GeezerVison is showing github.com — impl(aggregator): queue visibility views - in-progress, blocked, recently-done as first-class cross-project lists · Issue #1160 · developing-today/code
impl(aggregator): queue visibility views - in-progress, blocked, recently-done as first-class cross-project lists #1160DescriptionFinding
Drew's requirement: clearly see what's being worked on, what's blocked, what was done recently - across projects. Today: in-progress is three disagreeing sources (board lane, Project Status, session claims - see reconciled-in-progress issue); blocked lives only inside orchestration tiers (invisible while tiers are broken); recently-done has no home (board's 95 done cards are the closest, unfiltered by date and mixed with bookkeeping noise).
Proposal
One /queue page (or /today sections) with three lists, all from published data: In progress (reconciled list), Blocked (every item with blockedBy, blocker state + worker + age of block), Done recently (pool Done + merged PRs, last 7 days, bookkeeping class filtered). Each row: project/Area chip, epic parent where known, age, link to item page.
Acceptance
Acceptance criteria
- /queue (or /today sections) renders the three first-class lists — In progress (reconciled set, impl(aggregator): one reconciled in-progress list - board lane, Project status, and session claims currently disagree #1162), Blocked (every item with blockedBy + blocker state + worker + age of block), Done recently (pool Done + merged PRs, last 7 days, bookkeeping class filtered) — restating the body's Acceptance section as the criteria section.
- Each list's counts reconcile with its source on spot-check (an item sampled per list matches GitHub/Project state).
- The Blocked list renders non-empty on tonight's data via a test fixture that proves rendering independent of orchestration tier health.
Activitydeveloping-today commented on Oct 27, 2026 dezren39 commented on Oct 28, 2026 Intake review
- Related: impl(orchestrator): recurring orchestration job — queue triage, priority ladder, blocker awareness, goal measurement #899 (dashboard requirement); consumes impl(aggregator): one reconciled in-progress list - board lane, Project status, and session claims currently disagree #1162 (reconciled in-progress set) and impl(aggregator+orchestrator): Next-up view - what would be picked up next, in ladder order, across projects #1158 (next-up data contract — coordinate the /queue page so the two land as one surface).
- Still live: filed from the 2026-10-26 live review; a merged-PR search returned no resolving PR; blocked still lives only inside orchestration tiers per the finding.
- Notes: the body carries an
## Acceptance section; an ## Acceptance criteria section restating it has been appended (original body preserved verbatim above it).
- Risks: three lists, three sources with three freshness profiles — the spot-check reconciliation in the acceptance criteria is the real deliverable; a list that renders but miscounts is worse than no list. The Done-recently bookkeeping filter needs a definition or the list re-creates the board's completion-log problem (fix(aggregator): board is again a completion log - 95 of 107 cards are Done; age out / collapse done by default #1146).
- Suggested approach: land the Blocked list first (its source, orchestration.json blockedBy, already exists and is fixture-testable), then In progress once impl(aggregator): one reconciled in-progress list - board lane, Project status, and session claims currently disagree #1162's set exists, then Done recently.
- Labels normalized by fleet monitor:
priority/normal, effort/m, source/human, status/needs-triage, meta/enriched (kind/feature and app/pm-stack were already present).
dezren39 commented on Nov 3, 2026 🤖 Agent note · handed off
- Agent: fleet monitor (repo-fleet-monitor)
- Session / ID: task 7647
- Found via: monitor reconciliation
- Task: Claim-eviction repair: the queue task for this issue is queued and unclaimed (its previous claim's lease expired without a complete/park/block), but the issue labels still said claimed. Labels reset to the truth: queue/queued + status/needs-triage. Checkpoint stage on the task: handed_off.
- Expectation: a queue lane re-claims the task and resumes from the checkpoint stage named in the task progress.
dezren39 commented on Nov 3, 2026
Task 7647 was launched and bound to OpenCode session ses_e5e5c633b13ffeOSAboIp3Mg4W by opencode-claimant. It is executing as repo-worker-code with instructions to verify the current issue state and reconcile the stale label/queue state before routing. dezren39 commented on Nov 3, 2026 Fresh triage verdict (2026-11-03): already implemented — closing completed
At the fresh check, #1160 was open and carried task/triage, status/needs-triage, and queue/queued (those queue/triage labels no longer reflect this claimed triage or the implemented state). No hard-stop labels were present.
The requested work is present on current main (7a8500417188465deea72339db81fcf1a92c8448): PR #3959 merged as 5de0661d2ad4b1e1446737976226811ac7d161ba, and a fresh compare confirms that merge commit is an ancestor of main (behind_by: 0). Current pm-stack/aggregator/src/server.ts registers /queue and /api/queue.json; src/queue-view.ts derives In progress, Blocked, Done recently, and Next up. test/queue-view.test.ts covers reconciliation with orchestration absent, a non-empty blocked list with empty orchestration tiers plus Project blockers (including blocker/worker/age), seven-day done/merged-PR filtering excluding bookkeeping, and rendering all sections. PR #3959 reports its check successful.
Disposition: no fix remains and no follow-up task is warranted; this is already handled by #3959. No blockers or ordering dependencies. I’m removing stale queue/triage labels, marking triage disposition, and closing this issue as completed.
MetadataMetadataDevelopmentNo branches or pull requestsIssue actions
|