GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) · Issue #2056 · developing-today/code

epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056

New issue
Copy link
New issue
Copy link
Done
31 / 3531 of 35 issues completed
Done
epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15)#2056
31 / 3531 of 35 issues completed
Copy link
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)epic/id-platformEpic: id-platform - all issues of this effort carry itepic/id-programReprioritization program epic (2026-11-12)kind/enhancementmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/highImportant and time-sensitivequeue/queuedHas a queued queue tasksource/humanFiled directly by a humanstatus/triagedTriaged and routed (see agent note)task/triageQueue packet kind: verify, reproduce, and route this item
Milestone
ID platform program

Description

@dezren39
dezren39
opened on Oct 29, 2026
Issue body actions

Drew's 2026-10-28 directive, LIST 6–15: the ID platform expansion — core build, first apps, comms, currency, hosting, notes, chat, boards. Full text: hatch-personal memory/topics/id-program-2026-10-28.md. High priority; does not preempt in-flight work.

Children:

  • id: investigate: app packaging — apps as folders (code + resources), TUI/web interface parity, web-native specialization #2026 id: investigate: app packaging — apps as folders (code + resources), TUI/web interface parity, web-native specialization
  • id: investigate: capability-based specialization — forms, location, media across web, ESP32/MQTT, and text/audio modes #2027 id: investigate: capability-based specialization — forms, location, media across web, ESP32/MQTT, and text/audio modes
  • id: design: ID core build v1 — app model + capability system, enough to start app examples #2028 id: design: ID core build v1 — app model + capability system, enough to start app examples
  • id: investigate: did-it tracker data model — events, expectations, per-entity cardinality, details + later opinions #2029 id: investigate: did-it tracker data model — events, expectations, per-entity cardinality, details + later opinions
  • id: investigate: trust/visibility model — servers accept all signed objects; views count only allowed writers #2030 id: investigate: trust/visibility model — servers accept all signed objects; views count only allowed writers
  • id: design+PoC: sticky-notes / did-it tracker — the first ID app #2031 id: design+PoC: sticky-notes / did-it tracker — the first ID app
  • id: investigate: comms abuse controls — blocks, rate limits, and per-counterparty budgets #2032 id: investigate: comms abuse controls — blocks, rate limits, and per-counterparty budgets
  • id: design: abuse-control primitives v1 for ID comms #2033 id: design: abuse-control primitives v1 for ID comms
  • id: investigate: ephemeral live data vs the chained event graph — retention and intermittent signing #2034 id: investigate: ephemeral live data vs the chained event graph — retention and intermittent signing
  • id: investigate: multi-hop relay and P2P media paths — bridging peers, optional privacy relay, large-message chunking #2035 id: investigate: multi-hop relay and P2P media paths — bridging peers, optional privacy relay, large-message chunking
  • id: design: ID messaging/relay protocol v1 #2036 id: design: ID messaging/relay protocol v1
  • id: investigate: match-result attestation — mutual concession, witness adjudication, offline play #2037 id: investigate: match-result attestation — mutual concession, witness adjudication, offline play
  • id: investigate: match audit — netcode log format, replay validation, and cheating signals #2038 id: investigate: match audit — netcode log format, replay validation, and cheating signals
  • id: design: match attestation + audit v1 #2039 id: design: match attestation + audit v1
  • id: investigate: TigerBeetle — multi-currency ledgers, conversions, per-coin vs balance model, 3-node cluster topology #2040 id: investigate: TigerBeetle — multi-currency ledgers, conversions, per-coin vs balance model, 3-node cluster topology
  • id: investigate: token issuance in the ID graph — per-ID issuance, issuer snapshots, authorized conversion rates #2041 id: investigate: token issuance in the ID graph — per-ID issuance, issuer snapshots, authorized conversion rates
  • id: investigate: tokens for real services — Steam-key grants, returns/refunds, revocation #2042 id: investigate: tokens for real services — Steam-key grants, returns/refunds, revocation
  • id: design: ID currencies v1 #2043 id: design: ID currencies v1
  • id: investigate: Cloudflare Workers edition — isolates + Durable Objects + per-user SQLite fit for ID #2044 id: investigate: Cloudflare Workers edition — isolates + Durable Objects + per-user SQLite fit for ID
  • id: investigate: hosted data option — per-user stores, Google SSO, static/local-storage variants, container-spend limits #2045 id: investigate: hosted data option — per-user stores, Google SSO, static/local-storage variants, container-spend limits
  • id: design: ID serverless edition v1 (Cloudflare Workers) #2046 id: design: ID serverless edition v1 (Cloudflare Workers)
  • id: investigate: friendly-name references — @/# phrase resolution via cross-service search (zettelkasten / Mnote model) #2047 id: investigate: friendly-name references — @/# phrase resolution via cross-service search (zettelkasten / Mnote model)
  • id: design: Zettelkasten layer — multiplayer docs/wiki on ID #2048 id: design: Zettelkasten layer — multiplayer docs/wiki on ID
  • id: investigate: IRC-first chat on ID — channels, graph-linked objects, presence #2049 id: investigate: IRC-first chat on ID — channels, graph-linked objects, presence
  • id: investigate: BitTorrent-style chunk retrieval for graph objects #2050 id: investigate: BitTorrent-style chunk retrieval for graph objects
  • id: design: ID chat v1 #2051 id: design: ID chat v1
  • id: investigate: boards — a modern phpBB on ID identity: no registration, copyable themes #2052 id: investigate: boards — a modern phpBB on ID identity: no registration, copyable themes
  • id: investigate: embedded playable posts — HTML5 mini-games, async challenges, and forkable succession saves #2053 id: investigate: embedded playable posts — HTML5 mini-games, async challenges, and forkable succession saves
  • id: design: ID boards v1 #2054 id: design: ID boards v1

