GeezerVison is showing github.com — impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) · Issue #11184 · developing-today/code
impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184DescriptionImplementation follow-on 3 of 5 from the #6062 design (doc/2026-11-09T07-20-00Z_design_atlas_id_publication/, §9.3), under program #6018.
Scope: projector operations — design §6: run logging with input pins, replay tooling, on-demand backfill (§8.3), ordering/atomicity (§6.4) tests.
Acceptance:
- Every projector run logs its input pins; replay from pins reproduces the run's emissions.
- Backfill covers a stated historical range on demand.
- Ordering/atomicity tests from §6.4 pass.
Parent: #6062 (design, landed via PR #7998). Program: #6018. Activitydeveloping-today commented on Nov 17, 2026 dezren39 commented on Nov 23, 2026 Lane code-i (scheduled Fleet run) checked premise on main at 0ea7313: projector operations cannot start yet. Run logging, replay and backfill attach to a projector that has not landed: #11182 (follow-on 1, versions/files/relations) and #11183 (follow-on 2, attestations/runs) are both still open, and pkgs/atlas-search has no projector, run-log or backfill code. Task 21469 parked with ready-condition: #11182 and #11183 closed. No code changed. dezren39 commented on Nov 24, 2026
Lane any-n (queue task 21469), premise check on origin/main 0eee92bf237 (2026-11-24). Parking, no code change — seventh independent confirmation (oc-code-07 / code-j / code-g / xaltha / code-g-2 / code-f / code-i findings hold).
- Issue OPEN, comments read fresh via REST (count-confirmed: 2, no live claim).
- impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 (follow-on 1) and impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 (follow-on 2) both still OPEN.
BatchStatement shape exists in pkgs/atlas-search/crates/atlas-core/src/attestation.rs (in-toto shape only); file header states registry table, gate wiring, emission point are later slices, and impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 mapping consumes canonical_bytes — not landed.
- No projector emission, run-log, replay, or backfill code on main; ordering/atomicity (§6.4) has nothing to attach to.
Resume when #11182 and #11183 close on main. dezren39 commented on Nov 25, 2026 Lane any-n, queue task 21469: premise check refreshed from GitHub REST on 2026-11-25 (issue #11184 comments count-confirmed: 3). No code changed. The prerequisite issues are still OPEN: #11182 is actively progressing through bounded slices (latest comments name tasks 23667 and 23672; latest update records PR #14683), and #11183 remains open/in review. Projector operations do not have a settled landed foundation to attach to yet. Parking task 21469 with its existing ready condition: #11182 and #11183 closed. developing-today-fleet commented on Nov 25, 2026
Lane felix (queue task 21469), premise check refreshed 2026-11-25 ~02:50 CST. Parking, no code change.
- Issue impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184 OPEN; comments read fresh via REST (4 comments, newest 7150989687).
- Prerequisites still OPEN: impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 (follow-on 1, versions/files/relations emission) and impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 (follow-on 2, attestations and ingest runs) — both verified OPEN via fleet gh just now.
- Projector operations (run logging, replay, backfill) attach to the projector those two follow-ons land; without them there is no settled foundation to implement against.
- Task 21469 parked with its existing ready condition: impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 and impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 closed.
developing-today-fleet commented on Nov 25, 2026 Lane IW-302 (queue task 21469), premise check 2026-11-25: prerequisites #11182 and #11183 verified OPEN via fleet gh REST just now; no projector code exists yet for run logging / replay / backfill to attach to. Task parked with wake condition: both #11182 and #11183 closed. No code changed. developing-today-fleet commented on Nov 26, 2026
Lane DA (queue task 21469), premise check refreshed 2026-11-26 ~14:20 CST. Parking, no code change.
- Issue impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184 OPEN; comments read fresh via fleet gh REST (per_page=100, count-confirmed: 6, newest is the IW-302 park 2026-11-25). No live competing claim in comments; this lane's claim is via queue task 21469.
- Prerequisites still OPEN, verified via fleet gh REST just now:
- Projector operations (run logging with input pins, replay, backfill in design §6 / §8.3, §6.4 ordering/atomicity tests) attach to the projector those two follow-ons land; without both closed there is no settled landed foundation to attach to. Working the blockers from this lane would collide with their own claimed/in-progress lanes.
- Task 21469 parked with non-person ready condition: issue_closed for developing-today/code impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 and impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 (same condition as prior parks).
- No code changed, no PR opened, PR feat(fleet-queue): SEL-01 pure reference selector — both predicates, hard gates, urgent predicate (#9491) #15186 not touched.
developing-today-fleet commented on Nov 26, 2026
Lane code-i, task 21469 — premise recheck 2026-11-26 ~16:31 CST. Parking without code changes.
- Issue impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184 remains OPEN; comments read fresh via Fleet REST (per_page=100, count-confirmed: 7, newest #7202595565). No other live queue claim for this issue was present in the claimed-task list; this lane holds task 21469.
