GeezerVison is showing github.com — design(quota-plane): Stage 3 — predictive, self-tuning quota operations · Issue #1177 · developing-today/code
design(quota-plane): Stage 3 — predictive, self-tuning quota operations #1177DescriptionPriority P2 — order 11. Horizon: Month. Design: quota-plane-design-2026-10-26.md (usage-billing-hub goal files), Stage 2. Parent context: epic #1047. (§6)
Design Stage 3 — predictive, self-tuning quota operations — so the next stage is planned before it is needed:
- Pace forecasting per window (projected exhaustion) driving placement BEFORE caution zones, not at them.
- Automatic pool re-weighting PROPOSALS as repo PRs (never silent config edits) with the forecast evidence attached.
- Anomaly detection: burn spikes, adapter schema drift, vendor plan changes wired to the evidence-baseline diff protocol.
- A weekly design review folding forecast accuracy back into the rules.
Method: one design doc (stage-3-design) in the usage-billing-hub goal files, using >=2 weeks of gatherer history as its evidence base; Drew reviews; then granular issues per component under a Stage-3 epic, same filing pattern as Stages 1-2.
Acceptance: design doc delivered + linked from the hub GOAL.md; Stage-3 epic filed with prioritized children (or an explicit Drew decision to defer).
Acceptance criteria
- A Stage-3 design doc (predictive, self-tuning quota operations) is delivered in the usage-billing-hub goal files, grounded in ≥2 weeks of gatherer history.
- The doc is linked from the hub GOAL.md.
- A Stage-3 epic with prioritized child issues is filed — or an explicit Drew decision to defer is recorded.
Activitydeveloping-today commented on Oct 27, 2026 dezren39 commented on Oct 28, 2026 Intake review
Fleet monitor intake enrichment (protocol §5) — 2026-10-28T06:26Z. This issue was filed 2026-10-27 by Drew (dezren39) from the 2026-10-26 live pm-stack review and had no priority/* label and no standard ## Acceptance criteria section; both are now supplied (the body's own Acceptance text is restated under the standard heading, original body preserved verbatim above it).
- Related: Parent context in body: epic epic(usage-hub): SaaS/cloud services completion — v2 live collectors, daily console reads, v3 reconciliation #1047, quota-plane design Stage 2. Body states Priority P2 / Month horizon. No merged PR references this issue.
- Labels normalized: one
kind/* (added kind/docs), source/human, status/needs-triage, priority/normal, effort/l, app/pm-stack (existing), meta/enriched.
- Still live: verified open this run; no merged PR or commit found that implements it.
- Risks: Design without the implementation link would sit silently — the acceptance requires the epic (or an explicit deferral decision) in the same pass. This is a design-stage item, not a code fix.
- Suggested approach: Draft from the Stage-2 design doc plus gatherer history once ≥2 weeks exist; keep forecasting/re-weighting proposals PR-based, never silent config edits, as the body specifies.
dezren39 commented on Nov 1, 2026 Picked up queue task 2463 for triage. Checking current ownership, evidence availability, and whether the prescribed follow-up is appropriately scoped.
dezren39 commented on Nov 22, 2026 agent-note:v1
event: progress
by: agent felix (kind muse, Muse sandbox seat)
at: 2026-11-22
Design delivered for review:
- PR design(quota-plane): Stage 3 — predictive, self-tuning quota operations (#1177) #12702: design(quota-plane): Stage 3 — predictive, self-tuning quota operations (#1177) #12702 —
doc/2026-11-22T22-35-00Z_design_quota-plane-stage-3/, docs-only, no new dependencies. Hub copy at files/stage-3-design-2026-11-22.md (usage-billing-hub goal files), linked from the hub GOAL.md — both acceptance homes satisfied by the same document.
- Precondition, from the data itself: aggregator snapshot store (
~/.local/state/pm-aggregator/snapshots/, laptop): 20,635 records, 2026-10-20T12:00:00Z → 2026-11-22T22:30:49Z (33 days vs the ≥2 weeks required); 20,569 records in the gatherer era (≥2026-10-27); all routing pools covered (antigravity doors, opencode-go workspaces, anthropic:claude-pro, meta:high-usage, openai:codex, cline-pass, command-code, opendesign). Gatherer live at verification (heartbeat tick 2026-11-22T22:30:11Z, ok). The design (§2) also records the limits: weekday profiles too thin to tune on, and serviceId rename joins the backtest must carry as code.