Program: Drew's 2026-10-28 directive (full text: hatch-personal memory/topics/id-program-2026-10-28.md).
Working pattern: parallel investigations, then the named synthesis issue merges them into a full design. Route guidance: Workhorse by default; Specialist/Summit for synthesis and ramification-heavy work. A result that says "done" is not the endpoint — the orchestrator reviews it and may commission another round. Deliverables: a markdown design/investigation doc (mermaid/SVG diagrams welcome) linked from this issue, plus follow-up issues for anything buildable. Build a proof of concept where the design calls for one, but do NOT build the permanent feature on top of an unreviewed PoC.

Acceptance criteria

  • Every child investigation/design issue in the program (LIST 6-15) reaches a written conclusion or a synthesis issue
  • The synthesis issues merge their investigations into v1 designs for core, chat, boards, hosting and currency
  • Children that stall are named on this epic with their blocker rather than sitting silently

Completion evidence (2026-11-26)

  • The dated census in PR #15514 records all original children id: investigate: app packaging — apps as folders (code + resources), TUI/web interface parity, web-native specialization #2026–id: design: ID boards v1 #2054 closed (29/29), all follow-on batch issues id: investigate: world-VM Wasm portability audit — what of the worlds runtime runs inside a Worker #2057–id: design: currency as the centralised exception — how the hosted (Workers) edition reaches the currency service #2066 closed (10/10), and the current live follow-ons from id: design: ID messaging/relay protocol v1 #2036.
  • id: design: ID messaging/relay protocol v1 #2036 and id: design: match attestation + audit v1 #2039 have review decisions recorded on their issues and are closed. The required v1 syntheses are merged.
  • Follow-on implementation/design issues id: implement ID messaging and relay protocol v1 (design #2036) #5534 and id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674 remain open and separately tracked; neither is waiting on an owner decision.

Sub-issues

Collapse Sub-issuesSub-issues

31 of 3531 of 35 Issues completed
Loading 35 sub-issues

Activity

Next
  1. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    epicMeta-issue grouping multiple items (org Project Type=Epic)
    on Oct 29, 2026
  2. developing-today commented on Oct 29, 2026

    @developing-today
    developing-todayBot
    on Oct 29, 2026 – with developing.today
    Contributor
    More actions

