GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id: idea — native GUI client · Issue #1072 · developing-today/code

id: idea — native GUI client #1072

New issue
Copy link
New issue
Copy link
Open
Open
id: idea — native GUI client#1072
Copy link
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepic/id-programReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudpriority/lowNice to have; do when convenientqueue/blockedQueue or user escalation statesource/humanFiled directly by a humanstatus/blockedQueue or user escalation statetask/triageQueue packet kind: verify, reproduce, and route this item

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

Idea: native GUI client

From pkgs/id/TODO.md:

A native GUI (Tauri, egui, Tauri+egui, Leptos, Dioxus, Iced, Bevy — to be chosen) that does what the TUI idea does, faster and better. Keep in mind a Bevy project may later be embedded into the native app, or the native app into Bevy.

Distinct from F13.6 (#788), which is a reference native shell on the Phase 13 shell contract; this is the full end-user GUI app idea. Long-term, low priority.

Coordination (2026-10-26 reprioritization, per Drew): every id roadmap item now has its own GitHub issue, and priority encodes the order: (1) the path to Phase 12 — now + priority/high; (2) Phase 12 itself — next; (3) Phase 13 and long-term ideas — priority/low. The dashboard mirrors this list (org Project "Developing Today" #4, Area id-train; Grist Program roadmap, Area id). If this item turns out to be blocked, wrong, or superseded, park or close it with a note rather than letting it stall the queue — dropping an issue is always allowed; silently stalling is not.

Acceptance criteria

  • A GUI stack decision is recorded on this issue (candidates: Tauri, egui, Tauri+egui, Leptos, Dioxus, Iced, Bevy) with rationale, including the Bevy-embedding consideration.
  • The scope boundary against F13.6 (id: Phase 13 F13.6 native client shells on the shell contract #788, reference native shell) is stated explicitly.
  • If the idea is adopted, a first implementation step is filed as its own issue; if dropped, the reason is recorded here.

Activity

Next
  1. dezren39
    added
    kind/featureNew feature or capability request
    status/needs-triageNot yet triaged; needs a first look
    source/humanFiled directly by a human
    priority/lowNice to have; do when convenient
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-216

  3. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  4. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Intake review

    Related: F13.6 reference native shell: #788 · sibling idea: native TUI client #1071 · source: pkgs/id/TODO.md

    Notes: Long-term, priority/low. This is the full end-user GUI app, distinct from the F13.6 reference shell — conflating the two would double-build the shell layer.

    Risks: Stack choice is hard to reverse once a client exists; the decision record matters more than speed here.

    Suggested approach: Prototype-free evaluation is acceptable at this stage: score the candidates against the shell contract (#783 lineage) and the TUI idea's protocol needs before committing.

    Labels were already normalized by the filer (kind, source/human, status/needs-triage, priority, effort, app/id all present); this pass appended the acceptance criteria above and adds meta/enriched.

    🤖 Agent note · filed

    • Agent: fleet monitor
    • Session / ID: repo-fleet-monitor run 2026-10-26 22:19 CDT
    • Found via: monitor reconciliation (intake enrichment, protocol §5)
    • Task: Intake review — verified still live (filed this evening as part of Drew's roadmap/validation batch; no merged PR or commit resolves it), appended acceptance criteria, posted this review.
    • Expectation: done when the acceptance criteria above are met (effort class as labelled by the filer).
  5. dezren39
    added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Oct 27, 2026
  6. dezren39 commented on Oct 28, 2026

    @dezren39
    dezren39
    on Oct 28, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: queue worker (repo-worker-code), lane D
    • Session / ID: queue task 2356
    • Found via: queue claim
    • Task: Triage id: idea — native GUI client #1072 (native GUI client idea) — record the scope boundary vs id: Phase 13 F13.6 native client shells on the shell contract #788 and the stack-decision routing its acceptance criteria ask for
    • Expectation: effort l long-term idea; triage done = boundary stated + decision/deferral recorded on the issue
    • Links: task 2356 in queue repo-health-code-pilot; sibling id: Phase 13 F13.6 native client shells on the shell contract #788
  7. 68 remaining items

  8. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Second-pass stack and routing decision (2026-11-26)

    Decision: adopt Bevy for the native GUI client. The app should grow on the existing id-native-shell Bevy foundation, not add a second GUI framework or embed one inside the other. #788 established Bevy as the F13.6 reference-shell framework; #15022 is the separate first end-user application slice and already landed its first Bevy world-directory/session surface in merged PR #15147. This uses the Bevy-embedding consideration directly: the reference shell and product client share one Bevy application/runtime, so there is no cross-framework embedding boundary to maintain. Tauri, egui, Tauri+egui, Leptos, Dioxus, and Iced are not selected; the repository now has a working Bevy path and a live first-slice issue rather than a reason to introduce another stack.

    Scope boundary: #788 is the completed contract/conformance reference shell (Bevy, same shell contract, no host change); #1072 remains the long-term end-user GUI/client product idea. They are related but not substitutes. Rich scene/audio/widget presentation was split to #12657, which is now closed complete; it does not reopen the #788 boundary.

    Implementation routing: #15022 satisfies the required first implementation issue, and PR #15147 is merged. #15022 remains open for its explicitly recorded follow-up UI/session work (including the live GUI launch proof); the broader product remains tracked here. No duplicate first-slice issue is needed. Keep #1072 open as the priority/low umbrella tracker rather than marking the full product complete.

