GeezerVison is showing github.com — id: F12.1 apply wiring — module install + schedules reconciliation · Issue #807 · developing-today/code
id: F12.1 apply wiring — module install + schedules reconciliation #807Labels app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-inskind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednextOrg Project gate: queued next — orchestrator adds to the boardpriority/lowNice to have; do when convenient DescriptionFollow-up to the Phase 12 stack (PR #801, epic #534 D1-019).
What and why
id world apply currently reconciles grants, ceiling and profile against a live world, and id world diff reports drift. The remaining manifest fields are parsed but not yet applied over the wire: a module hash/source (install/compile) and schedules (set/cancel). The model already plans these steps; they need the server-side apply path.
Acceptance
id world apply installs (or compiles) the manifest module and applies schedule set/cancel, journaling each step.
- A manifest naming only a module + schedules applies idempotently.
Acceptance criteria
- The body's
## Acceptance bullets hold: id world apply installs (or compiles) the manifest module and applies schedule set/cancel, journaling each step.
- A manifest naming only a module + schedules applies idempotently (second apply is a no-op).
id world diff after apply reports no drift for module or schedules.
Activityadded effort/lLarge: multi-day or open-ended; expect staged check-ins app/idPackage/app: id (pkgs/ or apps/ in this repo) meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added on Oct 26, 2026dezren39 commented on Oct 26, 2026 Intake review
Related: Phase 12 stack PR #801 (merged); epic #534 (D1-019); siblings #805 (F12.11) and #806 (F12.13). PR #860 touched world apply reporting for #818, not this wiring. No merged PR resolves this (verified 2026-10-26).
Notes: The body already had an ## Acceptance list; the criteria above restate it in the standard section so queue/triage tooling can find it. Effort l: server-side apply path for module install/compile plus schedules reconciliation.
Risks: Apply-path changes are world-mutating; idempotency and journaling are the safety properties to test first.
Suggested approach: Extend the existing grants/ceiling/profile apply path with module and schedule steps, each journaled, with a diff-after-apply test.
added nextOrg Project gate: queued next — orchestrator adds to the board and removed on Oct 27, 2026dezren39 commented on Oct 29, 2026 🤖 Agent note · parked
- Agent: queue worker (repo-worker-code), Lane A shift
- Session / ID: queue task 2661
- Found via: queue claim (resume from parked awaiting_ci)
- Task: Revalidated PR id(world): wire manifest apply — module install + schedules over the wire (#807) #1820 — blockers unchanged. Main still at 5a34fa7 (ci: run nix ci on merge groups (merge-queue pilot step 1) #2233, merged 2026-10-29T10:57:51Z); issue ci: merge queue ejects every PR — no merge since #2233 (10:57Z), entries dropped 2-6 min into AWAITING_CHECKS #2403 (merge queue ejects every PR) still OPEN; clippy-lint failure is pre-existing id: clippy-lint red on main — expect_used at src/tags.rs:1484,1499 (clippy 1.99) #2401 (tags.rs, not in this PR). Codex review on head 569abd2: completed, no findings, no unresolved findings. All other checks pass.
- Expectation: Parked 1h. Resume when ci: merge queue ejects every PR — no merge since #2233 (10:57Z), entries dropped 2-6 min into AWAITING_CHECKS #2403 is fixed and merges land again: enqueue PR id(world): wire manifest apply — module install + schedules over the wire (#807) #1820 in the merge queue, merge, then complete task as fixed_merged and close id: F12.1 apply wiring — module install + schedules reconciliation #807.
- Links: PR id(world): wire manifest apply — module install + schedules over the wire (#807) #1820, blockers ci: merge queue ejects every PR — no merge since #2233 (10:57Z), entries dropped 2-6 min into AWAITING_CHECKS #2403 / id: clippy-lint red on main — expect_used at src/tags.rs:1484,1499 (clippy 1.99) #2401
dezren39 commented on Oct 29, 2026
Agent note — verified merge-ready except infra clippy + the merge-queue stall; parked
Queue task 2661 resumed by Lane B. PR #1820 verified fresh at 569abd29: MERGEABLE, all review threads resolved (7/7), latest Codex summary at this head reports no findings. CI: every check SUCCESS except clippy-lint (and its aggregate nix flake check).
Lane B re-checked the clippy failure from the run log (run 40894646360, 20:06Z attempt): it is infrastructure, not code — repeated HTTP error 418 downloads with “GitHub Actions Cache throttled Magic Nix Cache” and a Twirp ResourceExhausted rate-limit error. The PR diff does not touch src/tags.rs (the on-main clippy item in #2401). A --failed rerun has been requested (attempt 4 now in progress).
Resume: when the rerun is green and the merge-queue stall #2403 is fixed, enqueue PR #1820, verify it merges, and complete task 2661. dezren39 commented on Oct 29, 2026 🤖 Agent note · parked
- Agent: queue worker (repo-worker-code), lane B shift
- Session / ID: queue task 2661
- Found via: queue claim (resume of awaiting_ci park)
- Task: Merge PR id(world): wire manifest apply — module install + schedules over the wire (#807) #1820 (F12.1 apply wiring for id: F12.1 apply wiring — module install + schedules reconciliation #807) once its gates clear.
- Expectation: Done = clippy green on PR id(world): wire manifest apply — module install + schedules over the wire (#807) #1820, PR enqueued, verified merged, task completed.
- Links: PR id(world): wire manifest apply — module install + schedules over the wire (#807) #1820 at 569abd2. Fresh evidence 2026-10-30T00:12Z: the clippy rerun (run 40894646360, attempt 4, completed 23:35Z) FAILED — and the classification has changed: attempt 4 got past the Magic Nix Cache 418 throttling and reached real clippy errors,
clippy::expect_used at src/tags.rs:1484 and :1499. That is the pre-existing id: clippy-lint red on main — expect_used at src/tags.rs:1484,1499 (clippy 1.99) #2401 failure, not this PR's code (all other checks SUCCESS, Codex clean at head per prior shift). No further rerun is useful until id: clippy-lint red on main — expect_used at src/tags.rs:1484,1499 (clippy 1.99) #2401 merges; the merge queue stall ci: merge queue ejects every PR — no merge since #2233 (10:57Z), entries dropped 2-6 min into AWAITING_CHECKS #2403 also remains open (main frozen at 5a34fa7). Re-parking.
dezren39 commented on Oct 30, 2026 🤖 Agent note · agent-note:v1 · done — PR merged
Queue task 2661 completed by Lane C, 2026-10-30T01:04Z. PR #1820 (id(world): wire manifest apply — module install + schedules over the wire) MERGED at 2026-10-30T01:00:10Z, merge commit 17c4a0de5a34b7b919312c4b1fcf7766b3006657, after the merge-queue stall (#2403) was fixed. The PR body says "Closes the apply-wiring gap in #807" (not the auto-close keyword), so this issue is being closed manually with that evidence. The pre-existing clippy debt at src/tags.rs:1484,1499 remains tracked separately in #2401.
MetadataMetadataapp/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-inskind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednextOrg Project gate: queued next — orchestrator adds to the boardpriority/lowNice to have; do when convenient DevelopmentNo branches or pull requestsIssue actions
|