    CODE-977

  3. dezren39
    added a commit that references this issue on Oct 29, 2026

    docs(id): 2026-10-28 program investigations — TigerBeetle + Cloudflar…

    8bbefca
  4. dezren39 commented on Oct 29, 2026

    @dezren39
    dezren39
    on Oct 29, 2026
    MemberAuthor
    More actions

    Dispatch intent (orchestrator note, 2026-10-28): enqueue children as normal fleet work. Investigations run on Workhorse; synthesis/design issues (#2028, #2031, #2033, #2036, #2039, #2043, #2046, #2048, #2051, #2054, #2062, #2063, #2066) are gated on their named investigations and go to Specialist/Summit-grade routes when their inputs land. ALREADY DONE — do not redo: #2040 (TigerBeetle) and #2044 (Cloudflare fit) investigations are complete; reports are in PR #2067 and summaries are commented on both issues. Follow-on batch already filed: #2057–#2066 (Workers follow-ons + currency control plane/conversion engine/topology/refundable grants). PoCs (#2031 sticky-notes) must not become permanent features without a review round. Full program text: hatch-personal memory/topics/id-program-2026-10-28.md.

  5. dezren39
    added
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    kind/enhancement
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    meta/epicEpic / bundle of related work
    priority/highImportant and time-sensitive
    source/humanFiled directly by a human
    status/needs-triageNot yet triaged; needs a first look
    on Oct 29, 2026
  6. dezren39 commented on Oct 29, 2026

    @dezren39
    dezren39
    on Oct 29, 2026
    MemberAuthor
    More actions

    Intake review

    Umbrella epic for Drew's 2026-10-28 directive, LIST 6-15 (full text in hatch-personal memory/topics/id-program-2026-10-28.md); the body states the program is high priority and does not preempt in-flight work. Not resolvable by a single PR — closure is by child completion. Intake note: several children (#2059-#2073) were enriched in the previous monitor run; this pass covers the remaining #2051-#2058 batch. Risk: epic drift — the fleet's standing rule is that anything blocked surfaces rather than sitting silently.

    — repo-fleet-monitor intake enrichment (protocol §5): acceptance criteria appended to the body where missing, labels normalized, meta/enriched applied.

  7. github-actions
    assigned
    dezren39
    on Oct 29, 2026
  8. dezren39 commented on Oct 29, 2026

    @dezren39
    dezren39
    on Oct 29, 2026
    MemberAuthor
    More actions

    Wave-1 enqueued at top priority (2026-10-29). The ID-side wave-1 investigations/designs from this epic — #2026, #2027, #2029, #2030, #2032, #2034, #2035, #2037, #2038, #2041, #2042, #2045, #2047, #2050, #2052, #2053, plus batch-2 #2057–#2066 — are enqueued as triage tasks 3343–3368 in repo-health-code-pilot at queue priority 20, after the producers did not convert them. Already done: #2040, #2044. Syntheses and PoCs (#2028, #2031, #2033, #2036, #2039, #2043, #2046, #2048, #2051, #2054) stay gated on their named inputs.

  9. 121 remaining items

  10. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Stand-down — OpenChamber lane oc-code-05, served from the priority rung (2026-11-24). Freshly verified the epic’s remaining children are #2036 and #2039, whose synthesis deliverables are complete and which await the existing design-review/orchestrator round. The live implementation slice retention is already in flight as PR #14796; not duplicated. No unowned lane-actionable slice on this umbrella; no branch or PR from this serve. Returning to lane intake.

  11. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Stand-down — OpenChamber lane oc-code-05, served 2026-11-24. Freshly verified the epic's remaining children are #2036 and #2039, whose synthesis deliverables are complete and which await the existing design-review/orchestrator round. The live implementation slice id compact retention is already in flight as PR #14796; not duplicated. No unowned lane-actionable slice on this umbrella; no branch or PR from this serve. Returning to lane intake.

  12. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    agent-note:v1
    state: progress (fresh child map, lane xaltha, hourly work-loop 2026-11-25)

    Fresh child map for epic #2056 — verified this shift against live issue state

    Named children #2026–#2054: 27 closed, 2 open (was 20 closed / 9 open at the 2026-11-03 triage map). Follow-on batch #2057–#2066: 10/10 closed.

    Closed since the 2026-11-03 map: #2031 (sticky-notes PoC), #2042 (tokens for real services), #2043 (currencies v1), #2045 (hosted data), #2047 (friendly-name references), #2048 (Zettelkasten), #2054 (boards v1).

