GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — C4.4 — New model / plan arrival predictions (watch-based, honesty-first) · Issue #13260 · developing-today/code

C4.4 — New model / plan arrival predictions (watch-based, honesty-first) #13260

New issue
Copy link
New issue
Copy link
Open
Open
C4.4 — New model / plan arrival predictions (watch-based, honesty-first)#13260
Copy link
Labels
epic/pm-stackReprioritization program epic (2026-11-12)primary-parent/pm-stackPrimary parent epic pm-stack (design §3)status:in-reviewstray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)

Description

@dezren39
dezren39
opened on Nov 23, 2026
Issue body actions

Component of #9572 (C4 quota forecasting), per its design record (doc/2026-11-13T15-12-00Z_design_reporting-architecture-event-driven/c4-forecasting-design.md).

Scope: S2.3 second half — predictions of when new models/plans arrive. Evidence base is weak by nature: the inputs are the S5 plan-change detector's history (#12699: observed limit/plan changes), vendor release cadence where recorded, and pool composition facts from the pool review/steward jobs. Records of kind model_plan_arrival name their basis; no_basis is the expected common state and is a first-class published answer, not a failure.

Acceptance:

  • Arrival prediction records emitted only when a named basis exists; otherwise the pool/plan carries the explicit no_basis state.
  • Scored on hit/miss + lead time per the C4 design when arrivals occur.
  • No speculative dates: a record without a basis is never published.

Activity

  1. developing-today commented on Nov 23, 2026

    @developing-today
    developing-todayBot
    on Nov 23, 2026 – with developing.today
    Contributor
    More actions

    CODE-4835

  2. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: archer (kind muse), lane WE
    • Task: C4.4 — New model / plan arrival predictions (watch-based, honesty-first) #13260 C4.4 — new model / plan arrival predictions (watch-based, honesty-first). Served by the queue shortlist as a fresh unclaimed C4 slice.
    • Plan: land one bounded slice per the issue's acceptance — the honesty-first emission rule (arrival records only with a named basis; explicit no_basis state otherwise; no speculative dates ever published), with its test, following the existing C4 forecast/scoring shapes on main.
  3. developing-today
    added
    status:in-review
    on Nov 23, 2026
  4. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    🤖 Progress note — Lane WE (archer)

    PR #13299 is open with the first C4.4 slice: the model_plan_arrival record contract as a pure module (pm-stack/aggregator/src/quota-arrival.ts), per the C4 design record §1/§3/§7.

    • Emission rule (acceptance 1 + 3): one predicted record per named basis that can honestly bound a range — detector_history (this pool's S5 plan-change findings as arrival instants; ≥2 spread intervals bound the next arrival) and vendor_cadence (a cadence actually recorded, with measured spread). One interval, identical intervals, or a spread-less recorded period → insufficient_history; no evidence at all → the explicit no_basis state with every absence named. validateArrivalRecord enforces the contract and the builder validates every record it emits: a predicted record must name a real basis and a strictly bounded range (point dates refused); an honesty-state record carries no range at all — a record without a basis cannot be published, so no speculative date can leave the module.
    • Scoring (acceptance 2, mechanics): scoreArrivalPrediction — hit/miss plus lead time on hits; honesty states never scored; open predictions unscored, never assumed.
    • Verification: 20/20 new tests (oracle: the design record), tsc --noEmit clean, neighbouring quota suites green; full-suite comparison against the pre-change failure set is recorded on the PR.

    Remainder: the live wiring (gatherer tick → quota-predictions.jsonl + Turso mirror under source quota-prediction), first scored outcomes against live arrivals, and §4's calendar rendering form. This issue stays open on those.

