GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — Decide rollout and retire the Go worker scheduling release flag · Issue #867 · devantler-tech/.github

Decide rollout and retire the Go worker scheduling release flag #867

New issue
Copy link
New issue
Copy link
Open
Chore
Open
Decide rollout and retire the Go worker scheduling release flag#867
Chore
Copy link

Description

@devantler
devantler
opened on Nov 3, 2026
Issue body actions

🤖 Generated by the Agentic Engineer

Outcome

After #866 publishes the default-off capability and #865 qualifies Platform's complete instrumented suite in native required CI, decide whether bounded worker scheduling should become the supported default. Keep the current default until that evidence exists.

Acceptance

  • Record comparable complete test inventories, coverage, reliability and feedback time on representative consumers, including Platform.
  • Roll out caller by caller only where the measured setting is appropriate; do not assume one worker count fits every suite.
  • After a supported default is proven, remove the temporary enable-test-parallelism release flag with backward-compatible migration and both-state controls. If evidence rejects general adoption, remove the trial instead and document the decision.
  • Preserve the bounded worker setting as a supported per-consumer configuration only if justified by the rollout decision; do not retain an unused release flag indefinitely.

Part of #865. Backlog work; blocked by shared delivery and consumer qualification.

Activity

  1. devantler
    added a parent issue on Nov 3, 2026
    • Bound Go test parallelism in required instrumented runs #865
  2. github-project-automation
    added this to 🌊 Project Boardon Nov 3, 2026
  3. devantler
    added the
    Chore
    issue type on Nov 3, 2026
  4. devantler
    moved this to 📥 Backlog in 🌊 Project Boardon Nov 3, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    Chore

    Fields

    Priority

    None yet

    Projects

    • 🌊 Project Board
      Status
      📥 Backlog
      Show more project fields

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.