across every sending path · Issue #828 · OpenResilienceInitiative/ORISO-Frontend

EPIC: transactional e-mails — one design system across every sending path #828

New issue
Copy link
New issue
Copy link
Open
Epic
43 / 4443 of 44 issues completed
Open
EPIC: transactional e-mails — one design system across every sending path#828
Epic
43 / 4443 of 44 issues completed
Copy link
Assignees
Shirloinshazia-k

Description

@Storypapst
Storypapst
opened on Jul 31, 2026
Issue body actions

In plain words

Every mail ORISO sends should look like it comes from the same sender, carry the same privacy promises, and be reviewable before it goes out. The design system for this exists in Storybook (Email/, 22 occasions, three tones, HTML + text). This epic closes the gap between that kit and what the platform really sends.

Status 2 October 2026: almost all of the code is merged to dev. What is left is a small set of open PRs, a few things that are not built yet, and proof that real mails arrive. Nothing has been deployed to Stage, and no mail has been checked in real mail clients.

1. Done: merged to dev

All 33 PRs that this epic used to track are merged (checked on GitHub, 2 Oct 2026). In everyday terms:

  • Design kit and decisions: the kit, all designed occasions, and the three decisions ADR-024 (who gets which mail), ADR-025 (UserService renders the mails itself), ADR-026 (tenant branding).
  • One mail server setting: Admin Settings is the single source for platform SMTP. Saving it updates Keycloak directly, with recovery. Tenants can choose PLATFORM or their own server (OWN). Unused Helm/Keycloak mail files are removed.
  • Mails in the new design: magic link, password reset, one-time code, welcome, supervisor changes, DPA/contract mails, SMTP test, reply mails, neutral free-text mail.
  • Branding and languages: one tenant brand for all mails, logo and preview in Admin, all seven app languages (also in the Keycloak theme).
  • New flows: contact-sheet mail, first-login password change for admin-created accounts, self-help appointment mail (switched off by default), occasion catalogue connected to the channels.
  • Cleanup: old mail layout removed, mail failures no longer log full addresses.

2. Built, but the PR is still open

Checked 28 October 2026: none of the PRs listed here on 2 October is still open. Eight were merged into dev. Three were closed with no net change, because their work had already reached dev through other PRs.

PR What it adds State on 28 Oct
Frontend #1415 Notification settings screen ✅ merged 13 Oct
UserService #1298 Unsubscribe link leads to a real page ✅ closed, work is in dev through UserService #1306 and #1340
UserService #1295 Real data for notification mails ✅ closed, work is in dev through UserService #1304
Frontend #1594 Feedback mail, neutral wording ✅ closed, work is in dev through Frontend #1578 and #1601
Frontend #1576 Contact-sheet request ✅ merged 2 Oct
AgencyService #320 Contact details per tenant ✅ merged 2 Oct
TenantService #280 Allowed mail purposes for tenant servers ✅ merged 2 Oct
TenantService #287 Reply-mail correlation for tenant servers ✅ merged 6 Oct
UserService #1324 No caching of SMTP availability errors ✅ merged 10 Oct
UserService #1314 Rejected one-time codes are not retried ✅ merged 2 Oct
ConsultingTypeService #162 Old DPA signing mail path removed ✅ merged 4 Oct

3. Not built yet (7 items)

# What is missing Ticket Why
1 Operator notice mail (maintenance): only draft + preview exist; recipients, confirmation, feed and the actual send are not built #876 Recipient scope still needs a product decision
2 Automatic received-mail test (real mailbox, privacy checks): only a draft runner E2E #52, draft PR #74 Branch choice open, adapters missing
3 General booking mail (appointments beyond self-help groups) #874 Deliberately deferred
4 Light-colour logo/brand policy for mails #1252 Policy undecided
5 Admin warning for unusual SMTP port/TLS and a saved tenant SMTP test button #1061; drafts Admin #1094, #1095, TenantService #290, #291 Only drafts
6 Checking mails in real mail clients (Outlook, Gmail, Apple Mail, …) #877 Acceptance only, nobody has done it
7 Receipt proof for every occasion on Dev, including invites and "contract signed" #1057 Needs deployment plus items 2 and 6

4. Still unproven

  • Merged is not deployed, and deployed is not accepted. No Stage rollout has happened.
  • Still to prove on Dev: first-admin setup, the four mails sent through the Admin-saved SMTP, key rotation and restart.
  • The sub-tickets are still open. They close when the real mail has been received, not when the PR is merged.

5. Decisions already made (keep)

  • Admin Settings / ConsultingTypeService is the only runtime source for platform SMTP. No provider defaults on a fresh install. Missing SMTP gives a named setup error.
  • Feedback mail follows the enabled email preference (approved 30 Sep).
  • No free-text composer for automatic mails (Storybook: automated free-text mail #865). Self-help appointment mail stays in this release; general booking stays out.