  5. dezren39
    added a commit that references this issue on Nov 23, 2026

    Merge pull request #13299 from developing-today/lane-we-13260

    5c8e163
  6. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    🤖 Agent note · slice landed (lane WE)

    PR #13299 merged (5c8e163849d8), verified present on main. The model_plan_arrival record contract now exists as a pure module, pm-stack/aggregator/src/quota-arrival.ts:

    • Acceptance 1 + 3 — landed as executable rules. Arrival records are emitted only when a named basis exists (detector_history: the pool's S5 plan-change findings as arrival instants, ≥2 spread intervals bounding the next arrival; vendor_cadence: a cadence actually recorded, with measured spread). Otherwise the subject carries the explicit honesty state — insufficient_history when a basis has evidence that cannot bound a range (one interval, identical intervals, spread-less recorded period), no_basis when no basis has any evidence — with every reason named. validateArrivalRecord enforces the contract and the builder validates every record it emits: a predicted record must name a real basis and a strictly bounded range (point dates refused); an honesty-state record carries no range at all. No speculative date can leave the module.
    • Acceptance 2 — mechanics landed. scoreArrivalPrediction: hit/miss per record plus lead time on hits; honesty states are never scored; open predictions are unscored, never assumed.
    • Verification: new suite 20/20 (oracle: the C4 design record §1/§3/§7), tsc --noEmit clean, neighbouring quota suites (anomaly + forecast) 50/50. Full aggregator suite run twice: 3169 pass / 26 fail, then 3178 pass / 17 fail — the failing set varies between runs and is entirely pre-existing environment/timing flakes in areas this change does not touch (server-boot port 4871 collisions ×14, snapshot-lock concurrency, source-gate boot); the change adds two files that nothing else imports. §4 rendering: duration + day forms implemented and stored on the record.

    Remainder (this issue stays open): the live wiring — a gatherer tick emitting these records to quota-predictions.jsonl with the Turso mirror under source quota-prediction (constant exported from the module for exactly one spelling) — first scored outcomes against live arrivals, and §4's calendar rendering form (day names/dayparts).

  7. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    Triage verdict — oc-code-01, 2026-11-24 (queue task 22294)

    Fresh check against origin/main:

    • Contract and scoring: resolved. pm-stack/aggregator/src/quota-arrival.ts is merged (PR feat(pm-agg): C4.4 arrival prediction records — honesty-first emission, validation, scoring (#13260) #13299): the model_plan_arrival record contract, honesty-first emission, validation, and scoreArrivalPrediction. Design basis is PR doc(#9572): C4 quota forecasting design — prediction record, scoring, methodology log #13268.
    • Remaining (as the 2026-11-23 progress note records): the live wiring (gatherer tick writing quota-predictions.jsonl plus the Turso mirror under source quota-prediction), the first scored outcomes against live arrivals, and §4 calendar rendering (day names and dayparts).

    The live wiring is a scoped code slice. It is not filed as a new packet in this pass, because #13260 already carries the explicit remainder and the 2026-11-23 note names it. Recommend the next dispatch to take that slice on this issue.

    No code changed in this pass.

  8. developing-today-fleet commented on Nov 25, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 25, 2026 – with developing.today fleet
    Contributor
    More actions

    Re-verification — IW-346 lane, 2026-11-25 (queue task 23131)

    Fresh reads this pass:

    • The triage verdict for this issue is already recorded (oc-code-01, 2026-11-24, task 22294): the model_plan_arrival contract + scoring slice landed via PR feat(pm-agg): C4.4 arrival prediction records — honesty-first emission, validation, scoring (#13260) #13299 (merged 5c8e163849d8).
    • The remaining C4.4 work (watch-based arrival predictions) depends on the S5 plan-change detector, impl(quota-plane): stage-3 S5 — anomaly detectors: burn spike, adapter schema drift, vendor plan change #12699 — re-checked today: impl(quota-plane): stage-3 S5 — anomaly detectors: burn spike, adapter schema drift, vendor plan change #12699 is still OPEN, so the gate has not fired.
    • No competing claim or implementing PR for the remainder.

    Disposition: task 23131 is parked, not completed — its acceptance was discharged by the recorded verdict, and the follow-on implementation is dep-gated.

    Wake condition: #12699 closes (S5 plan-change detector lands). Then route the C4.4 prediction slice as a feature_slice packet. Timed recheck: 2026-12-02T12:00:00Z.

  9. developing-today-fleet
    added
    epic/pm-stackReprioritization program epic (2026-11-12)
    primary-parent/pm-stackPrimary parent epic pm-stack (design §3)
    stray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)
    on Nov 27, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    epic/pm-stackReprioritization program epic (2026-11-12)primary-parent/pm-stackPrimary parent epic pm-stack (design §3)status:in-reviewstray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.