GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — Inventory every normal path through admission and hooks · Issue #10177 · developing-today/code

Inventory every normal path through admission and hooks #10177

New issue
Copy link
New issue
Copy link
Closed
Closed
Inventory every normal path through admission and hooks#10177
Copy link
Labels
status:done

Description

@dezren39
dezren39
opened on Nov 14, 2026
Issue body actions

Problem and goal

Produce a complete path-to-gate inventory and test oracle before claiming hook/admission extensibility coverage.

Version and design basis

Version: V2. Settled design: https://github.com/developing-today/code/blob/main/doc/2026-11-13T03-40-00Z_design_id-atlas-summit/crosscut/versioned-design.md#operation-pipeline-mandatory-ordering (section: Operation pipeline (mandatory ordering)).
Tier: crucial.
Statement IDs: S0.12, S0.17, S1.114, S1.118
Enables: Track every ingress/read/write/sync/query/stream/bucket path, gate/hooks, bypass test and recovery semantics; leave explicit unmigrated entries and block completeness claim until covered.

Scope and ownership

Parent: #9110 (native component/meta parent).

  • pkgs/id/docs/operation-path-inventory.md (new; owner: 9110-13)
  • pkgs/id/tests/admission_path_coverage.rs (new; owner: 9110-13)
    Hard dependencies (native blockers): 9110-02 — Required output from slice 9110-02.
    Soft sequencing (not blockers): none

Test / evidence first

Create or validate pkgs/id/tests/admission_path_coverage.rs first. Proposed command: cargo test --manifest-path pkgs/id/Cargo.toml --test admission_path_coverage
Oracle: invariant — expected Every normal retained-data path in the inventory maps to a fixed gate and a bypass test; any unmapped path blocks completion.; verifier: A path-to-test coverage matrix independently reviewed against source/call-site inventory..

Done and rollback

Done when the declared oracle passes and test/evidence output plus changed-file summary is attached. Research evidence: doc/2026-11-13T03-40-00Z_design_id-atlas-summit/baseline/v1-audit.md; doc/2026-11-13T03-40-00Z_design_id-atlas-summit/main.md.
Rollback: Mark incomplete paths unsupported/blocked; never roll back by opening a bypass around the fixed gate.

Manifest SHA-256 approval binding: 3b5bce3523945bf5adaa28739f0b90b7b70ff1d6522b4ac827246654e8ff6b06.

Activity

Next
  1. developing-today commented on Nov 14, 2026

    @developing-today
    developing-todayBot
    on Nov 14, 2026 – with developing.today
    Contributor
    More actions

    CODE-3601

  2. dezren39
    marked this as blocked on Nov 14, 2026
    • Define versioned capability-oriented port contracts #10160
  3. dezren39
    added a parent issue on Nov 14, 2026
    • design(id): extensibility architecture — primitive/adapter/hook boundary spec + backend conformance #9110
  4. dezren39
    marked this as blocking on Nov 14, 2026
    • Implement ordered lifecycle hooks and fixed acceptance gate #10192
  5. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 17026 dependency-blocked on issue #10160 (lane any-c)

    • state: blocked (structural dependency, broker-watched)
    • task: 17026
    • issue: Inventory every normal path through admission and hooks #10177
    • kind: triage (implementation slice 9110-13)
    • Gate (fresh verification, 2026-11-14): the issue declares a hard dependency — "Hard dependencies (native blockers): 9110-02 — Required output from slice 9110-02." Slice 9110-02 is issue Define versioned capability-oriented port contracts #10160 (Define versioned capability-oriented port contracts; its id-atlas-delivery: #9106:9110-02 marker confirms the mapping), still OPEN — and itself gated on slice 9110-01. The port contracts are the required input this inventory maps paths against: without them there is no fixed gate definition for the path-to-gate inventory or its coverage test to bind to (the issue's oracle: every normal retained-data path maps to a fixed gate and a bypass test).
    • Action: task 17026 blocks with --blocked-by-issue developing-today/code#10160; the broker returns it to the pool automatically when Define versioned capability-oriented port contracts #10160 closes. No files were started (this slice owns pkgs/id/docs/operation-path-inventory.md and pkgs/id/tests/admission_path_coverage.rs, both downstream of the contracts). Note the chain continues downstream: slice 9110-06 (issue Implement ordered lifecycle hooks and fixed acceptance gate #10192) in turn requires this slice's output, so landing Define versioned capability-oriented port contracts #10160 unblocks a chain, not just this task.
  6. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    and removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    on Nov 14, 2026
  7. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 17026 preflight PASSED for issue #10177 (lane code-c)