6. All sub-tickets, by topic

58 tickets (links only)
  • Kit and decisions: #859, #860, #861, #862
  • Mail designs: #863, #864, #865, #866, #867, #868
  • Senders moved to the kit: Frontend #869, #870, #873, #874, #875, #876; UserService #944, #945, #946, #989, #1288, #1296
  • Preferences and channels: #871, #872, #947
  • Mail server (SMTP): UserService #1253, #1254, #1272 (superseded), #1274, #1280, #1284, #1251; Admin #1061, #1084; Frontend #1562; TenantService #277, #279; ConsultingTypeService #165; Helm #241, #378, #383; Keycloak #13
  • Branding, languages, templates: UserService #1252, #1256, #1257, #1255, #1290, #1126; Frontend #1065, #1573
  • Contact sheet and accounts: Frontend #1575, #1058; UserService #1300, #1302; AgencyService #319
  • Acceptance: #877, #1057, E2E #52

7. Technical background (for developers, skip if you only need the status)

Why: shows the four mail paths the epic started from. The old long status history, per-PR commit hashes and score tables were removed on 2 Oct 2026 and remain in this issue's edit history.

Path A  MailService (Thymeleaf), EmailNotificationFacade; upstream service, no ORISO repo (ADR-025: UserService renders instead)
Path B  Direct SMTP from UserService: MagicLink, SupervisorAdded, DpaForward, SmtpTest
Path C  DB templates edited in Admin: InviteEmailTemplate (TENANT_INVITE, COUNSELLOR_INVITE, DPA_FORWARD)
Path D  Keycloak theme: ORISO-Keycloak themes/oriso/email (OTP, reset)
Notification lists that must line up: sent mails / in-app event_notification / user switches (NotificationsSettingsDTO) -> ADR-024

Current state — 28 October 2026

This block replaces the three dated blocks of 20 and 21 October (they remain in this issue's edit history). Sections 1 to 6 above are the state of 2 October, except section 2, which was updated on 28 October.

In short: the code for every sub-ticket is merged into dev, except the old PreDev mail script E2E #74, which is proposed for closing. Merged is not the same as deployed or accepted: no real mail has been checked in a mailbox for these tickets yet, and nothing has been checked in real mail clients.

Item What State
UserService #1376 Notification mails for #1373, #1374, #1375 ✅ merged into dev 24 Oct
Frontend #1752, #1767, #1666, UserService #1411 Frontend side and internal-chat mail ✅ merged into dev 21–24 Oct
E2E #74 Mail tests for E2E #52 💤 proposed for closing as superseded by E2E #81 (reason): a one-off PreDev script with fixed PreDev data. Closing is for a person
Frontend #877 Check mails in real mail clients 💤 needs a person; the automatic compatibility test is on dev
Every sub-ticket Real mail received on Dev 💤 not proven yet; sub-tickets stay open until it is

Still open, not fixed yet

  1. Dev receipt test runs with the E2E #81 runner under E2E #52. On 28 Oct its Dev consultant account oriso/dev/lisa.simpson could not log in (stored password rejected twice). E2E #92 switches the check to oriso/dev/maggie.simpson-trail.ist, which logs in and already receives ORISO mail; waiting for review.
  2. Run the received-mail check on Dev for every occasion (Frontend #1057).
  3. Real mail clients (Frontend #877).
  4. Two invite stories have no sender on dev: "tenant invite" and "counsellor invite" (Frontend #867). Keep or retire them is a product decision.
  5. UserService #1124 went only to PreDev. Whether its tenant branding and account-recovery changes reached dev some other way is not checked.

Tickets with no linked PR, checked one by one: 16 of 17 have their code or document on dev, and the one left (#877) is acceptance only. Several were delivered by PRs that are simply not linked to the ticket.

For developers — proof per ticket, read on origin/dev 28 Oct (Frontend 59d5248, UserService 21553b26b, Docs 5670a56):

FE#860/#861/#862  ADR-024/025/026 Accepted in ORISO-Docs oriso-platform/decisions/, Docs#135 merged dev 2026-09-23
FE#863-#866,#868  stories under src/emails/stories/ (FE#881 -> pre-dev, merge commit 41e53197c5 is in dev); templates used by UserService
FE#867            PARTIAL: einladung-freitext + avv-unterschrift sent (US#1228, FE#1517); einladung-traeger/-fachkraft have no sender
FE#873            WelcomeEmailService.java:81 via platform SMTP, called from CreateUserFacade.java:228
FE#877            acceptance only; src/emails/emailClientCompatibility.test.ts on dev (98208326f)
US#944/#945       US#958 -> pre-dev, squash d025cbb40c is in dev; both services use OrisoEmailRenderer
US#946            US#1238 merged dev 2026-09-23: DpaSigningMailRenderer.java:25; GlobalSmtpTestEmailService uses renderer
US#1254           US#1267 merged dev 2026-09-30: OrisoSmtpTransport.java:32-40 STARTTLS required, hostname check, 10 s timeouts
US#1255           US#1331 merged dev 2026-10-01: 3ed83a9f7 deletes BrandedEmailLayoutRenderer + 7 resources; comment shortening unverified
US#1257           US#1266 merged dev 2026-09-30: no single-line log call passes an address; multi-line calls + deployed logs unverified
US#1124           pre-dev only; b5d2a9454f, df31f98d02 not in dev
E2E#74            head 7a75429 = origin/emails-v2 + merge of dev; conflicts (add/add) in docs/email-evidence.md,
                  scripts/email-evidence.mjs, scripts/email-evidence.test.mjs resolved to dev's version (superset, 3 later fixes).
                  tsc clean; node --test scripts/*.test.mjs 292/295, the same 3 fail on clean origin/dev.
Reacted by coderabbitai

