GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes · Issue #6046 · developing-today/code

design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes #6046

New issue
Copy link
New issue
Copy link
Closed
#7656
Closed
design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes#6046
#7656
Copy link
Assignees
dezren39
Labels
area/infraInfrastructure, deployment, and operationsepic/atlas-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted tests
Milestone
Atlas program

Description

@dezren39
dezren39
opened on Nov 5, 2026
Issue body actions

Parent: #6027 (retrieval statistics, feedback, query traces). Research source: prior-art doc ~/workspace/scratch/atlas-ingestion-brief-2026-11-04/prior-art-research.md (2026-11-04). Follow-up 24 (Cluster 4). Related: the SPLADE eval harness #5741 (signal-specific; this is the corpus-wide gate).

Finding (research, in substance)

The standard operating pattern for retrieval evolution is a versioned golden set (50–200 real queries) run on every index/config change with merge gates on thresholds (RAGAS-style reference-free metrics: faithfulness, answer relevancy, context precision/recall; the TruLens RAG triad). The builder's fuel is feedback: practitioner consensus is that negative-feedback queries get promoted into the evaluation set with corrected ground truth — "when users flag incorrect responses, add those queries to your evaluation set" is the standard loop. For Atlas the golden set converts feedback + traces into decisions: chunking changes, rescore weights (the #5774 parameter surface), and SPLADE/Jaccard experiments all become "did the golden set move" questions instead of vibes.

Scope

  • Builder: thumbs-down + sampled queries → candidate eval entries with corrected expected results; human/agent confirmation step; versioning of the set itself.
  • Eval gate: which changes must run it (chunking policy, rescore weights, embedding model, fan-out config), which metrics, what delta blocks a change.
  • Maintenance: stale entries (corpus moved on) — retire/repair rules so the gate doesn't fossilize.

Done looks like

A builder + gate design: set schema, promotion flow from feedback, gate contract per change class.

Activity

Next
  1. dezren39
    added
    area/infraInfrastructure, deployment, and operations
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    on Nov 5, 2026
  2. developing-today commented on Nov 5, 2026

    @developing-today
    developing-todayBot
    on Nov 5, 2026 – with developing.today
    Contributor
    More actions

    CODE-1711

  3. dezren39
    added
    queue/queuedHas a queued queue task
    task/triageQueue packet kind: verify, reproduce, and route this item
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    queue/queuedHas a queued queue task
    on Nov 5, 2026
  4. dezren39 commented on Nov 5, 2026

    @dezren39
    dezren39
    on Nov 5, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done (triage)

    • Agent: queue worker (repo-worker-code), lane code-k
    • Session / ID: task 10412
    • Found via: queue claim
    • Task: Triage issue design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes #6046 (design(atlas): golden-set builder + eval gate)
    • Expectation: design ticket; triage done = scope, inputs, ordering and blockers recorded below
    • Links: parent issue design(atlas): retrieval statistics, result feedback, and query traces — top-K survival, thumbs + essays, per-stage scores #6027 (OPEN); related issue Atlas search: SPLADE investigation — third retrieval signal, eval harness, query-adaptive weighting #5741, issue atlas search: query-time parameter surface — every retrieval knob as a CLI flag / raw-query field, no hardcoded constants (extends #5741, #5668) #5774 (both OPEN)

    Triage findings (verified fresh 2026-11-05 via gh + local source check):