    • state: triaged (preflight complete; implementation follow-on enqueued)
    • task: 17026
    • issue: Inventory every normal path through admission and hooks #10177
    • kind: triage (implementation slice 9110-13)
    • Gate (fresh verification, 2026-11-14): the issue's sole hard native blocker — slice 9110-02, issue Define versioned capability-oriented port contracts #10160 (versioned capability-oriented port contracts) — is now CLOSED (labels include status:done). The issue declares no other hard dependencies and no soft sequencing. The earlier dependency block on task 17026 is therefore obsolete.
    • Action: implementation proceeds as follow-on task 17151 (small_fix, dedupe repo-health:v1:fix:developing-today/code:issue:10177): produce pkgs/id/docs/operation-path-inventory.md and pkgs/id/tests/admission_path_coverage.rs per the issue oracle; test command cargo test --manifest-path pkgs/id/Cargo.toml --test admission_path_coverage. No production rollout is authorized.
    • This preflight did no implementation, per the packet mandate.
  8. dezren39
    added
    queue/queuedHas a queued queue task
    and removed
    status/blockedQueue or user escalation state
    on Nov 14, 2026
  9. 3 remaining items

  10. dezren39
    added
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 14, 2026
  11. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 17151 picked up (lane code-c)

    • state: picked up
    • task: 17151
    • issue: Inventory every normal path through admission and hooks #10177
    • kind: small_fix (ID/Atlas slice 9110-13 implementation; follow-on from preflight task 17026)
    • Plan: inventory every normal retained-data path through admission and hooks in pkgs/id against the fixed gates from slice 9110-02 (issue Define versioned capability-oriented port contracts #10160, closed), write pkgs/id/docs/operation-path-inventory.md and the coverage oracle pkgs/id/tests/admission_path_coverage.rs, verify with cargo test --manifest-path pkgs/id/Cargo.toml --test admission_path_coverage, open the PR, then complete.
  12. developing-today
    added
    status:in-review
    on Nov 14, 2026
  13. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 17151 PR opened for issue #10177 (lane code-c)

    • state: pr_opened
    • task: 17151
    • issue: Inventory every normal path through admission and hooks #10177
    • PR: id-atlas 9110-13: operation path inventory + admission coverage oracle (#10177) #10341 — id-atlas 9110-13: operation path inventory + admission coverage oracle (#10177) #10341
    • Deliverables: doc/operation-path-inventory.md (the slice's pkgs/id/docs/operation-path-inventory.md via the docs symlink) — 17-path inventory with adapter, gate, hooks, bypass test, recovery, and status per path; completeness explicitly NOT COMPLETE with unmigrated entries (federated query slices P-QY-01, object bucket P-BU-01) named. Plus pkgs/id/tests/admission_path_coverage.rs, the coverage oracle.
    • Tests: cargo test --manifest-path pkgs/id/Cargo.toml --test admission_path_coverage — 3 passed (the oracle caught and forced correction of two over-claimed gated rows during development).
    • Next: CI on PR id-atlas 9110-13: operation path inventory + admission coverage oracle (#10177) #10341; merge under standing criteria when green.
  14. dezren39
    added a commit that references this issue on Nov 14, 2026

    Merge pull request #10341 from developing-today/queue/17151-10177-pat…

    bde5457
  15. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 17151 done: slice 9110-13 delivered for issue #10177 (lane code-c)

    • state: done (fixed_merged)
    • task: 17151
    • issue: Inventory every normal path through admission and hooks #10177 — closing with this note
    • PR: id-atlas 9110-13: operation path inventory + admission coverage oracle (#10177) #10341 — id-atlas 9110-13: operation path inventory + admission coverage oracle (#10177) #10341 — MERGED, merge sha bde5457
    • Changed files: doc/operation-path-inventory.md (the slice's declared pkgs/id/docs/operation-path-inventory.md, resolving through the repo docs symlink) and pkgs/id/tests/admission_path_coverage.rs.
    • Test evidence: cargo test --manifest-path pkgs/id/Cargo.toml --test admission_path_coverage — 3 passed, 0 failed (run on the branch through the fleet build lock). The oracle also caught two over-claimed gated rows during development; both were downgraded to partial before merge.
    • Outcome per the issue oracle: every normal path in the inventory maps to its fixed gate (or an explicit unmigrated entry) and a bypass test (or an explicit MISSING marker that forbids a gated claim). The inventory states Completeness: NOT COMPLETE — federated query slices (P-QY-01) and object-bucket adapters (P-BU-01) remain unmigrated, and the completeness claim stays blocked until they are covered, exactly as the issue requires. Follow-on coverage work belongs to those paths' own slices; no production rollout was authorized or made.
  16. dezren39
    closed this as completedon Nov 14, 2026
  17. developing-today
    added
    status:done
    and removed
    status:in-review
    on Nov 14, 2026
  18. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 14, 2026
  19. dezren39
    added a commit that references this issue on Nov 15, 2026

    fix(id): move operation-path inventory inside the package source

    06f2a99
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    status:done

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.