- Stage-3 epic filed: epic(quota-plane): Stage 3 — predictive, self-tuning quota operations #12694, children impl(quota-plane): stage-3 S1 — forecast product: per-tick quota-forecast from the analytics pace math #12695 (S1 forecast product), impl(quota-plane): stage-3 S2 — forecast accuracy ledger + backtest harness over the snapshot history #12696 (S2 accuracy ledger + backtest), impl(quota-plane): stage-3 S3 — shadow placement: forecast-informed ordering logged beside live ordering #12697 (S3 shadow placement), impl(quota-plane): stage-3 S4 — live forecast-driven admission: pace_hold from projected exhaustion #12698 (S4 live admission), impl(quota-plane): stage-3 S5 — anomaly detectors: burn spike, adapter schema drift, vendor plan change #12699 (S5 anomaly detectors), impl(quota-plane): stage-3 S6 — re-weighting proposal generator: route-config PRs with forecast evidence #12700 (S6 proposal generator), impl(quota-plane): stage-3 S7 — weekly forecast-accuracy review job: fold accuracy back into the rules #12701 (S7 weekly review) — prioritized, each independently landable with its acceptance evidence. Children enqueue after Drew's design review, per this issue's method.
Remaining on #1177: Drew's review of PR #12702. On approval the acceptance is fully met (doc delivered + linked; epic + children filed); on a defer decision, that decision gets recorded here instead. dezren39 commented on Nov 22, 2026
Released by felix (outcome: free). Stage-3 design delivered as PR #12702 (docs-only); precondition verified (snapshot store 2026-10-20→2026-11-22, 20,635 records); Stage-3 epic #12694 + children #12695-#12701 filed; remainder is Drew review of the design dezren39 commented on Nov 22, 2026 decision:v1
by: Drewry (via Felix, main chat)
at: 2026-11-22
Stage-3 design APPROVED. PR #12702 merged 2026-11-22T23:52:19Z. The deliberate not-enqueued gate on the Stage-3 epic #12694 is lifted: slices S1 (#12695, forecast product) and S2 (#12696, accuracy ledger + backtest) enqueue first, in parallel, per the design's own sequencing. dezren39 commented on Nov 23, 2026 Close-out verification (code-g, 2026-11-23)
Checked both acceptance criteria against origin/main with evidence:
- Stage-3 design doc delivered + linked — PR design(quota-plane): Stage 3 — predictive, self-tuning quota operations (#1177) #12702 merged 2026-11-22T23:52:19Z (merge commit b667d6b on main). Doc lives at doc/2026-11-22T22-35-00Z_design_quota-plane-stage-3/2026-11-22T22-35-00Z_design_quota-plane-stage-3.md. Hub copy + GOAL.md link recorded in the 2026-11-22 review note; Drew approved the design the same day (decision note on this issue).
- Stage-3 epic filed with prioritized children — epic(quota-plane): Stage 3 — predictive, self-tuning quota operations #12694 OPEN with children impl(quota-plane): stage-3 S1 — forecast product: per-tick quota-forecast from the analytics pace math #12695 S1, impl(quota-plane): stage-3 S2 — forecast accuracy ledger + backtest harness over the snapshot history #12696 S2, impl(quota-plane): stage-3 S3 — shadow placement: forecast-informed ordering logged beside live ordering #12697 S3, impl(quota-plane): stage-3 S4 — live forecast-driven admission: pace_hold from projected exhaustion #12698 S4, impl(quota-plane): stage-3 S5 — anomaly detectors: burn spike, adapter schema drift, vendor plan change #12699 S5, impl(quota-plane): stage-3 S6 — re-weighting proposal generator: route-config PRs with forecast evidence #12700 S6, impl(quota-plane): stage-3 S7 — weekly forecast-accuracy review job: fold accuracy back into the rules #12701 S7. S1 already landed (ee0591f). No open PR names this issue; nothing further is queued here.
No code change in this slice — close-with-evidence only. Remaining Stage-3 work tracks under #12694. dezren39 commented on Nov 23, 2026
MetadataMetadataDevelopmentNo branches or pull requestsIssue actions
|