GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — Policy, triggers, enablement must agree — one agreement contract for ci-policy's guard and build workflows · Issue #7089 · developing-today/code

Policy, triggers, enablement must agree — one agreement contract for ci-policy's guard and build workflows #7089

New issue
Copy link
New issue
Copy link
Closed
6 / 66 of 6 issues completed
Closed
Policy, triggers, enablement must agree — one agreement contract for ci-policy's guard and build workflows#7089
6 / 66 of 6 issues completed
Copy link
Assignees
dezren39
Labels
area/ciCI/CD pipelines, workflows, and build automation (area)effort/mMedium: expected under 1 day of workepicMeta-issue grouping multiple items (org Project Type=Epic)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/design-architectFiled by the repo design architect jobstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted testsuser/reviewNeeds a user-look: Muse reviews first and handles what it can

Description

@dezren39
dezren39
opened on Nov 8, 2026
Issue body actions

Decision for Drew (one line): the seven guard/build workflows below are dark in three different modes while ci-policy still promises their tiers — re-arm them (merge_group for the two basic-tier guards per the sibling precedent; re-enable + restore for the build set) under this design's agreement checker, or accept dispatch-only for them too and strike their tier promises from ci-policy? Phases 1 and 4 do not wait for the ruling; the re-arm/re-enable executions in Phases 2–3 do.

Policy, triggers, enablement must agree — one agreement contract for ci-policy's guard and build workflows

Design doc: files/designs/code-ci-policy-agreement.md in the keep-the-four-repos-healthy goal workspace. Filed by the design architect (pass 70, 2026-11-07), audit at origin/main 08dd577. This pass originates on pass 69's recorded trigger: a third policy-listed guard found dead since the 2026-11-04 sweep (#6959, after #6929 + #6953) — a fourth filing (#6981, covering four build workflows) arrived in the same window.

Problem

.github/ci-policy.md states which CI checks run at which tier. One commit (5a94833, 2026-11-04) rewrote the trigger reality of ~25 workflows; nobody compared policy against reality afterwards, so the divergence surfaced by hand audit, one workflow at a time. Test suites got design #6185 and Drew's dispatch-only ruling (2026-11-05). The guard/build workflows ci-policy names got neither — #6187 inventories non-test disabled workflows "for the record only; their dispositions are not this design's to make", and #6981's body makes the same point for its set. This design takes that remainder.

Current state (verified this pass)

Seven ci-policy-promised workflows, three failure modes:

  1. Dispatch-only, venue active, check unreachable — ci(mcpx): the #1969 fix-test guard never runs — its workflow lost every trigger in the Nov 4 sweep, and ci-policy still assigns it a PR tier and a main tier #6929 (mcpx-fix-test-guard: workflow_dispatch: only; the enforcement step is pull_request-gated, so even a dispatch never runs the mcpx testing: a failing-first test for every bug, and a review of recent fixes #1969 guard; policy still assigns PR + main tiers) and ci(production-line-guard): the F11.10 line guard never runs — dispatch-only since the Nov 4 sweep, and main already fails it (directory.rs 2,610 lines, ungrandfathered) #6959 (production-line-guard: dispatch-only, venue active, and main already fails it — directory.rs 2,610 production lines vs the 2,500 limit, ungrandfathered; this workflow has no ci-policy tier row at all).
  2. Merge-group only, venue disabled — ci(opencode-config-guard): the metered-provider guard never runs — the Nov 4 sweep removed its pull_request and push triggers, and ci-policy still assigns it PR + main tiers #6953 (opencode-config-guard: kept merge_group:, but Actions state is disabled_manually, zero runs since 2026-11-03; policy claims pull requests + merge groups + pushes to main). The only CI check between the canonical OpenCode config and a metered/PAYG provider selection.
  3. Dispatch-only AND disabled — cannot run at all — ci(go-module builds): identity/map/go-modules/mcpx-nixbuild never run — dispatch-only since the Nov 4 sweep AND disabled_manually, while ci-policy assigns them PR + main tiers #6981 (go-modules-build, identity-build, map-build, mcpx-nixbuild: all workflow_dispatch:-only at HEAD, all disabled_manually per the Actions API this pass, no completed run since 2026-11-03; policy assigns a class-3 PR tier + always-on main tier).

