GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — pm-stack: staleness lane — surface >90d-untouched items per repo, starting with a nix triage campaign · Issue #1224 · developing-today/code

pm-stack: staleness lane — surface >90d-untouched items per repo, starting with a nix triage campaign #1224

New issue
Copy link
New issue
Copy link
Open
Open
pm-stack: staleness lane — surface >90d-untouched items per repo, starting with a nix triage campaign#1224
Copy link
Labels
app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/mMedium: expected under 1 day of workepic/pm-stackReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/humanFiled directly by a humantask/triageQueue packet kind: verify, reproduce, and route this item

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

Part of epic #1184 (PM stack coherence review, 2026-10-26).

Staleness is invisible at the PM layer. Evidence: in the audit sample, 267 of 300 open dezren39/nix issues were untouched in >90 days (oldest 2024-02-12), openchamber 40% >90d, and code 15% >90d plus an item last updated 2025-03-20. Project #4 has no staleness field or view that anyone owns, and Grist fleet rows still quote 2026-10-24 open counts.

Acceptance:

  • Staleness counts per repo are visible in one place and <=7d old.
  • A first nix triage campaign runs: the stale count drops, or every remaining stale item carries an explicit parked/triage disposition.
  • The lane is a report/panel in the PM view, not a one-off spreadsheet.

Acceptance criteria

  • Staleness counts per repo are visible in one place and ≤7 days old.
  • A first nix triage campaign runs: the stale count drops, or every remaining stale item carries an explicit parked/triage disposition.
  • The lane is a report/panel in the PM view, not a one-off spreadsheet.

Related program: #1184

Activity

Next
  1. dezren39
    added
    kind/featureNew feature or capability request
    status/needs-triageNot yet triaged; needs a first look
    priority/normalOrdinary priority (the default)
    app/pm-stackpm-stack (Pad/Grist) in developing-today/code
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-358

  3. dezren39
    added a parent issue on Oct 27, 2026
    • epic(dashboard): PM stack coherence - single-URL, fresh data, triage-able, hierarchical #1184
  4. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  5. dezren39
    added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    effort/mMedium: expected under 1 day of work
    source/humanFiled directly by a human
    on Oct 28, 2026
  6. dezren39 commented on Oct 28, 2026

    @dezren39
    dezren39
    on Oct 28, 2026
    MemberAuthor
    More actions

    Intake review

    Related: epic #1184; the nix stale backlog is the campaign target (267 of 300 sampled open nix issues >90d untouched at the 2026-10-26 review). Sibling #1220 covers Project #4 coverage; this one is the staleness lane specifically.
    Notes: the campaign half is the bulk of the work — the panel itself is a small aggregator addition. No merged PR references this issue (checked this run).
    Risks: mass-triaging 267 issues can generate label noise without dispositions; the acceptance's 'explicit disposition per remaining item' is the guard.
    Suggested approach: ship the panel first (counts only), then run the nix campaign in batches by app/area.


    🤖 Agent note · filed

    • Agent: fleet monitor
    • Session / ID: repo-fleet-monitor run 2026-10-28 02:19 CDT
    • Found via: monitor reconciliation
    • Task: Intake enrichment (protocol §5): acceptance-criteria section appended, labels normalized, this review posted.
    • Expectation: effort as labelled; done when the acceptance criteria above are met.
  7. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Nov 1, 2026
  8. 168 remaining items

    Load more actions
  9. dezren39 commented on Nov 11, 2026

    @dezren39
    dezren39
    on Nov 11, 2026
    MemberAuthor
    More actions

    Agent note — triage verdict confirmed, route complete (task 14604, lane code-v)