    Still open (2), with blockers named per acceptance criterion 3:

    • id: design: ID messaging/relay protocol v1 #2036 — ID messaging/relay protocol v1: its own synthesis deliverable is complete (design doc merged via PR design(id): #2036 messaging/relay protocol v1 #3833; all four phase issues id: protocol v1 phase 1 — session header + segment checkpoint event kind (#2036) #3794–id: protocol v1 phase 4 — retention and compaction for the event store (#2036) #3797 closed; PoC PR test(id-sync): five-node bridge-relay PoC for #2249 #13454 merged 2026-11-23). It stays open as the parent tracker. Live remainder routes, both already claimed/in flight by other lanes — not duplicated here: id: implement ID messaging and relay protocol v1 (design #2036) #5534 (implement protocol v1, status:in-review; serve wiring landed in PR feat(id): serve graph-gated chained relay ALPN #14030, fan-out to discovered peers is open PR id serve: fan relay frames out to discovered peers #14242) and id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674 (wire format / transport adapters, status:triaged parent design).
    • id: design: match attestation + audit v1 #2039 — match attestation + audit v1: synthesis deliverable complete (design PR design(id): #2039 match attestation + audit v1 #3807 merged 2026-11-02; decomposition children id: player-signed move capture for world games — prerequisite for match attestation (#2037/#2039) #2814, id: determinism proof — replay harness over the world clock, cross-machine checkpoint hashes (from #2039) #3791, id: match attestation v1 — signed result objects, state machine, counting views in pkgs/id (from #2039) #3792, id: match audit v0 — netcode log format + tic-tac-toe exporter + verifier CLI (L0-L2) (from #2039) #3793 all closed). It stays open only for the orchestrator/Drew design-review round — a genuine owner-review remainder, not a lane-actionable slice.

    Verdict

    Epic stays OPEN as tracker (closure is by child completion). Acceptance criterion 1 is near-complete (27/29 named + 10/10 follow-ons concluded); the synthesis criterion is met in substance for all ten designs — eight synthesis issues closed, and #2036/#2039 deliverable-complete above. No new PR from this lane: the only remaining code route (#5534 fan-out) already has an open PR (#14242) from another lane, and #2039's remainder is the design review. No duplicate issues filed.

  13. developing-today-fleet commented on Nov 25, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 25, 2026 – with developing.today fleet
    Contributor
    More actions

    agent-note:v1
    event: epic status pass — open children named with their blockers (acceptance criterion 3)
    by: agent felix (kind muse, Muse sandbox seat; drawn via fleet agent next, priority rung, 2026-11-25 ~04:05 CST)

    Fresh census this pass: 27 of 29 children CLOSED. The two still open, with exactly what each waits on:

    • id: design: ID messaging/relay protocol v1 #2036 (design: ID messaging/relay protocol v1) — the design deliverable is complete (PR design(id): #2036 messaging/relay protocol v1 #3833) and all four phase issues (id: protocol v1 phase 1 — session header + segment checkpoint event kind (#2036) #3794–id: protocol v1 phase 4 — retention and compaction for the event store (#2036) #3797) are closed; the companion PoC PR test(id-sync): five-node bridge-relay PoC for #2249 #13454 merged 2026-11-23. It stays open as the design parent. Its implementation remainder is routed and owned elsewhere: id: implement ID messaging and relay protocol v1 (design #2036) #5534 (implement protocol v1 — OPEN, status:in-review, slices in flight) and id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674 (wire-format design — OPEN, status/triaged, not yet claimed). Nothing is stalled silently; no new routing needed from the epic.
    • id: design: match attestation + audit v1 #2039 (design: match attestation + audit v1) — synthesis delivered (PR design(id): #2039 match attestation + audit v1 #3807, design doc/2026-11-01_design_id2039.md); all decomposition children closed. Slice 1 (upgrade the design to the 9-point sufficient-design standard) is landed as PR design(#2039): upgrade match attestation + audit v1 to 9-point standard #14974, OPEN and awaiting review/merge. Blocker: that merge — the design's own phasing splits implementation slices only after it lands, so the next step is Felix's review of PR design(#2039): upgrade match attestation + audit v1 to 9-point standard #14974, not new lane work.

    Epic acceptance: criterion 1 (every child at a written conclusion or synthesis) is met in substance for 27 children and for the 2 design parents via their landed designs; criterion 2's syntheses exist for core, messaging, match, currencies, hosting, chat, and boards. The epic stays open until #2036's and #2039's remainders (#5534/#5674, PR #14974) resolve.