Conforming siblings prove the intended shape: workflow-lint (active, pull_request + merge_group) and fleet-search-parity-guard (active, merge_group) both run.

The contract

For every workflow ci-policy names, three records must agree: the assigned tier, the declared triggers, and the Actions enablement state. Any disagreement is a defect with exactly one recorded disposition — re-arm, fold, or retire — never a persisting default. Agreement is checked in the tree (a script in workflow-lint, the active venue that fires on exactly the paths a trigger sweep touches) and enablement is audited from the API on #6187's recurring cadence, extended to this non-test set.

Recorded decisions (full reasoning in the design doc): the tier→trigger mapping is pinned (a basic-tier guard is satisfied by merge_group + its path gate; a main tier requires push-to-main or a named equivalent venue; dispatch-only satisfies no tier); the two basic guards re-arm via merge_group, not restored pull_request triggers (sibling precedent; no new PR-tier runner load — #6929's either/or, pinned); #6959's directory.rs follows the guard's own split-or-grandfather convention; #6981 is dispositioned per workflow.

Phases

  • Phase 1 (NEW, filed with this design): the agreement checker — tier→trigger mapping written into ci-policy, production-line guard's missing row added, checker script + contract tests under .github/scripts/, wired into workflow-lint; the Phase 2–3 disagreements land as explicit waivers naming their phase issues so the checker is green with the set explicit.
  • Phase 2 (ADOPTED): ci(mcpx): the #1969 fix-test guard never runs — its workflow lost every trigger in the Nov 4 sweep, and ci-policy still assigns it a PR tier and a main tier #6929 + ci(opencode-config-guard): the metered-provider guard never runs — the Nov 4 sweep removed its pull_request and push triggers, and ci-policy still assigns it PR + main tiers #6953 — the basic-tier guards brought into agreement, each closing with a completed run on main as proof; ci(opencode-config-guard): the metered-provider guard never runs — the Nov 4 sweep removed its pull_request and push triggers, and ci-policy still assigns it PR + main tiers #6953's venue re-enable executes when Drew rules above.
  • Phase 3 (ADOPTED): ci(production-line-guard): the F11.10 line guard never runs — dispatch-only since the Nov 4 sweep, and main already fails it (directory.rs 2,610 lines, ungrandfathered) #6959 + ci(go-module builds): identity/map/go-modules/mcpx-nixbuild never run — dispatch-only since the Nov 4 sweep AND disabled_manually, while ci-policy assigns them PR + main tiers #6981 — production-line guard dispositioned (directory.rs split-or-grandfathered) and one disposition per build workflow, executed under the same ruling gate.
  • Phase 4 (NEW, gated on Phases 1–3): closing inventory of every ci-policy-named workflow against all three legs + contract statement in ci-policy + four required dispositions (checker venue coverage; Venue-reality audit — enablement state and a disposition for every disabled test venue (Phase 3 of #6185) #6187 audit output naming the non-test set; ci(production-line-guard): the guard counts Cargo target/ build output as production code — every built tree fails on generated files #6960's guard file-selection sibling; any workflow filed dark after this design).

Open questions stay in the design doc (step-level if: reachability; nightly-tier mapping; schedule-triggered operations workflows).

Acceptance criteria

  • The problem described above is confirmed against current main (reproduced or traced to the named code path), or the issue is closed with that evidence.
  • A fix/implementation addressing the described behaviour is merged via PR referencing this issue, with tests naming their oracle where the change has meaningful invariants.
  • Related/sibling issues from the same filing batch are cross-linked and any dependency is recorded as a native blocked-by relation.

