GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — GitHub - bcgov/nr-arch: Natural Resource Ministries Architecture Repo

BranchesTags
Open more actions menu

Latest commit

 

History

259 Commits
259 Commits

Folders and files

NameName
Last commit message
Last commit date
.diagrams
.diagrams
 
 
.github
.github
 
 
nr-arch
nr-arch
 
 
.gitignore
.gitignore
 
 
README.md
README.md
 
 

Repository files navigation

Natural Resource Ministries Architecture Team

This repo is used to store artifacts which can be shared across multiple platforms from a single source of truth and publicly viewable.

Project Automation

This repository includes GitHub Actions automation for the NR Architecture Project Board that automatically manages project timelines:

Features

  • Automatic Start Date Tracking: When an issue status is changed to "In Progress", the system automatically adds the current date to the Start Date field
  • Automatic Completion Date Tracking: When an issue status is changed to "Done" or when a PR that closes an issue is merged, the system automatically adds the current date to the Completed Date field
  • Confluence Diagrams: all files inside .diagrams folder are referred in multiple places in NRM confluence.

Required Project Fields

For the automation to work properly, your GitHub project board must have these custom fields:

  1. Status (Single select field)

    • Must include options with "progress" or "in progress" in the name for start date tracking
    • Must include options with "done", "completed", or "closed" in the name for completion date tracking
  2. Start Date (Date field)

    • Field name should contain "start"
    • This will be automatically populated when status changes to "In Progress"
  3. Completed Date (Date field)

    • Field name should contain "completed", "done", or "finish"
    • This will be automatically populated when status changes to "Done" or when a linked PR is merged

How It Works

The automation runs:

  • When issues are opened, edited, or closed
  • When pull requests are opened or closed
  • Every 5 minutes via scheduled check (to catch manual project board updates)
  • Can be manually triggered via workflow dispatch

PR-Issue Linking

The automation recognizes these keywords in PR titles and descriptions to automatically mark linked issues as complete:

  • closes #123, close #123, closed #123
  • fixes #123, fix #123, fixed #123
  • resolves #123, resolve #123, resolved #123

When a PR with these keywords is merged, the linked issues will automatically:

  1. Have their status changed to "Done"
  2. Have their completion date set to the merge date

Manual Trigger

You can manually run the automation by going to the Actions tab and triggering the "Project Board Automation" workflow.

⚠️ IMPORTANT: The content in this repository is pulled by NRM Confluence.

About

Natural Resource Ministries Architecture Repo

Topics

architecturenatural-resource-ministriesnridsnrmnrs

Resources

Readme
Activity
Custom properties

Stars

12 stars

Watchers

13 watching

Forks

2 forks
Report repository

Releases

Packages

Used by

Contributors

You are visitor 01402775 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.