Sub-issues

Collapse Sub-issuesSub-issues

43 of 4443 of 44 Issues completed
Loading 44 sub-issues

Activity

Next
  1. Storypapst
    added this to ORISO Roadmapon Jul 31, 2026
  2. coderabbitai commented on Jul 31, 2026

    @coderabbitai
    coderabbitaiBot
    on Jul 31, 2026 – with coderabbitai
    More actions
    🔗 Related PRs

    #351 - chore: integrate Storybook 10 and M3 chat surface work [merged]
    #528 - feat(chat): message redesign per Figma — reactions in action menu, delivery checkmarks, no overflow [merged]
    #573 - fix: mobile & desktop chat UI improvements [merged]
    #579 - feat(notifications): two-slot sound model + decoupled playback + sound dialog (#576) [merged]
    #602 - fix: align focus rings for interactive chat components [merged]


    📝 Issue Planner

    Check the box below or use the @coderabbitai plan command to generate an implementation plan and prompts that you can use with your favorite coding assistant.

    • Create Plan

    🧪 Issue enrichment is currently in open beta.

    You can configure auto-planning by selecting labels in the issue_enrichment configuration.

    To disable automatic issue enrichment, add the following to your .coderabbit.yaml:

    issue_enrichment:
      auto_enrich:
        enabled: false

    💬 Have feedback or questions? Drop into our discord!

  3. Storypapst
    moved this to Backlog in ORISO Roadmapon Jul 31, 2026
  4. Storypapst
    added sub-issues on Aug 2, 2026
    • E-mail kit: emit per-engine template dialects so Java and Keycloak can consume it #859
    • ADR: notification matrix — which occasion goes to which channel, and who may switch it off #860
    • ADR: how the e-mail design system reaches MailService #861
    • ADR: tenant branding contract for e-mails — one mechanism instead of three #862
    • Storybook: counsellor enquiry mails — new enquiry, direct enquiry, daily digest #863
    • Storybook: case-handover and feedback mails #864
    • Storybook: automated free-text mail #865
    • Storybook: account and access mails — magic link, OTP, password reset #866
    • Storybook: invite mails — tenant invite, counsellor invite, DPA forward #867
    • Storybook: team and system mails — supervisor changes, counsellor renamed, SMTP test #868
    • MagicLinkLoginService: replace the hand-written HTML with the e-mail design system ORISO-UserService#944
    • SupervisorAddedEmailNotificationService: replace the hand-written HTML with the e-mail design system ORISO-UserService#945
  5. 46 remaining items

  6. Storypapst
    added sub-issues on Sep 24, 2026
    • Mail senders write full e-mail addresses into the log ORISO-UserService#1257
    • Keycloak's mail server (one-time codes) is configured by hand per environment ORISO-Helm#378
    • Advice-seekers are promised an e-mail on every reply, but only the acceptance mail is ever sent ORISO-UserService#989
  7. Storypapst commented on Sep 30, 2026

    @Storypapst
    Storypapst
    on Sep 30, 2026
    CollaboratorAuthor
    More actions

    Historical status table preserved — before the 30 September conflict integration

    The description now uses the complete 57-ticket management map. The older table is preserved below as dated history. Its old source heads, pending checks and runtime shorthand are superseded by the current description and owner PRs; this is not current acceptance evidence.

    For developers — original historical table, retained verbatim:

    | Work | Owner | State |
    | --- | --- | --- |
    | [Explicit Träger server choice](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/1562), [Admin #1076](https://github.com/OpenResilienceInitiative/ORISO-Admin/pull/1076), [TenantService #278](https://github.com/OpenResilienceInitiative/ORISO-TenantService/pull/278), [ADR](https://github.com/OpenResilienceInitiative/ORISO-Docs/pull/136) | Admin / TenantService / Docs reviewers | ⏳ Admin #1076 at `d03584c4` and TenantService #278 at `7cbb527` both target `dev` with current-head CI green. #278 includes the null-default review fix; human review, Admin visual proof, read-only legacy audit, two-mode Dev receipts and merge remain open |
    | [Träger SMTP validation and test mail #1061](https://github.com/OpenResilienceInitiative/ORISO-Admin/issues/1061) / [draft Admin PR #1094](https://github.com/OpenResilienceInitiative/ORISO-Admin/pull/1094) | Admin / TenantService / UserService reviewers | ⏳ Admin #1094 targets `dev` and stacks on #1076: the form warns for unusual port/TLS pairs and requires an explicit save confirmation. 17 focused tests, TypeScript, lint, formatting and production build passed locally; current CI and human review are open. [TenantService draft #290](https://github.com/OpenResilienceInitiative/ORISO-TenantService/pull/290) now validates the one-use acknowledgement; [draft #291](https://github.com/OpenResilienceInitiative/ORISO-TenantService/pull/291) and [Admin draft #1095](https://github.com/OpenResilienceInitiative/ORISO-Admin/pull/1095) add a verified-account test mail through saved OWN credentials. TenantService #291 merged current `dev` again at `d977441`, retaining both SMTP test-mail and new technical-identity beans in its test configuration; 100 targeted Java 21 SMTP/controller/identity tests and Spotless passed locally. At prior head `edc5c14`, the changelog conflict was resolved by placing the SMTP cooldown after new dev migrations; 82 targeted tests and 16 real-MariaDB schema-drift tests passed. Admin UI tests passed at its prior head. all seven #291 CI checks passed at prior head `edc5c14`; the new head is MERGEABLE with all seven named CI checks green; human review, merge and Dev receipt remain open. Admin #1095 at `dcb42ff5` now keeps a test-endpoint `403` in the form and shows the verified-account explanation instead of redirecting the page; the API contract test was red before the fix and 38 targeted API/client/form tests plus TypeScript/ESLint/formatting pass locally. #1095 new-head CI and review remain open; ordinary tenant mail routing remains in UserService #1006 |
    | [Tenant mail delivery](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1006) / [draft PR #1283](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1283) and [secret-owner endpoint](https://github.com/OpenResilienceInitiative/ORISO-TenantService/issues/240) | UserService / TenantService reviewers | ⏳ Explicit PLATFORM/OWN routing and removal of the password-reading path are proposed in PR #1283 (`7ca921e1c`; updated #1273 and current dev integrated after one test conflict; 5,073 local tests, 56 focused tests, Spotless and diff check green). All 11 current-head CI checks green; review, prerequisite merges, operator identity pins and two-mode Dev receipts remain open. Current Dev still skips affected mails |
    | [Admin-managed platform SMTP settings](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1253), [invitation slice #1272](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1272) / [PR #1273](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1273), [auth slice #1274](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1274) / [PR #1279](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1279), [SMTP test #1280](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1280) / [PR #1258](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1258), [Helm PR #380](https://github.com/OpenResilienceInitiative/ORISO-Helm/pull/380), [Keycloak SMTP #378](https://github.com/OpenResilienceInitiative/ORISO-Helm/issues/378) / [PR #381](https://github.com/OpenResilienceInitiative/ORISO-Helm/pull/381), [technical pins PR #382](https://github.com/OpenResilienceInitiative/ORISO-Helm/pull/382) | UserService / Helm reviewers | ⏳ Shared restoration is merged: [UserService #1310](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1310) / [CTS #164](https://github.com/OpenResilienceInitiative/ORISO-ConsultingTypeService/pull/164), with Dev reset and DPA-forward receipts. Invites/DPA-signed, first-admin setup and Keycloak rotation remain open. Keep Admin Settings as the only persistent platform source; old deployment-source proposals require rework or linked replacement. **Historical evidence from before the #1310/#164 restoration — the following image/config/PR states are not current runtime or acceptance proof:** Invitation/DPA deployment SMTP [PR #1273](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1273) merged to `dev` on 2026-09-28 at `60406b275`; its head `cab96527c` had 11 green checks. True Dev currently runs the same UserService digest recorded after #1273 and is 1/1 ready; platform SMTP values were restored in Helm revision 30, and a password-reset mail was received on 2026-09-28 at 14:25 UTC. Invitation/DPA and Keycloak OTP receipts remain unverified. Helm render-time checks and `SMTP_REQUIRED=true` container wiring in PR #380 at `3479a3b` (rejects invalid port/TLS values with named errors, ambiguous numeric IPv4 aliases and loopback public mail hosts; Dev/Pre-Dev SMTP render tests, focused public URL checks at prior head, lint and package pass locally; CodeRabbit status success but CHANGES_REQUESTED review and human re-review pending) (current `dev` merged; missing SMTP user/password named separately; 19 focused tests, lint/package green; full pytest at prior head 114 pass/3 failures reproduced on clean `dev`; two old CodeRabbit threads resolved with current-head evidence and CodeRabbit approved on 2026-09-26; Hassan/Shazia human review remains requested). Keycloak SMTP reconciliation in stacked PR #381 at `c7dde99` (current dev and exact #380 head `3479a3b` integrated; one obsolete mutable-image test conflict resolved to dev; passwords remain out of kcadm process arguments, SMTP JSON uses stdin; 57 local Python unit tests, focused SMTP/Keycloak and group-appointment render tests, fixture Helm lint/package green; one current-head GitHub workflow check green; human review, merge and Dev OTP receipt pending). TenantService identity pin wiring in stacked Helm PR #382 at `0da108d` (current `dev` and #381 integrated; two current render-test review