GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — aggregator: derive epic ETA bands and explainable stall risk · Issue #3982 · developing-today/code

aggregator: derive epic ETA bands and explainable stall risk #3982

New issue
Copy link
New issue
Copy link
Closed
Closed
aggregator: derive epic ETA bands and explainable stall risk#3982
Copy link
Assignees
dezren39
Labels
app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/mMedium: expected under 1 day of workkind/featureNew feature or capability requestpriority/normalOrdinary priority (the default)source/queue-workerFiled or worked by the queue/worker pilottask/triageQueue packet kind: verify, reproduce, and route this item

Description

@dezren39
dezren39
opened on Nov 1, 2026
Issue body actions

Parent chain: #1184 → #1256 → this issue. GitHub currently caps #1184 at 100 direct sub-issues and rejects additional links (REST 422), so implementation slices are nested under #1256, already a native child of #1184; no existing parent links were changed.

Design context: #1256; doc/2026-11-01T21-07-00Z_design_pm-stack_forecasting/2026-11-01T21-07-00Z_design_pm-stack_forecasting.md (§1, §3). Depends on the reusable item-history source in #3981. Coordinate with #1281: reuse its history/throughput seam, but do not duplicate its charts.

Goal

Add pure, deterministic derivations for project/epic ETA distributions and item stall-risk explanations. The current project/coverage inputs do not contain enough item-level history to calculate these values.

Acceptance criteria

  • ETA uses complete observed weekly item-history buckets, including zero-completion weeks, over trailing 4-week and 8-week windows; incomplete windows are excluded and the scope/sample are returned.
  • One direct native child closure is the documented default unit; merged PRs do not double-count. Reopened issues are not counted as currently complete. Existing effort weights and open-ended/unsized work remain explicit and never create invented precision.
  • With fewer than 3 completions or 4 complete weeks, the result is low-confidence/borrowed from a clearly named comparable scope or “not enough history”; with no defensible baseline, no ETA date is returned. Numeric forecasts include P50/P80 ranges, confidence, input coverage, and model version.
  • Stall risk is a versioned, explainable 0–100 rule score with contributing reason codes/timestamps; first-observed blocker age is labelled a lower bound, and unavailable heartbeat/requeue signals stay unknown.
  • Score ≥60 is surfaced as informational “at risk”; score alone does not create a Needs-you escalation. Tests cover missing history, zero pace, reopen, sparse samples, borrowed baseline, and each risk signal.

Activity

Next
  1. dezren39
    added
    kind/featureNew feature or capability request
    status/needs-triageNot yet triaged; needs a first look
    source/queue-workerFiled or worked by the queue/worker pilot
    priority/normalOrdinary priority (the default)
    effort/mMedium: expected under 1 day of work
    app/pm-stackpm-stack (Pad/Grist) in developing-today/code
    on Nov 1, 2026
  2. dezren39
    added a parent issue on Nov 1, 2026
    • design(pm-stack): forecasting — epic ETAs from measured velocity, quota-wall prediction, and stall-risk scoring #1256
  3. github-actions
    assigned
    dezren39
    on Nov 1, 2026
  4. dezren39
    added
    queue/queuedHas a queued queue task
    task/triageQueue packet kind: verify, reproduce, and route this item
    on Nov 3, 2026
  5. developing-today commented on Nov 3, 2026

    @developing-today
    developing-todayBot
    on Nov 3, 2026 – with developing.today
    Contributor
    More actions

    agent-note:v1
    state: triaged (coverage pass)
    Coverage pass 2026-11-03: reviewed in the fleet-wide per-issue pass (drift / overlap / already-handled / stale / blockers / ordering). Verdict: still live; queued in repo-health-code-pilot as triage at priority 40 (priority/normal). If this is already handled at current main, the triage closes it with evidence; if it needs splitting, the triage files the split.
    Found via: coverage pass 2026-11-03

  6. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    queue/queuedHas a queued queue task
    on Nov 3, 2026
  7. 65 remaining items

  8. dezren39
    added
    status/parkedDeliberately paused with a recorded resume condition
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 4, 2026
  9. dezren39 commented on Nov 4, 2026