Sub-issues

Collapse Sub-issuesSub-issues

6 of 66 of 6 Issues completed
Loading 6 sub-issues

Activity

Next
  1. dezren39
    added
    status/needs-triageNot yet triaged; needs a first look
    user/reviewNeeds a user-look: Muse reviews first and handles what it can
    area/ciCI/CD pipelines, workflows, and build automation (area)
    on Nov 8, 2026
  2. developing-today commented on Nov 8, 2026

    @developing-today
    developing-todayBot
    on Nov 8, 2026 – with developing.today
    Contributor
    More actions

    CODE-2243

  3. dezren39
    added
    epicMeta-issue grouping multiple items (org Project Type=Epic)
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    source/design-architectFiled by the repo design architect job
    on Nov 8, 2026
  4. dezren39 commented on Nov 8, 2026

    @dezren39
    dezren39
    on Nov 8, 2026
    MemberAuthor
    More actions

    🤖 Agent note · filed

    • Agent: gh-post
    • Session / ID: cron action-outbox-processor run 2026-11-08T03:24Z (OB-2026-11-08-002) — filing executed by the outbox processor
    • Found via: filed this run
    • Task: Filed this issue exactly as prepared in the action outbox (OB-2026-11-08-002, prepared by gh-post 2026-11-08 01:50 UTC).
    • Expectation: needs triage; user/review as labelled
    • Links: n/a
  5. dezren39
    added sub-issues on Nov 8, 2026
    • Agreement checker — fail when ci-policy's tiers and a workflow's triggers disagree (Phase 1 of the ci-policy agreement design) #7090
    • Closing agreement audit — every ci-policy-named workflow against all three legs (Phase 4 of the ci-policy agreement design) #7091
    • ci(mcpx): the #1969 fix-test guard never runs — its workflow lost every trigger in the Nov 4 sweep, and ci-policy still assigns it a PR tier and a main tier #6929
    • ci(opencode-config-guard): the metered-provider guard never runs — the Nov 4 sweep removed its pull_request and push triggers, and ci-policy still assigns it PR + main tiers #6953
    • ci(production-line-guard): the F11.10 line guard never runs — dispatch-only since the Nov 4 sweep, and main already fails it (directory.rs 2,610 lines, ungrandfathered) #6959
    • ci(go-module builds): identity/map/go-modules/mcpx-nixbuild never run — dispatch-only since the Nov 4 sweep AND disabled_manually, while ci-policy assigns them PR + main tiers #6981
  6. developing-today commented on Nov 8, 2026

    @developing-today
    developing-todayBot
    on Nov 8, 2026 – with developing.today
    Contributor
    More actions

    agent-note:v1 — Agent: repo-design-architect-code (pass 71); state: filed — pass 70's outbox filing delivered; linking, packets and register completed this pass.

    This design was filed in pass 70 (2026-11-07) via the fleet outbox after the user leg hit GitHub's secondary rate limit (Drew's 2026-11-05 rule): outbox entry OB-2026-11-08-002 delivered as this issue #7089 on 2026-11-08T03:23Z; Phase 1 as #7090 (OB-2026-11-08-003) and Phase 4 as #7091 (OB-2026-11-08-004). Pass 71 completed the deferred items:

    • All six phases are linked as sub-issues of this design (verified by independent readback: count=6 — 7090, 6929, 6953, 6959, 6981, 7091).
    • Triage packets enqueued with explicit --queue repo-health-code-pilot: Agreement checker — fail when ci-policy's tiers and a workflow's triggers disagree (Phase 1 of the ci-policy agreement design) #7090 → task 13098 (queued, dedupe-verified), Closing agreement audit — every ci-policy-named workflow against all three legs (Phase 4 of the ci-policy agreement design) #7091 → task 13100 (queued, dedupe-verified). Closing agreement audit — every ci-policy-named workflow against all three legs (Phase 4 of the ci-policy agreement design) #7091 keeps status/blocked — it is gated on Phases 1–3. The adopted origins (ci(mcpx): the #1969 fix-test guard never runs — its workflow lost every trigger in the Nov 4 sweep, and ci-policy still assigns it a PR tier and a main tier #6929, ci(opencode-config-guard): the metered-provider guard never runs — the Nov 4 sweep removed its pull_request and push triggers, and ci-policy still assigns it PR + main tiers #6953, ci(production-line-guard): the F11.10 line guard never runs — dispatch-only since the Nov 4 sweep, and main already fails it (directory.rs 2,610 lines, ungrandfathered) #6959, ci(go-module builds): identity/map/go-modules/mcpx-nixbuild never run — dispatch-only since the Nov 4 sweep AND disabled_manually, while ci-policy assigns them PR + main tiers #6981) keep their own queue lifecycles and were noted in pass 70.
    • Register entry added in files/potential-projects.md (status: proposed, user/review decision as stated at the top of this issue).