findings fixed; focused pin test, 57 Python tests and diff check green locally; prior-head Helm lint/package green, current-head Helm CI green and human re-review pending; actual environment values pending). Reset and sign-in source now proposed in PR #1279 at `fa1da9166` (updated #1273 and current dev integrated, one test conflict resolved; 5,055 local Java 21 tests, 51 focused tests, Spotless and diff check green; 11 current-head CI checks green, CodeRabbit approved, Shazia/Shirloin review open, depends on [PR #1273](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1273)). Test mail aligned in PR #1258 at `ce554224e` (updated provider #1273 and current dev integrated; two test conflicts resolved; 5,073 local Java 21 tests, 28 focused tests, Spotless and diff check green; 11 current-head CI checks green, review open). [Safe summary #1284](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1284) / [PR #1287](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1287) at `5e25817fa` includes updated #1258 and current dev conflict-free; 5,076 local tests, Spotless and diff check green; 11 current-head CI checks green, review open. [Admin read-only #1084](https://github.com/OpenResilienceInitiative/ORISO-Admin/issues/1084) / [PR #1085](https://github.com/OpenResilienceInitiative/ORISO-Admin/pull/1085) now targets `dev` at `49f0c1dd`; 2,443 local tests, build and lint plus all current CI checks green; human review open, no Dev receipt. Human review, merge and Dev receipts remain open |
    | [Shared encrypted SMTP](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1254), [PR #1267](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1267) | UserService / reviewers | ⏳ Merged to dev after Shazia's review; Dev deployment and TLS receipt unverified |
    | [Mail-log privacy](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1257), [PR #1266](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1266) | UserService / reviewers | ⏳ Head `ca8ba5ad4` verifies all captured magic-link/supervisor SMTP events omit account, recipient and reply fragments, with exact WARN/ERROR failure levels and no throwable proxy; 79 focused Java 21 tests, Spotless/package and diff check green. Earlier full suite 5,081 green; all 11 current-head CI checks green; re-review pending. Merge and deployed Dev log proof open |
    | [Mail-link configuration](https://github.com/OpenResilienceInitiative/ORISO-Helm/issues/349), [UserService PR #1294](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1294) | UserService / Helm / operators | ⏳ Residual supervisor and tenant URL fallback repaired in PR #1294 against `dev`; current head `dcac4527c` also rejects RFC1918 private IPv4 and IPv4 link-local mail origins in deployed profiles. The link-local regression was red before the fix and green afterward. All 22 URL tests and the full 5,111-test Java 21 package passed locally (zero failures/errors/skips), plus Spotless and diff check. All six CI jobs passed on rerun at current head `dcac4527c` after a transient Maven download failure; renewed human review is pending. Human re-review is pending; CodeRabbit changes-requested verdict awaits a new decision despite resolved threads; human review, merge and Dev receipt remain open; Helm PR #348 remains open but its current diff is only redundant explicit Dev invite origins (+7 lines), since #369 merged domain validation and derivation; TenantService [#288](https://github.com/OpenResilienceInitiative/ORISO-TenantService/issues/288) / [PR #289](https://github.com/OpenResilienceInitiative/ORISO-TenantService/pull/289) proposes strict HTTPS DPA link origin validation against `dev` at `8fd16c8c` (702 Java 21 tests, Spotless and all seven current-head CI checks green; old changes-requested review awaits re-review). Helm `enableTls=false` derives HTTP, so that mode needs an explicit operator decision before this service image is deployed. ConsultingTypeService #154 (required origin) and #155 (actual HV000030 preview/send routing fix) merged to `dev`; the Stage URL-cause hypothesis was disproved. Stage deployed image, preview/send retry and received-mail proof are not verified. ConsultingTypeService [v2.0.8](https://github.com/OpenResilienceInitiative/ORISO-ConsultingTypeService/releases/tag/v2.0.8) contains both #154/#155 merge commits (ancestry verified 2026-09-26); open Helm [release PR #377](https://github.com/OpenResilienceInitiative/ORISO-Helm/pull/377) pins this CTS tag and awaits Stage validation before merge to `main`. Its Validation section now carries the [Stage #364](https://github.com/OpenResilienceInitiative/ORISO-Helm/issues/364) operator checklist for the actual CTS image digest/source commits, effective URL, preview response/correlation ID and one received signing mail; every runtime item remains unchecked. Helm release [run 36217780057](https://github.com/OpenResilienceInitiative/ORISO-Helm/actions/runs/36217780057) for v2.0.9 failed before publishing because main Chart.yaml still says 2.0.8. Neither source/release fact establishes the actual Stage image, effective config, preview/send retry or mailbox receipt |
    | [Tenant branding #1252](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/1252) / [PR #1306](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1306) | UserService reviewers | ⏳ One resolver now supplies tenant name, first-party logo and primary colour to sign-in, reset, welcome, supervisor, invite and DPA mail on the source branch at `ef174c24d`. Eight two-tenant screenshots are attached in #1306; 5,120 Java 21 package tests passed at `be1e80fa8` after #1294 trailing-dot and numeric-URL-alias hardening; 101 Python CI contracts passed at the earlier source head. The branch includes strict-URL PR #1294 through `2596fe56d` at head `67d0c1a5c`, so merge #1294 first, refresh #1306 against `dev`, then review and merge. At #1306 merge head `a0d43371f`, 77 focused URL/branding/renderer tests, Spotless and diff check passed locally. At prior head `ef174c24d`, cache/async-mail review fixes pass 80 focused tests, Spotless and diff check; full Java 21 suite passed 5,125 tests across 536 reports with zero failures/errors/skips; the 5,120-test package belongs to earlier head `be1e80fa8` and 11 green CI checks belong to prior head `24a6d1ad8`. All 11 named #1306 CI checks passed at prior head `ef174c24d`; 134 focused auth/branding/SMTP/URL tests passed after current-dev integration at `d1f2c1c4b`; full unit CI then found three stale example-host assertions among 5,126 tests. At prior head `4c0222aca`, current dev (including merged SMTP provider #1273) was integrated; 57 focused and 5,112 full-suite