GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id: A9 five-minute path — scripted empty-directory-to-joinable-world run with elapsed time · Issue #12595 · developing-today/code

id: A9 five-minute path — scripted empty-directory-to-joinable-world run with elapsed time #12595

New issue
Copy link
New issue
Copy link
Done
#12750
Done
id: A9 five-minute path — scripted empty-directory-to-joinable-world run with elapsed time#12595
#12750
Copy link
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)source/agentCreated by an agent workerstatus:done

Description

@dezren39
dezren39
opened on Nov 22, 2026
Issue body actions

Problem

Phase 12 exit criterion 1 — "time from empty directory to a running world a friend can join: under 5 minutes, one command per step, documented" — has no measurement. The 2026-11-22 Phase 12 exit-audit re-run (see #12231) searched the tree and found no A9 path runner and no timed result; the criterion is unmeasured, and no open issue carried it (#796, which held the verification debt, is closed).

What to do

Per plan step A9 in planning/plans/2026-11-21_results-first.md: a script that runs the documented steps from an empty directory to a world a second node joins, and prints the elapsed time.

Done when

The script runs in the nightly and reports under 5 minutes, and the result is recorded where the Phase 12 exit audit (#12231) can cite it.


Filed by agent felix from the #12231 exit-audit re-run, 2026-11-22.

Activity

  1. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    source/agentCreated by an agent worker
    epic/id-programReprioritization program epic (2026-11-12)
    on Nov 22, 2026
  2. developing-today commented on Nov 22, 2026

    @developing-today
    developing-todayBot
    on Nov 22, 2026 – with developing.today
    Contributor
    More actions

    CODE-4633

  3. dezren39
    added a commit that references this issue on Nov 23, 2026

    feat(id): scripted five-minute path with elapsed time (#12595)

    d4f6925
  4. developing-today
    added
    status:in-review
    on Nov 23, 2026
  5. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    Progress (xaltha, 2026-11-22): the A9 runner is landed as PR #12750 (branch xaltha/12595-a9-five-minute-path).

    • pkgs/id/scripts/five-minute-path.sh runs the documented steps from an empty directory to a world a second node joins and prints the elapsed time with a PASS/FAIL verdict against the 300s budget (clone, release build, serve + readiness, invite, join with one observed server frame, records). README "Five-minute path" section documents the one-command-per-step path; an args-contract test is included.
    • No timed result yet: the end-to-end run needs a build host and the fleet shell leg is down this run (tailnet seat logged out; control plane 400s on register even with a fresh key — owner action needed), so no laptop run was possible and no time is claimed. The first real measurement will be recorded here once the shell leg is back.
    • Next: laptop timed run, then nightly wiring (A9 done-when) so the id: Phase 12 exit audit and the id/v0.12.0 tag #12231 audit can cite the result. This PR does not close this issue.
  6. dezren39
    added a commit that references this issue on Nov 24, 2026

    Merge pull request #12750 from developing-today/xaltha/12595-a9-five-…

    f54185c
  7. dezren39
    closed this as completedin #12750on Nov 24, 2026
  8. developing-today
    added
    status:done
    and removed
    status:in-review
    on Nov 24, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)source/agentCreated by an agent workerstatus:done

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.