    • Task 14604 (triage, safety-net re-enqueue) claimed by lane code-v; lane assignment direct — worked in this shift.
    • Fresh revalidation 2026-11-11T03:31Z: issue pm-stack: staleness lane — surface >90d-untouched items per repo, starting with a nix triage campaign #1224 OPEN, no hard-stop labels (held / user/owned / do-not-merge / do-not-auto-edit absent), no status/needs-triage.
    • Verdict of record stands: task 11921 (2026-11-08) triaged this issue REAL AND CURRENT, and task 14285 (2026-11-10) already closed a duplicate triage packet as already-triaged. This packet completes the same way, with the routing now further advanced:
      • Acceptance bullet 1 (staleness counts per repo visible in one place, ≤7d old) is DELIVERED: canonical PR feat(pm): report stale open issues per repository #3992 feat(pm): report stale open issues per repository was shepherded by follow-on task 13892 and MERGED 2026-11-09T01:44:32Z (merge commit 1134e4b). No competing PR was created.
      • Acceptance bullet 2 (first nix triage campaign) remains genuinely open work and is why issue pm-stack: staleness lane — surface >90d-untouched items per repo, starting with a nix triage campaign #1224 stays OPEN; it proceeds via the nix sweep machinery (the nix pile is worked by ordinary sweeps; no live queue packet for PR feat(pm): report stale open issues per repository #3992 or this issue exists besides this one, verified fresh).
    • Task 14604 completes as triaged. Claim labels from this packet removed at terminal.
  10. dezren39
    added
    epic/pm-stackReprioritization program epic (2026-11-12)
    and removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 11, 2026
  11. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    agent-note:v1 — task 18092 (triage, lane code-d) — state: triaged

    Bulk-intake re-triage of issue #1224: already triaged (task 2498, confirmed by tasks 11921, 14285, 14604); this shift fresh-verifies the standing verdict and the one delivered bullet.

    Fresh evidence (2026-11-17T01:29Z):

    • Issue pm-stack: staleness lane — surface >90d-untouched items per repo, starting with a nix triage campaign #1224 OPEN; labels kind/feature, task/triage, priority/normal, effort/m, meta/enriched, app/pm-stack, epic/pm-stack; no held / user/owned / do-not-merge / do-not-auto-edit labels and no status/needs-triage.
    • Acceptance bullet 1 + 3 (staleness counts per repo visible in one place, ≤7d old, as a report/panel in the PM view): DELIVERED — PR feat(pm): report stale open issues per repository #3992 "feat(pm): report stale open issues per repository" fresh-verified MERGED 2026-11-09T01:44:32Z.
    • Acceptance bullet 2 (first nix triage campaign: the stale count drops, or every remaining stale item carries an explicit parked/triage disposition) remains open work and is why pm-stack: staleness lane — surface >90d-untouched items per repo, starting with a nix triage campaign #1224 stays OPEN; per the task 14604 verdict it proceeds via the nix sweep machinery (the nix pile is worked by ordinary sweeps), not a new packet from this triage.

    Classification unchanged: kind/feature, priority/normal, effort/m. Task 18092 completes as triaged, naming the existing triage notes on this issue.

  12. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    agent-note:v1
    lane: repo-worker-code (openchamber-scheduled-lane code-j)
    state: blocked — packet_defect
    Fresh state 2026-11-17: #1224 OPEN, part of epic #1184. The acceptance needs a staleness panel in the PM view (project #4) and a nix triage campaign across the stale backlog. That is multi-repo, epic-scale work, not the small_fix this packet types. Blocked as packet_defect so the owner can re-scope it as a program.

  13. dezren39
    removed their assignment
    on Nov 20, 2026
  14. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    agent-note:v1 — second-pass task 21710 (lane any-o, 2026-11-24). Fresh state: #1224 OPEN, labels unchanged (kind/feature, effort/m, task/triage, no hold labels). Acceptance bullet 1 is still delivered by merged PR #3992 (2026-11-09). Bullet 2 (nix triage campaign) is the remaining open work and is epic-scale, so it does not fit a single small packet. Verdict: already triaged, no new packet routed in this pass. Tracking: #14158

  15. developing-today-fleet commented on Nov 25, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 25, 2026 – with developing.today fleet
    Contributor
    More actions

    agent-note:v1 — felix lane (Muse sandbox seat) picked up #1224 via fleet agent next shortlist draw, 2026-11-25.

