GeezerVison is showing github.com — CEN-07 remainder: conformance fixtures for receipt, cursor and field ownership · Issue #15707 · developing-today/code

CEN-07 remainder: conformance fixtures for receipt, cursor and field ownership #15707

New issue
Copy link
New issue
Copy link
Todo
Todo
CEN-07 remainder: conformance fixtures for receipt, cursor and field ownership#15707
Copy link
Labels
effort/sSmall: expected under 2 hours of workepic/pm-stackReprioritization program epic (2026-11-12)meta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedprimary-parent/pm-stackPrimary parent epic pm-stack (design §3)priority/normalOrdinary priority (the default)status/triagedTriaged and routed (see agent note)stray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)

Description

@dezren39
dezren39
opened on Nov 26, 2026
Issue body actions

Refs #9437

The CEN-07 conformance suite landed for the command, acceptance, selector and authority.managed_section families (#15701). The rest waits on contracts that haven't landed yet:

  • receipt, once design(pm-orchestration): Idempotency identity and stable structured receipts #9513 lands
  • cursor, once design(pm-orchestration): Per-source incremental activity revisions and tombstones #9508 lands
  • authority.field_ownership, once design(pm-orchestration): Field ownership and scoped authorization contract #9429 lands

Each one already has a gated slot in pkgs/fleet/crates/fleet-queue/tests/fixtures/pmo-conformance/manifest.json. To finish a slot, add cases.json and a test in tests/pmo_contract_conformance.rs, set the family's status to landed, then list its tests.


Generated by Claude Code

Acceptance criteria

  • The problem stated in this issue ("CEN-07 remainder: conformance fixtures for receipt, cursor and field ownership") is verified against current main: reproduced, or confirmed absent with the evidence recorded on the issue.
  • A fix (or an explicit no-action verdict with evidence) is recorded on the issue; any code change lands via a PR that references this issue.
  • Relevant checks/tests for the touched area pass, or a failure is named on the issue with its own follow-up.
  • The issue closes only with a closing note naming the resolving PR/commit or the no-action evidence.

Activity

  1. developing-today-fleet
    added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    priority/normalOrdinary priority (the default)
    effort/sSmall: expected under 2 hours of work
    status/needs-triageNot yet triaged; needs a first look
    on Nov 26, 2026
  2. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    Intake review

    • Related / still-live check: merged PRs referencing CEN-07 remainder: conformance fixtures for receipt, cursor and field ownership #15707: none found in a title/body search. No merged PR was verified to explicitly resolve this issue, so it stays open. An acceptance-criteria section was appended to the body this pass.
    • Notes: Filed/refreshed recently; labels at intake: (none). Normalized this pass: added meta/enriched, priority/normal, effort/s, status/needs-triage.
    • Risks: Scope is bounded by the issue body; if verification shows the problem is already fixed on main, close with the evidence instead of opening new work.
    • Suggested approach: Verify against current main first, then route: small verified fix via the queue, or close with evidence if already resolved.

    🤖 Agent note · filed

    • Agent: fleet monitor
    • Session / ID: repo-fleet-monitor run 2026-11-26 13:14 CST
    • Found via: monitor reconciliation
    • Task: Intake enrichment (protocol §5) for issue CEN-07 remainder: conformance fixtures for receipt, cursor and field ownership #15707
    • Expectation: effort class effort/s; done = issue carries acceptance criteria, normalized labels, and this intake review
    • Links: CEN-07 remainder: conformance fixtures for receipt, cursor and field ownership #15707
  3. developing-today-fleet
    added a parent issue on Nov 26, 2026
    • design(pm-orchestration): Real-adapter conformance and CI adoption #9437
  4. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage verdict — real, still gated; no small fix now. The CEN-07 remainder is not resolved on current main. PR #15701 merged at 31787b4 and its conformance workflow run #45876442933 passed, but the main manifest still marks receipt, cursor, and authority.field_ownership as gated with empty test lists. The underlying tracker issues #9513, #9508, and #9429 remain open; their implementation prerequisites are also open (#9206/#9198/#9448 for receipt; #9507/#9502 for cursor; #9206/#9200/#9198 for field ownership).

    No new implementation packet is needed: existing follow-ons are task 16059 (receipt, queued but gate requires revalidation), 20407 (cursor, blocked), and 15924 (field ownership, blocked). Those tasks must re-check their gates before editing. Keep #15707 open as the remainder tracker; add the fixtures and tests named in its body only after the corresponding contract implementation lands. No code changed in this triage.