    @dezren39
    dezren39
    on Nov 4, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: queue worker (repo-worker-code), lane code-e
    • Session / ID: task 8962
    • Found via: queue claim
    • Task: task 8962 for issue aggregator: derive epic ETA bands and explainable stall risk #3982 (small_fix) — execution lane assigned direct; this lane works it per the runbook
    • Expectation: work proceeds in checkpoints to a verified terminal state (complete / park / block)
    • Links: issue aggregator: derive epic ETA bands and explainable stall risk #3982
  10. dezren39
    added a commit that references this issue on Nov 4, 2026

    aggregator(forecast): compare as-of timestamps as instants, not strin…

    e10e253
  11. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    on Nov 4, 2026
  12. dezren39 commented on Nov 4, 2026

    @dezren39
    dezren39
    on Nov 4, 2026
    MemberAuthor
    More actions

    🤖 Agent note · parked — CI pending

    • Agent: queue worker (repo-worker-code), lane code-e
    • Session / ID: task 8962
    • Found via: queue claim (resume of parked task; PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236 @40ed243f2, stage awaiting_ci)
    • Task: all 5 Codex findings on PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236 dispositioned — findings 1–4 were already fixed in 40ed243 with tests (replies posted on each thread); round-2 finding (forecast.ts:155, as-of string compare) fixed in e10e253 with 3 new regression tests. bun test forecast-3982 on the laptop: 23 pass, 0 fail. New head e10e253 pushed.
    • Park: CI on PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236 (contract corpus; aggregator tests and typecheck) still QUEUED after a 5-minute poll — task 8962 parked 20 minutes. Resume: if checks green, merge PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236 and close issue aggregator: derive epic ETA bands and explainable stall risk #3982; if red, fix on branch queue/8962-3982-epic-eta.
    • Links: issue aggregator: derive epic ETA bands and explainable stall risk #3982, PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236
  13. dezren39
    added 2 commits that reference this issue on Nov 4, 2026

    aggregator(forecast): bound blocker age to effective asOf; unknown re…

    ee57a97

    Merge pull request #5236 from developing-today/queue/8962-3982-epic-eta

    eb36246
  14. dezren39 commented on Nov 4, 2026

    @dezren39
    dezren39
    on Nov 4, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done

    • Agent: queue worker (repo-worker-code), lane code-a
    • Session / ID: task 8962
    • Result: fixed_merged — PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236 merged as eb36246. Closing issue aggregator: derive epic ETA bands and explainable stall risk #3982 on the merge evidence (the PR did not auto-close it).
    • Resume work this shift: revalidated PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236 at head e10e253; found two undispositioned Codex round-3 P2 findings and fixed them in ee57a97 (blocker-age history bounded to the effective asOf; explicitly requested children absent from the latest complete cutoff are now reported as state-unknown scope limitations and block the nothing-left completion branch), with regression tests and replies on both threads. Codex round-4 P2 (resampling estimator per design §1) dispositioned on its thread as a model change and filed as follow-up issue aggregator(forecast): resampling estimator for epic ETA (design §1) — zero-median bursty buckets return no_measurable_pace #5274.
    • Tests: bun test test/forecast-3982.test.ts on the laptop — 25 pass, 0 fail. Full aggregator suite: 1486 pass; the only failures are alerts/notifications suites failing to resolve the web-push package because this worktree has no node_modules install (empty directory) — pre-existing/environmental, disjoint from this diff (forecast.ts + its test only).
    • Links: task 8962 · issue aggregator: derive epic ETA bands and explainable stall risk #3982 · PR aggregator(forecast): derive epic ETA bands and explainable stall risk (#3982) #5236 · follow-up issue aggregator(forecast): resampling estimator for epic ETA (design §1) — zero-median bursty buckets return no_measurable_pace #5274
  15. dezren39
    closed this as completedon Nov 4, 2026
  16. dezren39
    removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    work/assignedQueue worker lifecycle state
    on Nov 4, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/mMedium: expected under 1 day of workkind/featureNew feature or capability requestpriority/normalOrdinary priority (the default)source/queue-workerFiled or worked by the queue/worker pilottask/triageQueue packet kind: verify, reproduce, and route this item

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.