Java 21 tests passed. Prior head `261427425` fixed the confirmed MagicLink token-order finding; its 5,113-test package and all 12 CI checks passed. Current head `7d6c4047a` integrates strict-URL #1294 `dcac4527c` without conflict. The IPv4 link-local regression was red before the fix and green afterward; 22 URL tests, 40 MagicLink tests and the full 5,115-test Java 21 package passed locally with zero failures/errors/skips, plus Spotless and diff check. All 11 named checks passed at prior head `7d6c4047a`. At new head `13496f81c`, 40 MagicLink tests, Spotless and diff check passed locally after an added tenant-URL/ID assertion; all 11 current-head GitHub workflow checks passed, including required PreDev CI; human re-review remains pending and CodeRabbit still shows CHANGES_REQUESTED from the prior review. A conditional mixed-origin case exists only in the legacy multi-domain code path; accepted ADR-011 and the Helm default use one public domain. Shazia-k and Shirloin were requested, while CodeRabbit review is rate limited. No Dev mail receipt is proven |
    | [Notification design and settings #869](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/869), [UserService #1320](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1320), [Frontend #1594](https://github.com/OpenResilienceInitiative/ORISO-Frontend/pull/1594), [TenantService #287](https://github.com/OpenResilienceInitiative/ORISO-TenantService/pull/287), [Helm #391](https://github.com/OpenResilienceInitiative/ORISO-Helm/pull/391) | UserService / Frontend / TenantService / Helm reviewers; Frank for recipient policy | 💤 All ten occasions have proposed sender code and matching subject, HTML and text designs in all seven variants. The four integrated PRs are open against dev, mergeable and CI green. The voice-feedback, unsaved-settings and informal-translation findings are corrected. Approximately 9/10 development applies to #869 alone. The feedback rule for signed-in recipients is still undecided; the proposal currently does not suppress by ORISO login. Human review/re-review, named merge approval, deployment and every new notification receipt remain open. The earlier #1319/#1593 baseline is included, so it does not need a duplicate merge. Shared SMTP reset receipt is separate from these ten occasions. |
    | [Preference matrix #871](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/871) / [Frontend PR #1571](https://github.com/OpenResilienceInitiative/ORISO-Frontend/pull/1571), [footer links #872](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/872) / [Frontend PR #1572](https://github.com/OpenResilienceInitiative/ORISO-Frontend/pull/1572) / [UserService PR #1298](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1298), [older settings PR #1415](https://github.com/OpenResilienceInitiative/ORISO-Frontend/pull/1415) | Frontend / UserService / Keycloak reviewers | ⏳ #1571 targets `dev` with green CI and approved review, unmerged. #1572 preserves an exact occasion-specific footer destination through login (5,782 local tests/lint/build green; CI/review open). #1298 corrects UserService footer paths (5,114 local tests/Spotless and all 12 current-head CI checks green; review approved, mergeable, still unmerged). Keycloak source/consumer links fixed in Frontend #1568 and Keycloak #43. #1415 still conflicts. Source cross-check found five catalogue unsubscribe occasions without a matching role switch (`willkommen`, `beraterin-kontakt`, `mitteilung`, `team-aenderung`, `smtp-test`); #871 records the product choice between a real switch/suppression and removing that footer promise. No deployed Dev link, preference persistence or actual mail suppression proven |
    | [All App languages](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/1065) / [Frontend #1568](https://github.com/OpenResilienceInitiative/ORISO-Frontend/pull/1568), [UserService #1291](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1291), [Keycloak #43](https://github.com/OpenResilienceInitiative/ORISO-Keycloak/pull/43), [Helm #384](https://github.com/OpenResilienceInitiative/ORISO-Helm/pull/384), [template guard #1304](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1304) | Frontend / UserService / Keycloak / Helm reviewers | ⏳ Seven variants are generated. Frontend #1568 at `4db15c94` fixes the seven password-reset footers in source and all generated dialects; all seven semantic tests were red before the fix. Local Node 22 full suite 8,249 tests, 627 focused mail tests, lint/style/build and sync check are green; seven current-head workflow checks are green (one skipped); CHANGES_REQUESTED re-review and propagation into Frontend #1574/#1578 remain open; UserService #1291 has synced the seven reset-mail pairs at `8592045d9`. Earlier translation-review fixes were propagated to #1574/#1576/#1577. UserService #1291 is conflict-free at `8592045d9`; the earlier `af9a239b7` head had 5,106 local Java 21 unit tests and 102 CI contracts, while `49beabc90` had all 11 GitHub checks green and a counselor-specific team-change assertion. The current head syncs seven reset HTML/text pairs from #1568 while preserving newer DPA artifacts; 84 focused Java 21 tests, source preflight, Spotless and diff check pass locally. All 11 current-head workflow checks are green; CHANGES_REQUESTED human re-review remains open. Keycloak #43 had green CI at its previously checked head. Guard #1304 now pins 322 templates, four fragments and catalogue to Frontend #1568 `4db15c94` at head `2ac99a65b`; its test requires that exact source commit. Three focused tests, manifest verification and Spotless passed locally. Prior head `880e3e2cd` merged current `dev`, resolved one English DPA HTML placeholder conflict to the pinned artifact, passed the full 5,109-test Java 21 unit suite. All 11 CI checks are green at current head `2ac99a65b`; CodeRabbit approved, human review remains open. Dependent UserService #1301 pins #1574 contact artifacts at `5649d80f`. Four machine translations await human language review and a production release decision. Merge, deployed Dev receipts and Stage proof remain open |