    No claim taken, no changes made. This lane draws again.

  14. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Progress (lane xaltha, 2026-11-25): slice landed as PR #15164 — doc/2026-11-25_epic_2056_child_map_trueup.md, a fresh child-map true-up.

    Measured: named children #2026–#2054 are now 27/29 CLOSED (was 20/29 at the 2026-11-03 triage); follow-ons #2057–#2066 remain 10/10 closed; all five v1 syntheses (core #2028, chat #2051, boards #2054, serverless #2046, currencies #2043) are closed. Closed since 2026-11-03: #2031, #2042, #2043, #2045, #2047, #2048, #2054.

    The two remaining open children, named per the epic's acceptance criteria:

    • id: design: ID messaging/relay protocol v1 #2036 — design deliverable complete (PR design(id): #2036 messaging/relay protocol v1 #3833), phases id: protocol v1 phase 1 — session header + segment checkpoint event kind (#2036) #3794–id: protocol v1 phase 4 — retention and compaction for the event store (#2036) #3797 closed, PoC PR test(id-sync): five-node bridge-relay PoC for #2249 #13454 merged; stays open as parent tracker; live remainder in id: implement ID messaging and relay protocol v1 (design #2036) #5534 and id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674.
    • id: design: match attestation + audit v1 #2039 — actively claimed today by another lane (slice 1 merged as PR design(#2039): upgrade match attestation + audit v1 to 9-point standard #14974 on 2026-11-25); not duplicated here.

    No child is blocked on an owner decision. Epic stays open as tracker until #2036/#2039 close. Remote verification for the docs slice dispatched via fleet-command run 45657788626 (in progress at posting time); PR CI is the other check.

  15. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Verification update (xaltha lane, 2026-11-25): PR #15164's remote verification run 45657788626 (fleet-command, developing-today/fleet) completed with conclusion success (created 2026-11-25T16:47:47Z, completed 16:57:37Z). Metadata only — no CI logs read. The docs-only child-map true-up in PR #15164 is verified-green.

  16. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Lane check — xaltha hourly loop 2026-11-25 ~13:50 CST

    🤖 Agent note · verified — no new slice started (would duplicate in-flight work)

    • Agent: xaltha
    • Found via: fleet agent next priority rung (first draw World surface renders only 1 row in a real browser: host crops the program screen to a 1-row session viewport #15170 was already claimed by the felix lane — root cause posted, branch felix/15170-world-viewport — so this epic was the second draw)

    Fresh claim-check evidence for #2056:

    • The epic's current measurable slice is already PR'd by this seat today: PR docs(id): epic #2056 child-map true-up — 27/29 named children closed #15164 (open, branch xaltha/2056-epic-trueup) — child-map true-up: named children id: investigate: app packaging — apps as folders (code + resources), TUI/web interface parity, web-native specialization #2026–id: design: ID boards v1 #2054 at 27/29 closed, follow-on batch id: investigate: world-VM Wasm portability audit — what of the worlds runtime runs inside a Worker #2057–id: design: currency as the centralised exception — how the hosted (Workers) edition reaches the currency service #2066 at 10/10 closed, all five v1 syntheses closed. That satisfies the "children named rather than sitting silently" criterion for this round.
    • Remaining open children are claimed/tracked elsewhere, not idle:
      • id: design: match attestation + audit v1 #2039 — actively claimed by lane oc-code-07; slice 1 merged as PR design(#2039): upgrade match attestation + audit v1 to 9-point standard #14974 on 2026-11-25, implementation-slice split proceeding with that lane.
      • id: design: ID messaging/relay protocol v1 #2036 — design complete; stays open as parent tracker, live remainder in id: implement ID messaging and relay protocol v1 (design #2036) #5534 (felix slices landed, e.g. PR feat(id): serve graph-gated chained relay ALPN #14030 merged) and id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674 (second-pass triage 2026-11-24: triage of record holds, no new packet).
    • No unclaimed, un-PR'd narrow slice remains on this epic right now; opening another true-up or touching id: design: match attestation + audit v1 #2039/id: design: ID messaging/relay protocol v1 #2036 remainders would duplicate live lanes. Next draw should come from fleet agent next once docs(id): epic #2056 child-map true-up — 27/29 named children closed #15164 merges or a remainder lane releases its claim.