    • Issue design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes #6046 is OPEN. Labels: task/triage, queue/queued, area/infra, kind/design. No hard-stop labels (held, user/owned, do-not-merge, do-not-auto-edit) and no user/review / user/escalated. Only comment is an automated Kaneo cross-link. The research source named in the body (~/workspace/scratch/atlas-ingestion-brief-2026-11-04/prior-art-research.md) is present on the sandbox today.
    • What the design must deliver ("done looks like" in the body): a builder + gate design — golden-set schema, the promotion flow from feedback, and a gate contract per change class.
    • Scope split (from the body): (1) Builder — thumbs-down + sampled queries become candidate eval entries with corrected expected results, a human/agent confirmation step, and versioning of the set itself (target size per the research: 50–200 real queries). (2) Eval gate — which change classes must run it (chunking policy, rescore weights, embedding model, fan-out config), which metrics (RAGAS-style / RAG triad named in the research), and what delta blocks a change. (3) Maintenance — retire/repair rules for stale entries so the gate does not fossilize as the corpus moves.
    • Key distinction from the sibling harness: issue Atlas search: SPLADE investigation — third retrieval signal, eval harness, query-adaptive weighting #5741 (SPLADE eval harness, handed off to the opencode claimant earlier today as task 10153) is signal-specific; this ticket is the corpus-wide gate. The two must share the golden set rather than grow separate eval corpora — the design here owns the set and the gate; issue Atlas search: SPLADE investigation — third retrieval signal, eval harness, query-adaptive weighting #5741's harness is one consumer.
    • Ordering / dependencies: the builder's fuel is the feedback + query-trace capture designed in the parent, issue design(atlas): retrieval statistics, result feedback, and query traces — top-K survival, thumbs + essays, per-stage scores #6027 (OPEN) — the promotion flow cannot be finalized before the parent settles what feedback/traces are recorded, though the set schema and gate contract can be drafted against it now with assumptions stated. One named gated change class (rescore weights) is the parameter surface of issue atlas search: query-time parameter surface — every retrieval knob as a CLI flag / raw-query field, no hardcoded constants (extends #5741, #5668) #5774 (OPEN); the gate contract should reference that surface rather than redefine the knobs.
    • Oracle note: the golden set is this system's test oracle — per the repo testing doctrine, the design should name it as such (versioned set + threshold deltas as the decision procedure for index changes), which is exactly what turns chunking/weight/SPLADE experiments into measurable questions.
    • Blockers: none external, no Drew decision needed to draft. No implementation is scoped by this triage.

    Triage complete for task 10412; issue #6046 stays open for the builder + gate design.

  5. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 5, 2026
  6. github-actions
    assigned
    dezren39
    on Nov 5, 2026
  7. dezren39
    added
    queue/claimedQueue worker lifecycle state
    on Nov 8, 2026
  8. 16 remaining items

  9. dezren39
    removed
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 8, 2026
  10. developing-today
    added
    status:in-review
    on Nov 8, 2026
  11. dezren39 commented on Nov 8, 2026

    @dezren39
    dezren39
    on Nov 8, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done

    • Agent: queue worker (repo-worker-code), lane code-t
    • Session / ID: task 13056
    • Found via: queue claim (resumed from the previous holder's implementation_complete checkpoint)
    • Task: task 13056 completed with outcome pr_opened. The design record for issue design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes #6046 (golden-set builder + eval gate: builder schema, feedback promotion flow, gate contract, maintenance lifecycle) was already implemented and pushed by the previous holder (branch queue/13056-6046-atlas-golden-set-eval-gate at 11c0128, single doc +273 lines); only the PR creation was blocked by the secondary rate limit. Lane code-t verified the branch and commit fresh, confirmed no PR existed, reviewed the record against the task scope, and opened PR docs(atlas): golden-set builder + eval gate design record (#6046) #7656.
    • Expectation: PR docs(atlas): golden-set builder + eval gate design record (#6046) #7656 carries a closing keyword for issue design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes #6046; merge follows its checks.
    • Links: PR docs(atlas): golden-set builder + eval gate design record (#6046) #7656 · issue design(atlas): golden-set builder + eval gate — feedback-derived versioned eval set gating index changes #6046
  12. dezren39
    added
    epic/atlas-programReprioritization program epic (2026-11-12)
    and removed
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    work/assignedQueue worker lifecycle state
    on Nov 8, 2026
  13. dezren39
    added this to the Atlas program milestone on Nov 12, 2026
  14. dezren39
    added a parent issue on Nov 12, 2026
    • epic: Atlas program — unified search and memory index over every corpus #8983
  15. dezren39
    added 2 commits that reference this issue on Nov 16, 2026

    docs(atlas): pin raw corpus, per-stack index builds, span-mapped qrel…

    73bee4c

    Merge pull request #7656 from developing-today/queue/13056-6046-atlas…

    f64cd22
  16. dezren39
    closed this as completedin #7656on Nov 16, 2026
  17. developing-today
    added
    status:done
    and removed
    status:in-review
    on Nov 16, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

area/infraInfrastructure, deployment, and operationsepic/atlas-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted tests

Type

No type

Projects

No projects

    Milestone

    • Atlas programNo due date

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.