    | [Reply mail #989](https://github.com/OpenResilienceInitiative/ORISO-UserService/issues/989) / [draft #1299](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1299), [TenantService header #287](https://github.com/OpenResilienceInitiative/ORISO-TenantService/pull/287), [appointment #874](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/874), [contact #875](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/875), [system notice #876](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/876), [channel contract #947](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/947) | UserService / TenantService / Frontend / product | ⏳ Reply #1299 at `30810acd2` now includes updated UserService #1297 and current `dev` without conflict; 5,145 Java tests, 102 Python CI contracts, Spotless and diff check passed locally; all 11 named current-head CI checks green, MERGEABLE and REVIEW_REQUIRED, with shazia-k/Shirloin requested; human review plus Dev receipts remain open. TenantService header #287 has source/CI progress but no Dev receipt. Contact sender #1301 at `6081707ce` includes the #1297 foundation, current `dev` and templates pinned to #1574 `5649d80f`; its integrity test now requires that exact source commit. Three focused tests, manifest verification and Spotless passed locally. At prior head `59c3cd530`, 14 reset HTML/text pairs were byte-identical to source and 69 focused tests passed. All 11 CI checks are green at current head `6081707ce`; human review remains open. Frontend #1574 at `5649d80f` includes the corrected seven-language reset footer; 632 focused tests, sync, lint and production build passed locally; all seven CI checks are green at current head `5649d80f`, and it keeps all seven App language variants generated; four translations remain marked for human review before production. Its automated suggestion to filter those variants was not applied because the approved scope explicitly builds them. #1576 at `8e682650` carries #1574 `5649d80f` and the corrected seven-language reset footer; 614 focused tests, lint/TypeScript, email sync and production build pass locally; 8,254 unit tests belong to prior head `06045da8`; seven named CI checks are green at current head `8e682650`, with re-review pending. Appointment #874 uses existing self-help group Series for participants and counselors. TenantService [#292](https://github.com/OpenResilienceInitiative/ORISO-TenantService/pull/292) provides four OWN relay purposes, Frontend [#1578](https://github.com/OpenResilienceInitiative/ORISO-Frontend/pull/1578) at `31d679e6` provides seven-variant templates and includes the corrected reset footer from #1574; 808 focused tests, sync, lint and build passed locally; seven named CI checks are green at current head `31d679e6`, with re-review pending. UserService draft [#1305](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1305) at `c936e1e8c` now records create/join/change/cancel in a revisioned per-recipient outbox, renders all role/event templates and can dispatch due 24-hour reminders after a current-recipient/revision check. It persists a transport correlation ID, backs off failing unsent configuration rows to protect other tenants, and has an operator runbook; its scheduler defaults off until dependencies deploy. Helm draft [#386](https://github.com/OpenResilienceInitiative/ORISO-Helm/pull/386) now wires that off-by-default switch; render test and lint pass locally. Java 21 full suite and 102 CI contracts passed locally at b227cf7bf; the focused Java/Python inventory tests pass at c936e1e8c. Both discovered CI inventory entries are fixed; all 11 current-head #1305 CI checks are green, human review pending. Frontend [#1579](https://github.com/OpenResilienceInitiative/ORISO-Frontend/pull/1579) at `2cc5a515` adds a read-only role-specific login return without `gcid` assignment, invalidates stale existing-session lookups and reports current lookup failures. Local Node 22 unit suite passed 9,520 tests; script/style lint and production build passed. Seven current-head checks are green and one is skipped; review is APPROVED. Merge and Dev browser/mail receipts remain open. Group-owner sender/URL and next-only recurring confirmation are provisional product rules; human review, dependency merges, controlled Dev activation and real receipts remain open. Frontend #1568/#1574/#1578 and UserService #1305 were mergeable after the DPA-copy conflict fix; #1305 current-head CI is green; #1579 new-head CI is running and human review remains open. No #874 PR has merged. The general booking producer is explicitly deferred, with its future adapter contract retained. System notice #876 has copy and switches but no operator campaign or sender. Source review found that the existing event feed is recipient-specific and the SMTP test endpoint permits tenant/technical roles; a dedicated USER_ADMIN operation route, server-side audience dry run, idempotent in-app events, bounded durable email outbox and required validated status URL are still needed. Audience and feed-switch rules await product answers; the generic appointment producer remains deferred. Frontend #1577 at `4227b630` maps occasion roles and known browser descriptors, including the consultant system-notice switch; latest #1568/current `dev` are merged without conflict, 8,246 local unit tests/lint/email sync/build green; all seven named current-head checks are green. The browser regression initially failed when its contenteditable test typed `Tam` for `Team`; the exact spec passed locally and the targeted GitHub rerun passed on attempt 2. Human re-review remains open. Sender enforcement, merges and deployed Dev receipts remain open |
    | [Admin-created account mail #1058](https://github.com/OpenResilienceInitiative/ORISO-Frontend/issues/1058), [existing-unit invite package #1026](https://github.com/OpenResilienceInitiative/ORISO-Admin/issues/1026), [draft password PR #1303](https://github.com/OpenResilienceInitiative/ORISO-UserService/pull/1303) | Admin / UserService / product | 🔴 #1026 PRs already provide recipient-chosen-password invites for counsellors, additional Träger admins and agency admins, all against `dev`, but the Admin Users/direct-create actions still send no invitation. #1303 remains draft because the current direct-token login conflicts with temporary Keycloak credentials. Decide whether those actions route into the invite composer; then verify all roles and first login on Dev |
    | [Mailbox verification](https://github.com/OpenResilienceInitiative/ORISO-E2E/issues/52), [PR #74](https://github.com/OpenResilienceInitiative/ORISO-E2E/pull/74) | E2E / reviewers | ⏳ One earlier onboarding receipt run. Draft E2E #74 at `6bd763e` locally rejects supplied private markers in received seeker mail, with centre-name exceptions for appointment/contact and 320px/375px capture widths; 51 Node 22 unit tests and typecheck passed. Its read-only receipt mode now selects allowlisted Dev actors/origin and isolates Dev evidence. No full occasion matrix, new deployed Dev receipt or actual narrow screenshot is proven. E2E's repo integration branch is `pre-dev` because it has no `dev` branch |
    