    One filing-batch lesson, recorded in the pass-71 state row: the first database-ID batch this pass delivered a fabricated 624… series (the real IDs are 626…); links were made only with individually re-fetched IDs and verified by a separate sub_issues readback.

  7. 55 remaining items

  8. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    90-day closed-item review — WRONGLY_CLOSED concurrence (batch 103).

    This review independently verified the closure record for #7089: closed as completed by developing-today[bot] at 2026-11-11T07:33:53Z (closure event: commit_id null), 6 seconds after PR #8596 merged — a title-reference-only PR ("ci(#7089): re-arm…") carrying no closing keyword. The same bot had already closed this issue once before (2026-11-09T04:07:27Z) and it was reopened by dezren39 47 seconds later. Sub-issue #7091 (Closing agreement audit — Phase 4) is still OPEN, so the parent's agreement contract is not complete.

    Classification in the review ledger: WRONGLY_CLOSED. The remedy — reopening — was already executed by the Track A follow-up audit today (2026-11-14T17:17:47Z, verified OPEN/reopened by this review via the GitHub API), so this review does not reopen it a second time; this comment records the review's concurrence and evidence on the item. PR #8596's own merged work stands (it is ledgered IMPLEMENTED); what was wrongful is closing the parent while #7091 remains open.

  9. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Program tending — epic completion (tracking: #1352)

    • Child progress: 8 of 8 children closed (0 open).
    • Last movement: 2026-11-14T17:50:16Z.
    • All recorded children are closed. Proposing closure of this epic: if more work belongs here, reopen a child or say what remains and this stays open.
  10. github-actions
    assigned
    dezren39
    on Nov 14, 2026
  11. dezren39 commented on Nov 16, 2026

    @dezren39
    dezren39
    on Nov 16, 2026
    MemberAuthor
    More actions

    Picked up by repo-worker-any-d — working this now. (Fleet queue fallback mode: the queue backend is down, so this issue's comments carry the claim. The claim stays live while repo-worker-any-d posts progress markers; after 30 minutes of silence any other worker may pick this up.)

  12. dezren39 commented on Nov 16, 2026

    @dezren39
    dezren39
    on Nov 16, 2026
    MemberAuthor
    More actions

    Progress from repo-worker-any-d: claimed: revalidating fresh GitHub state

  13. dezren39 commented on Nov 16, 2026

    @dezren39
    dezren39
    on Nov 16, 2026
    MemberAuthor
    More actions

    Progress from repo-worker-any-d: verified: Phase4 audit evidence complete, landing ci-policy contract statement PR for #7091

  14. dezren39 commented on Nov 16, 2026

    @dezren39
    dezren39
    on Nov 16, 2026
    MemberAuthor
    More actions

    Progress from repo-worker-any-d: pr_opened: PR #10588 contract statement, checker+tests pass, checking Codex before merge

  15. dezren39
    added a commit that references this issue on Nov 16, 2026

    Merge pull request #10588 from developing-today/queue/fallback-7089-c…

    f958ede
  16. dezren39 commented on Nov 16, 2026

    @dezren39
    dezren39
    on Nov 16, 2026
    MemberAuthor
    More actions

    Agent note — closing state (Phase 4 complete, epic done)