  5. developing-today-fleet
    added
    status/triagedTriaged and routed (see agent note)
    stray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)
    epic/pm-stackReprioritization program epic (2026-11-12)
    primary-parent/pm-stackPrimary parent epic pm-stack (design §3)
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Nov 26, 2026
  6. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    Follow-on task 24427 was automatically created by triage completion and is now dependency-blocked on existing implementation task 16059 as its first release trigger. When 16059 completes, the claiming lane must re-check tasks 20407 (cursor) and 15924 (field ownership) before adding only the newly unblocked fixtures. No parallel implementation packet was filed.

  7. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Lane code-j — CEN-07 remainder premise re-check, 2026-11-27 ~14:35Z. Handed #15707 by fleet agent next (shortlist rung).

    Gate re-verified fresh via gh: receipt #9513 OPEN (status/blocked, updated 02:48Z), cursor #9508 OPEN (status:in-review, updated 23:35Z), field_ownership #9429 OPEN (status/blocked, updated 11-25). All three contracts still unlanded — no conformance slot can be finished, no startable slice, no competing slice started, no code/branch/build changes this pickup. Follow-on routing already exists (triage task 24427, dependency-blocked on implementation task 16059). Standing down until a gate closes.

  8. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    agent-note:v1 · lane 1337-I (alpha DRIVE, 2026-11-27 13:37 CST) · fallback premise-check: stand-down, all three contract gates still unlanded.

    Read the issue + ALL comments firsthand. Fresh gate verification this run via gh:

    • receipt design(pm-orchestration): Idempotency identity and stable structured receipts #9513 OPEN, status/blocked + queue/blocked, updated 2026-11-27T15:55:44Z
    • cursor design(pm-orchestration): Per-source incremental activity revisions and tombstones #9508 OPEN, status:in-review, updated 2026-11-27T15:58:42Z
    • authority.field_ownership design(pm-orchestration): Field ownership and scoped authorization contract #9429 OPEN, status/blocked + queue/blocked, updated 2026-11-27T16:13:27Z

    Manifest on main (pkgs/fleet/crates/fleet-queue/tests/fixtures/pmo-conformance/manifest.json, read via Git-API contents route this run) still marks receipt, cursor and authority.field_ownership as status=gated with empty test lists — no conformance slot can be finished until its contract lands. This matches lane code-j's 2026-11-27T14:29Z re-check; no gate has moved since.

    No claim, no code change from this lane. Wake: any of #9513 / #9508 / #9429 lands → follow-on task 24427 (dependency-blocked on task 16059) re-checks the remaining gates and adds only the newly unblocked fixtures (cases.json + test in tests/pmo_contract_conformance.rs, family status to landed).

    Primary target #15114 was checked first by this lane and also stood down: its code criterion already landed (PR #15215 merged) and the remainder is a hands item (Drew re-login to dev.meta.ai in the laptop Helium profile; queue task 23879 parked interactive-login, re-verified by lane 1322-I at 2026-11-27T19:35:58Z).

  9. developing-today-fleet commented on Nov 28, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 28, 2026 – with developing.today fleet
    Contributor
    More actions

    Lane code-f premise re-check — 2026-11-28 ~04:35Z (shortlist, rank 5). Standing down, no code change.

    Fresh gate verification this run (gh CLI + origin/main manifest):

    • receipt design(pm-orchestration): Idempotency identity and stable structured receipts #9513 OPEN (status/blocked, queue/blocked; updated 2026-11-27T15:55:44Z)
    • cursor design(pm-orchestration): Per-source incremental activity revisions and tombstones #9508 OPEN (status:in-review; updated 2026-11-27T15:58:42Z)
    • authority.field_ownership design(pm-orchestration): Field ownership and scoped authorization contract #9429 OPEN (status/blocked, queue/blocked; updated 2026-11-27T16:13:27Z)
    • manifest on origin/main still marks receipt, cursor, authority.field_ownership as status=gated with empty test lists.

    Matches lanes code-j (2026-11-27T14:29Z) and 1337-I (2026-11-27T19:43Z): no conformance slot can be finished until its contract lands. Wake: any of #9513 / #9508 / #9429 lands -> follow-on task 24427 re-checks remaining gates. #15707 stays open as remainder tracker.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    effort/sSmall: expected under 2 hours of workepic/pm-stackReprioritization program epic (2026-11-12)meta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedprimary-parent/pm-stackPrimary parent epic pm-stack (design §3)priority/normalOrdinary priority (the default)status/triagedTriaged and routed (see agent note)stray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.