  8. Storypapst
    added a sub-issue on Sep 30, 2026
    • Synchronize Keycloak SMTP when Admin Settings are saved ORISO-ConsultingTypeService#165
  9. Storypapst
    added a commit that references this issue on Sep 30, 2026

    Merge privacy hardening into the shared notification sender

    d5538ae
  10. Storypapst
    set
    Platform release
    to
    v2.0.10
    on Sep 30, 2026
  11. Storypapst commented on Oct 1, 2026

    @Storypapst
    Storypapst
    on Oct 1, 2026
    CollaboratorAuthor
    More actions

    Current Roadmap Readiness: 8/20 (native value retained). Fifty-seven of 62 open descendants have numeric Readiness values; five are missing. The lowest known open-child value is 8/20, so the complete minimum is UNKNOWN and can be no higher than 8/20. The native parent value remains 8/20. This audit changes no fields and does not infer missing scores. Readiness is not a QA percentage and does not prove deployment, runtime, or received-mail acceptance.

    Next step: Record the five missing child scores from current evidence, then recompute the minimum using the existing rule.

    For developers — score inputs and calculation:

    Snapshot: 2026-10-20T19:58:16Z
    Open descendants: 62
    Numeric Readiness values: 57
    Missing Readiness values: 5
    Lowest known value: 8/20
    Canonical minimum: UNKNOWN; upper bound <=8/20
    Native parent Readiness: 8/20 (preserved)
    
  12. Storypapst
    updated Platform release v2.0.10 on Oct 1, 2026
  13. Storypapst
    added sub-issues on Oct 7, 2026
    • Deliver new-enquiry emails through a configured tenant route ORISO-UserService#1373
    • Deliver reply emails and terminate intentionally suppressed deliveries ORISO-UserService#1374
    • Notify eligible counsellors by email for ordinary internal-chat messages ORISO-UserService#1375
  14. Storypapst
    updated Platform release v2.0.10v2.0.12 on Oct 9, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @Shirloin
    Shirloin
  • @shazia-k
    shazia-k

Labels

No labels
No labels

Type

Epic

Fields

Priority

High

Platform release

v2.0.12v2.0.10

Projects

  • ORISO Roadmap
    Status
    In progress
    Show more project fields

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions

You are visitor 01402775 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.