- Current main is fec5b21.
- Prerequisite impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 is now CLOSED (18 comments, count-confirmed); its latest verdict says its acceptance is complete and operations remain this follow-on's scope.
- Prerequisite impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 remains OPEN (10 comments, count-confirmed). Its latest triage says it is blocked on upstream design(atlas): ingest attestation record — in-toto-shaped per-batch statement binding chunks to sources #6045 implementation; attestation/ingest-run foundation is therefore not settled on main.
- Projector operations (run logging/pins, replay, backfill) still have no settled foundation to attach to while impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 remains open. Resume when impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 closes; impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 is already closed.
- No code changed and no worktree created.
dezren39 commented on Nov 27, 2026
Lane 2022-F (queue task 21469), premise recheck 2026-11-26 ~20:55 CST. Releasing the claim back to the queue — with a material premise change recorded:
- Issue impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184 OPEN; comments read fresh via gh REST (per_page=100, count-confirmed: 8).
- Both prerequisites are now CLOSED: impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 closed (updated 2026-11-26T22:26Z) and impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 closed (updated 2026-11-27T01:56Z). The
issue_closed ready condition on task 21469 that caused the earlier parks (lanes any-n, felix, IW-302, DA, code-i) is satisfied — this task is now ready for implementation.
- This lane is a gh-API-only verify/merge lane for the delta PRESS run (no clones, no worktrees, no laptop builds per its brief), so it cannot implement projector operations itself. The claim is released so an implementation lane can draw it; nothing else about the task changes. Acceptance remains the issue's own criteria (run logging with input pins, replay from pins, on-demand backfill, §6.4 ordering/atomicity tests).
developing-today-fleet commented on Nov 27, 2026 Lane code-i, task 21469 — implementation slice recorded 2026-11-26.
Parking the queue task with ready condition: PR #15892 is merged, then resume #11184 for replay/backfill and ordering/atomicity coverage. developing-today-fleet commented on Nov 27, 2026 Lane oc-code-06, task 21469 — fresh premise/ownership check (2026-11-26 22:32 CST; GitHub REST, count-confirmed: 10 issue comments). #11182 and #11183 are CLOSED. PR #15892 is still OPEN (not merged), implementing the initial run-log/pins slice; its description leaves replay execution, backfill, and publisher-side atomic persistence out of scope. The queue task’s existing wake condition is PR #15892 merged, so this lane is parking without duplicating work. Resume on merge to implement the remaining acceptance criteria. No code changed. developing-today-fleet commented on Nov 27, 2026
Progress (lane code-f, task 21469): replay slice is in PR #15956 (OPEN, code-f/21469-projector-replay). replay_run_from_pins re-projects from the persisted pins and fails closed unless ordered claims, count, and resulting chain head match the log; tests cover a persisted round trip, substituted statements, and a broken pinned head. Targeted local suite: 12 passed. Fleet remote dispatch returned HTTP 403, so PR CI is still pending. The run-log prerequisite is now merged (#15892); remaining #11184 work is on-demand historical backfill and publisher ordering/atomicity tests. Resume this task when PR #15956 merges. developing-today-fleet commented on Nov 27, 2026 Lane code-j, queue task 21469 — backfill slice merged (outcome record, no code changes in this comment).
Premise rechecks (GitHub REST, per_page=100, count-confirmed: 12 comments, no live competing claim): prerequisites #11182 and #11183 CLOSED; run-log slice #15892 MERGED (084046c); replay slice #15956 MERGED (281e3b9).
This slice: PR #15985 MERGED (merge SHA 0b1fa40, branch code-j/21469-projector-backfill) — on-demand backfill over a stated historical range plus §6.4 ordering/atomicity tests:
- BackfillRequest (run_id + batch_ids in chain order; pull default per §8 item 3) and backfill_range (history lookup, then project_run_with_pins under the run pins). Stated-range order governs publication; fails closed on unknown batch ids and skipped chain links; empty range yields an empty log.
- Tests: stated range reproduces live-run claims byte-identical (ordering), per-claim atomicity (each claim recomputes from its statement rows) with manifest serialization round trip, unknown-batch refusal, skipped-link refusal, empty-range case.
Verification: cargo test --manifest-path pkgs/atlas-search/Cargo.toml -p atlas-core id_projection --lib → 17 passed (12 pre-existing + 5 new); git diff --check clean. PR showed MERGEABLE/CLEAN with no required checks reported; fleet shell dispatch ran against a stale checkout (0 matched), so the local suite plus PR merge state are the signals.
Acceptance status for #11184: run logging with input pins (done, #15892), replay from pins (done, #15956), backfill over stated range on demand (done, #15985), §6.4 ordering/atomicity tests (done, #15985). Task 21469 ready to complete.
MetadataMetadataDevelopmentNo branches or pull requestsIssue actions
|