    • Agent: repo-worker-any-d (Muse lane any-d, fleet queue FALLBACK mode)
    • All six sub-issues are now CLOSED (verified fresh via the sub-issues API: 0 open): Agreement checker — fail when ci-policy's tiers and a workflow's triggers disagree (Phase 1 of the ci-policy agreement design) #7090 (Phase 1 checker), ci(mcpx): the #1969 fix-test guard never runs — its workflow lost every trigger in the Nov 4 sweep, and ci-policy still assigns it a PR tier and a main tier #6929, ci(opencode-config-guard): the metered-provider guard never runs — the Nov 4 sweep removed its pull_request and push triggers, and ci-policy still assigns it PR + main tiers #6953, ci(production-line-guard): the F11.10 line guard never runs — dispatch-only since the Nov 4 sweep, and main already fails it (directory.rs 2,610 lines, ungrandfathered) #6959, ci(go-module builds): identity/map/go-modules/mcpx-nixbuild never run — dispatch-only since the Nov 4 sweep AND disabled_manually, while ci-policy assigns them PR + main tiers #6981 (Phases 2-3), and Closing agreement audit — every ci-policy-named workflow against all three legs (Phase 4 of the ci-policy agreement design) #7091 (Phase 4, closed by PR docs(ci-policy): land the #7089 three-leg agreement contract statement #10588).
    • Phase 4 audit is posted on Closing agreement audit — every ci-policy-named workflow against all three legs (Phase 4 of the ci-policy agreement design) #7091 (comment 6905364070): three-leg inventory of all 10 registry workflows at origin/main e956555 — policy, triggers, and Actions enablement in agreement for every row (checker OK, 0 waivers; repo-wide 75 workflows, 0 non-active) — plus dispositions (a)-(d) with evidence (Venue-reality audit — enablement state and a disposition for every disabled test venue (Phase 3 of #6185) #6187/PR docs(ci-policy): opencode-config-guard re-arm disposition + enablement re-audit (#6187 Phase 3) #8587 for the recurring enablement audit, ci(production-line-guard): the guard counts Cargo target/ build output as production code — every built tree fails on generated files #6960/PR fix(ci): production-line guard skips target/ build output (#6960) #8699 for the target/ file-selection fix).
    • The contract statement landed in .github/ci-policy.md via PR docs(ci-policy): land the #7089 three-leg agreement contract statement #10588 (merged f958ede), written in the current main-only terms of the 2026-11-13 owner ruling that superseded the design's PR-tier terms. Checker + contract tests pass on the merged shape.
    • The decision at the top of this issue was ruled (re-arm, 2026-11-11; waivers emptied and both Phase 2-3 disagreements landed under it), so no ruling remains outstanding.

    Closing this epic as complete. If more work belongs here, reopen a child or file the follow-on.

  17. dezren39
    closed this as completedon Nov 16, 2026
  18. developing-today
    added
    status:done
    and removed
    status:to-do
    on Nov 16, 2026
  19. dezren39 commented on Nov 16, 2026

    @dezren39
    dezren39
    on Nov 16, 2026
    MemberAuthor
    More actions

    Released by repo-worker-any-d (outcome: done). Phase 4 closing audit complete: three-leg inventory of 10 registry workflows posted on #7091 (all in agreement, checker OK 0 waivers, 75 workflows 0 non-active), dispositions (a)-(d) evidenced, contract statement landed via PR #10588 merged f958ede closing #7091; all 6 sub-issues closed, #7089 closed as complete.

  20. dezren39
    removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 16, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

area/ciCI/CD pipelines, workflows, and build automation (area)effort/mMedium: expected under 1 day of workepicMeta-issue grouping multiple items (org Project Type=Epic)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/design-architectFiled by the repo design architect jobstatus:donetask/small-fixQueue packet kind: bounded fix with reproduction and targeted testsuser/reviewNeeds a user-look: Muse reviews first and handles what it can

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.