    Legs at check time: bridge ✓, github ✓ (pooled), queue ✗ / shell ✗ (laptop broker tunnel EAGAIN, incident #15131 — known flapping).

  17. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    agent-note:v1
    state: already_in_flight — no duplicate slice started (xaltha hourly lane, 2026-11-25 ~19:20 CST)

    Fresh verification this run:

    • PR docs(id): epic #2056 child-map true-up — 27/29 named children closed #15164 (xaltha/2056-epic-trueup, OPEN) already carries this epic's current slice: child-map true-up, 27/29 named children id: investigate: app packaging — apps as folders (code + resources), TUI/web interface parity, web-native specialization #2026–id: design: ID boards v1 #2054 closed, follow-ons id: investigate: world-VM Wasm portability audit — what of the worlds runtime runs inside a Worker #2057–id: design: currency as the centralised exception — how the hosted (Workers) edition reaches the currency service #2066 10/10 closed, all five v1 syntheses closed.
    • Remaining open children verified by direct API read today: only id: design: ID messaging/relay protocol v1 #2036 and id: design: match attestation + audit v1 #2039.
      • id: design: match attestation + audit v1 #2039: actively claimed — slice 1 merged as PR design(#2039): upgrade match attestation + audit v1 to 9-point standard #14974 (2026-11-25) and PR feat(id): attestation reducer v1 and frozen audit-report schema (#2039 phase 4) #15319 (lane5/2039-attestation-reducer) is open. Not duplicated.
      • id: design: ID messaging/relay protocol v1 #2036: design deliverable complete (PR design(id): #2036 messaging/relay protocol v1 #3833), PoC PR test(id-sync): five-node bridge-relay PoC for #2249 #13454 merged; stays open as parent tracker, live remainder in id: implement ID messaging and relay protocol v1 (design #2036) #5534 (status:in-review) and id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674.
    • Legs this run: bridge ✓, github ✓ (pooled fleet gh), queue ✗ / shell ✗ (laptop broker tunnel EAGAIN, known flapping).

    No new PR opened for #2056 this run to avoid duplicating #15164 / the #2039 lane. Epic stays open as tracker pending #2036/#2039 closure.

  18. dezren39
    added a commit that references this issue on Nov 26, 2026

    feat(id): end each note session with one changelog entry naming its c…

    2b08638
  19. developing-today-fleet
    added a commit that references this issue on Nov 26, 2026

    Merge pull request #15164 from developing-today/xaltha/2056-epic-trueup

    c35c31a
  20. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Progress (agent-next-22-local): updated child-map PR #15514 records the fresh 29/29 closed state for original children #2026–#2054 and 10/10 for follow-ons #2057–#2066. The review decisions closing #2036 and #2039 are recorded on those issues. Live continuation work remains visible as #5534 (implementation, in review) and #5674 (wire-format design, triaged).

  21. dezren39
    added a commit that references this issue on Nov 26, 2026

    Merge pull request #15514 from developing-today/agent-next-22-local/2…

    8cd7429
  22. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Decided: Close #2056 as complete against its three acceptance criteria.
    Why: The merged census in PR #15514 confirms all 29 original children and all 10 follow-on batch issues are closed; all required v1 syntheses are merged; and the two previously open design children #2036 and #2039 now have review decisions and closed states. The only continuing work is separately tracked in #5534 (implementation) and #5674 (wire-format expansion); both are named on the epic and neither waits on an owner decision.
    Undo: Reopen #2056 if a named original child lacks a written conclusion, a required synthesis is missing, or a stalled follow-on is no longer visibly tracked with its current state.
    By: agent-next-22-local

  23. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Closed as implemented.

  24. dezren39
    closed this as completedon Nov 26, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)epic/id-platformEpic: id-platform - all issues of this effort carry itepic/id-programReprioritization program epic (2026-11-12)kind/enhancementmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/highImportant and time-sensitivequeue/queuedHas a queued queue tasksource/humanFiled directly by a humanstatus/triagedTriaged and routed (see agent note)task/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Milestone

      • ID platform programNo due date

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.