GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — Fan-out answer completeness, per-peer timeouts and unanswered-peer reporting · Issue #11414 · developing-today/code

Fan-out answer completeness, per-peer timeouts and unanswered-peer reporting #11414

New issue
Copy link
New issue
Copy link
Closed
#11495
Closed
Fan-out answer completeness, per-peer timeouts and unanswered-peer reporting#11414
#11495
Copy link
Assignees
dezren39
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/mMedium: expected under 1 day of workepic/id-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingpriority/normalOrdinary priority (the default)status:done

Description

@dezren39
dezren39
opened on Nov 17, 2026
Issue body actions

Part of epic: #9144 (design record: doc/2026-11-17T15-40-00Z_design_id_federated_query_fanout/).

Problem and goal

A federated query fan-out answer must say what it covers. A remote that is slow or down, or a budget or deadline that cuts the fan-out short, must not leave the requester with an answer that looks complete. Today no contract defines the answer's completeness, the list of peers that did not answer, or the per-hop status values. This increment defines and tests those fields. Nothing in S1.47–S1.63 or in the filed sub-issues owns them.

Version and design basis

Design record: doc/2026-11-17T15-40-00Z_design_id_federated_query_fanout/ sections 6.3, 7.1–7.4.
Extends: doc/2026-11-08T06-45-00Z_design_id_query_local_remote_v1/ §8 (truncation honesty, never a silent partial answer); doc/2026-11-13T03-40-00Z_design_id-atlas-summit/part-b/versioned-design.md V3 (per-hop budgets, explicit completeness claim).
Consistent with, not re-deciding: doc/2026-11-10_design_id6002_cooperative_timeout_contract.md (its "partial results discarded" rule is for world invocations, not for finished fan-out peers); B30 (#10279) owns the integrity of completeness claims.

Scope

  • Answer envelope: completeness (complete | partial), unanswered_peers[], and ProvenanceEntry.status (answered, empty, not_permitted, ineligible, timeout, unavailable, refused, budget_exhausted, result_evicted).
  • Deadline rule: a peer that answers before the deadline keeps its signed response. Unfinished peers are recorded as timeout. The answer is partial.
  • Additive fields only. An empty remote list keeps the v1 local answer unchanged.

Test / evidence first

A golden test over a fixed three-peer fixture: one slow, one down, one answering. Oracle: golden. Expected: completeness = partial, unanswered_peers lists the slow and down peers, and the answering peer's result is kept. A second case: all peers answer within the deadline, so completeness = complete with an explicit scope.
Proposed command: to be fixed by the implementation slice.

Done and rollback

Done when both golden cases pass and the changed-file summary is attached.
Rollback: return every fan-out answer to partial with no peer detail, and keep local-only queries.

Not in this issue: the config keys (owned by #9111), requester-facing provenance presentation (owned by #10249), and the integrity of completeness claims (B30, #10279).

Activity

  1. dezren39
    added
    priority/normalOrdinary priority (the default)
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    effort/mMedium: expected under 1 day of work
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    on Nov 17, 2026
  2. dezren39
    added a parent issue on Nov 17, 2026
    • design(id): federated query fan-out — prioritized remotes, trusted relay, max-hops #9144
  3. dezren39
    added
    epic/id-programReprioritization program epic (2026-11-12)
    on Nov 17, 2026
  4. developing-today commented on Nov 17, 2026

    @developing-today
    developing-todayBot
    on Nov 17, 2026 – with developing.today
    Contributor
    More actions

    CODE-4123

  5. dezren39
    added a commit that references this issue on Nov 17, 2026

    docs(id): link follow-on scope 2 to #11414 (#9144)

    a8a90f4
  6. github-actions
    assigned
    dezren39
    on Nov 18, 2026
  7. developing-today
    added
    status:in-review
    on Nov 18, 2026
  8. dezren39
    closed this as completedin #11495on Nov 18, 2026
  9. developing-today
    added
    status:done
    and removed
    status:in-review
    on Nov 18, 2026
  10. dezren39 commented on Nov 18, 2026

    @dezren39
    dezren39
    on Nov 18, 2026
    MemberAuthor
    More actions

    Fresh verification 2026-11-18 09:51 UTC: #11414 is CLOSED; implementation merged in PR #11495 (merge commit 2365ce7; commit ca4910f). Current origin/main contains the fan-out completeness/unanswered-peer implementation. No production or schema action taken in this triage.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/mMedium: expected under 1 day of workepic/id-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingpriority/normalOrdinary priority (the default)status:done

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.