  9. developing-today-fleet
    added
    queue/queuedHas a queued queue task
    status/needs-triageNot yet triaged; needs a first look
    and removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 26, 2026
  10. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    🤖 Agent note · handed off

    • Agent: fleet monitor
    • Session / ID: repo-fleet-monitor cron run 2026-11-26 06:14 CST; task 21731
    • Found via: monitor reconciliation
    • Task: Claim-evaporation repair: the queue task is queued unclaimed (lease expired, attempts 2) while the issue still carried queue/claimed + work/assigned. Labels reset to queue/queued + status/needs-triage to match the live queue truth.
    • Expectation: a worker re-claims from the queue; checkpoint stage at evaporation: none recorded
    • Links: queue repo-health-code-pilot
  11. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    Second-pass result (agent-next-24-local, 2026-11-26): the #788 framework trigger has fired. #788 is closed; the Bevy decision is recorded on this issue, and first-app PR #15147 plus follow-up slices #15588 and #15675 are merged.

    #15022 still needs visual stacking of the directory/session views and a live GUI launch check. No live queue task existed for that child, so slice #24447 was enqueued and claimed by repo-worker-code for the visual-stacking work; its issue labels now reflect that claim. #1072 remains the low-priority umbrella and is not resolved by those slices.

    Resume when: task #24447 lands its visual slice; then recheck #15022's live-launch evidence and route any remaining GUI surface as a separate slice.

  12. developing-today-fleet
    added
    status/blockedQueue or user escalation state
    queue/blockedQueue or user escalation state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    queue/queuedHas a queued queue task
    on Nov 26, 2026
  13. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Second-pass recheck (2026-11-27)

    The #788 framework trigger has fired and the Bevy decision is already recorded here. Revalidated the first-app tracker #15022: the visual-stacking slice is now merged in #15790 (2026-11-27); earlier first-slice, clipboard, and resize PRs #15147, #15588, and #15675 are also merged. The visual-stacking queue task #24447 is done; its updated-head focused tests and clippy both passed.

    The remaining explicit proof on #15022 is a live GUI launch against a real host on a desktop seat; the latest tracker note says that proof was not part of the merged slice. No other unimplemented software surface is evidenced by this recheck. Keep #1072 open as the low-priority end-user GUI umbrella and #15022 as the implementation/verification tracker; do not create a duplicate implementation packet for already-merged slices.

    Resume this triage when #15022 records the live GUI launch proof, then recheck whether any umbrella-level follow-on remains.

  14. dezren39 commented on Nov 27, 2026

    @dezren39
    dezren39
    on Nov 27, 2026
    MemberAuthor
    More actions

    🤖 Agent note · second-pass verdict — lane 0007-B, queue task 21731 (#1072)

    Fresh verification this lane (2026-11-27, gh CLI, issue + all 35 comments read, second-source reads on every linked item):

    All three acceptance criteria of #1072 are now met:

    1. Stack decision recorded: Bevy adopted — decision comment id: idea — native GUI client #1072 (comment) (2026-11-26): grow on the existing id-native-shell Bevy foundation; Tauri/egui/Leptos/Dioxus/Iced not selected; Bevy-embedding consideration addressed directly (shell and product client share one Bevy runtime, no cross-framework embedding boundary).
    2. Scope boundary vs F13.6 stated: id: Phase 13 F13.6 native client shells on the shell contract #788 = reference native shell / conformance artifact; id: idea — native GUI client #1072 = full end-user GUI app (intake 2026-10-27 + triage of record, task 2356). id: Phase 13 F13.6 native client shells on the shell contract #788 itself is now CLOSED (closedAt 2026-11-22T19:11:39Z, verified fresh) — the long-standing deferral trigger has fired.
    3. First implementation step filed as its own issue: id: native GUI client — first Bevy application slice #15022 (first Bevy application slice), with merged PRs id-native-shell: world directory application surface (#15022) #15147 (2026-11-25T15:22:48Z), feat(id-native-shell): paste the clipboard into the foreground world (#15022) #15588, feat(id-native-shell): keep each session at the window's cell grid (#15022) #15675, and feat(id-native-shell): compose directory and session panels #15790 visual stacking (merged 2026-11-27T03:46:33Z) — all verified MERGED fresh.

    Routing / remainder: #15022 is OPEN, status/in-progress, queue/claimed (verified fresh) and owns the one remaining proof — a live GUI launch against a real host on a desktop seat. Per the 2026-11-27 recheck on this issue, #1072 stays OPEN as the low-priority end-user GUI umbrella and #15022 as the implementation/verification tracker; no duplicate follow-on packet is created by this lane.

    Disposition: queue task 21731 (second-pass verify-and-route) is completed by this lane with this verdict as its record — the second pass found the item already resolved in substance (decision + routing landed), with the sole remainder already owned by live tracker #15022.

  15. developing-today-fleet commented on Nov 28, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 28, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage verdict: already triaged, no new packet.

    Fresh check 2026-11-28: #1072 OPEN, low-priority end-user GUI umbrella, unchanged since the 2026-11-27 verdict (task 21731, lane 0007-B). All three acceptance criteria remain met: Bevy adopted, scope boundary vs #788 stated (#788 still CLOSED), first implementation #15022 filed and OPEN with merged slices (#15147, #15588, #15675, #15790). Live-launch proof stays owned by #15022. No code, no follow-on packet.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepic/id-programReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudpriority/lowNice to have; do when convenientqueue/blockedQueue or user escalation statesource/humanFiled directly by a humanstatus/blockedQueue or user escalation statetask/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.