    Premise check against current main (b3d7aa1) and live GitHub state:

    • Bullet 1 (staleness counts per repo visible in one place, ≤7d old): DELIVERED — PR feat(pm): report stale open issues per repository #3992 merged 2026-11-09; the collector censuses all four REPOS (model.ts) with the >90d Search query and the /projects coverage panel renders count + collected-at + freshness status.
    • Bullet 3 (report/panel in the PM view, not a spreadsheet): DELIVERED — same panel + /api/projects.json coverage.
    • Bullet 2 (nix triage campaign: stale count drops, or every remaining stale item dispositioned): the measured number today, using the collector's own query shape (repo:<r> is:issue is:open updated:<2026-08-27): 0 stale in all four repos — dezren39/darwin-nix 0 of 55 open (oldest-updated open issue 2026-11-17), code 0, opencode 0, openchamber 0. The 267-item dezren39/nix pile from the audit sample no longer exists (repo renamed to darwin-nix; backlog swept).

    Slice being landed in this pass (feature-slice): the panel's '>90 days untouched' column is the only coverage column with NO week-over-week delta — every other count renders current-minus-baseline in parentheses — so the drop bullet 2 promises cannot actually be seen on the panel. This PR adds staleOpenIssues to diffCoverage/RepoCoverageDelta (null where either side is uncounted, same contract as the other counts) and renders the stale cell through the same delta cell helper, with tests. After this PR, a stale-count drop shows on the panel as e.g. 0 (-267) against the weekly baseline.

  16. dezren39
    added 2 commits that reference this issue on Nov 25, 2026

    test(pm): stale-count week-over-week delta expectations for #1224

    e5fbef8

    feat(pm): week-over-week delta for the stale-issue count (#1224)

    0128f47
  17. developing-today-fleet commented on Nov 25, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 25, 2026 – with developing.today fleet
    Contributor
    More actions

    agent-note:v1 — felix lane progress note, 2026-11-25. PR open: #15015 (head 0128f47, left unmerged for Felix's review).

    Slice landed: the stale-issue count now carries the week-over-week delta like every other coverage count — diffCoverage reports staleOpenIssues (null where either week is uncounted) and the panel renders the '>90 days untouched' cell through the shared delta helper.

    Evidence (remote, fleet-command runners):

    • Failing first, tests only (e5fbef8): run 45588869566 — 57 pass / 2 fail, the only failures the two new tests.
    • After the fix: run 45589864896 — bun test coverage+program+feed: 136 pass / 0 fail, both new tests passing by name.
    • tsc (run 45589892901): no errors in touched files; the one project error is pre-existing on main in an unrelated fixture — filed as pm-stack aggregator: tsc --noEmit fails on main — store-remote-backends.test.ts DashAction fixture missing clientToken #15013.

    Acceptance criteria, re-checked this pass:

    • Bullet 1 (counts per repo visible in one place, ≤7d old): DONE — PR feat(pm): report stale open issues per repository #3992 (merged 2026-11-09); collector censuses all four REPOS; panel shows count + collected-at + freshness status.
    • Bullet 3 (panel in the PM view, not a spreadsheet): DONE — /projects coverage panel + /api/projects.json.
    • Bullet 2 (nix campaign: stale count drops, or every remaining stale item dispositioned): the count has dropped — measured today with the collector's own query: 0 stale in dezren39/darwin-nix (of 55 open; oldest-updated 2026-11-17) and 0 in code, opencode and openchamber, vs 267 stale in the audit sample. The drop came from ordinary sweeps and the dezren39/nix → darwin-nix rename rather than a campaign run under this issue; there are no stale nix items left to disposition.

    Next slice, in feature-slice form: after PR #15015 merges and one weekly snapshot rotation passes, the panel shows the stale delta against baseline; if the four counts are still 0 at that point, run the done check and close #1224 — if any repo's stale count climbs above 0 again, the remaining work is the disposition arm (an explicit parked/triage note on each stale item) for that repo.

  18. developing-today-fleet
    added a commit that references this issue on Nov 25, 2026

    Merge pull request #15015 from developing-today/felix/1224-staleness-…

    d4ae791
  19. developing-today-fleet commented on Nov 25, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 25, 2026 – with developing.today fleet
    Contributor
    More actions

    Staleness-delta slice landed: PR #15015 merged by Felix — the coverage panel now shows the week-over-week delta for stale open issues too (a drop renders as e.g. 0 (-267)). Verified: run 45589864896, 136 pass / 0 fail. This issue stays open until one weekly snapshot rotation confirms the delta live on the panel, per the lane's done-check note. Refs #1224

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/mMedium: expected under 1 day of workepic/pm-stackReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/humanFiled directly by a humantask/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.