GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — Quota full-utilization program + burn plan (shipped — tracking home) · Issue #8825 · developing-today/code

Quota full-utilization program + burn plan (shipped — tracking home) #8825

New issue
Copy link
New issue
Copy link
Open
Open
Quota full-utilization program + burn plan (shipped — tracking home)#8825
Copy link
Labels
designDesign record / living design doc tracking homedesign/quota-planeDesign: quota-plane - all issues of this effort carry itepic/design-registerEpic: design-register - all issues of this effort carry itepic/fleet-orchestrationReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
Milestone
Design register 2026-11

Description

@dezren39
dezren39
opened on Nov 12, 2026
Issue body actions

The 2026-10-29 program to stop letting non-DeepSeek plans end their periods under-used: a theoretical full-utilization plan for every pool's largest window, burn rates from recorded history, cascade projections across consecutive resets, dated audibles (route-pool weight/priority changes, queue more work when under-pace), checked every 4–6h, over-pace flagged to Drew. Plan v1 landed 2026-10-29 with five dated audibles A1–A5.

Status: shipped / completed (plan v1, 2026-10-29)

Living document: developing-today/code doc/living/quota-full-utilization-burn-plan.md

Register: 60-day design register (developing-today/code pm-stack/design-register-2026-11-11.md, tracking epic #8805), entry F4.5.

Lineage: the original ask was tracked by code#2173 (now CLOSED), so this issue is the standing tracking home. The plan document itself sat uncommitted in ~/workspace/research_notes until this pass.

Tracking home for a completed design. Stays open until Drew parks or abandons it, or a successor design supersedes it.

Activity

  1. dezren39
    added
    designDesign record / living design doc tracking home
    on Nov 12, 2026
  2. developing-today commented on Nov 12, 2026

    @developing-today
    developing-todayBot
    on Nov 12, 2026 – with developing.today
    Contributor
    More actions

    CODE-2652

  3. dezren39
    added this to the Design register 2026-11 milestone on Nov 12, 2026
  4. dezren39
    added
    epic/design-registerEpic: design-register - all issues of this effort carry it
    design/quota-planeDesign: quota-plane - all issues of this effort carry it
    epic/fleet-orchestrationReprioritization program epic (2026-11-12)
    on Nov 12, 2026
  5. github-actions
    assigned
    dezren39
    on Nov 12, 2026
  6. dezren39
    added
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    on Nov 12, 2026
  7. dezren39
    added a parent issue on Nov 12, 2026
    • epic: design register — every design tracked, boarded, and monitored #8986
  8. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 17, 2026
  9. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    Picked up for triage by queue task #18740 (lane code-h). Revalidating the tracking-home issue and its shipped status; scope is issue #8825 only.

  10. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    Triage verdict: shipped / tracking home; no follow-on implementation packet warranted. The issue itself says the 2026-10-29 plan is completed and remains open until Drew parks/abandons it or a successor design supersedes it. The live record is doc/living/quota-full-utilization-burn-plan.md; the design-register entry F4.5 and closed tracking epic #8805 provide the audit context. No implementation action is left for this triage task, and the issue should remain open as its stated tracking home.

  11. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 17, 2026
  12. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done

    • Agent: queue worker (repo-worker-code), Muse lane any-i
    • Session / ID: task 19372 (broker follow-on of triage task 18740)
    • Found via: queue claim
    • Task: Follow-on packet for issue Quota full-utilization program + burn plan (shipped — tracking home) #8825 — verified there is no implementation work to do, so task 19372 completes as already_done.
    • Fresh verification (2026-11-17, this lane): the triage of record (task 18740, lane code-h, note 6934447859) stands: the quota full-utilization program shipped 2026-10-29, the living document doc/living/quota-full-utilization-burn-plan.md is present on origin/main (verified this pass), and the issue's own terms keep it OPEN as the standing tracking home until Drew parks/abandons it or a successor design supersedes it. No code change, PR, or further follow-on is warranted; this packet was the broker's automatic triage follow-on, not a scoped fix.
    • Expectation: issue Quota full-utilization program + burn plan (shipped — tracking home) #8825 remains open as its stated tracking home; any future action on it is Drew's park/abandon call or a successor design, not fleet implementation.
  13. dezren39
    removed their assignment
    on Nov 20, 2026
  14. dezren39
    removed a parent issue on Nov 23, 2026
    • epic: design register — every design tracked, boarded, and monitored #8986
  15. dezren39
    added a parent issue on Nov 23, 2026
    • epic: fleet orchestration & dispatch — F4 design family (tracking home) #12950
  16. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    agent-note:v1 — oc-code-07 second-pass (queue task 22816, pass 3, 2026-11-24). Fresh state: #8825 OPEN, labels unchanged. Living doc doc/living/quota-full-utilization-burn-plan.md present on origin/main. Verdict: already resolved in substance; tracking home stays open until Drew parks or supersedes it. No follow-on packet routed. Tracking: #14158

  17. developing-today commented on Nov 27, 2026

    @developing-today
    developing-todayBot
    on Nov 27, 2026 – with developing.today
    Contributor
    More actions

    Triage re-verification (queue task 25270, lane oc-code-06, 2026-11-27): shipped / tracking home; no action. Fresh check confirms prior verdicts (tasks 18740, 19372, 22816): issue is OPEN by design as the standing tracking home for the completed 2026-10-29 quota full-utilization program; living doc doc/living/quota-full-utilization-burn-plan.md present on main; labels unchanged. Stays open until Drew parks/abandons it or a successor design supersedes it. No code change, PR, or follow-on packet warranted; completing as already-done.

  18. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions
    Triage revalidation (lane any-n, task 25703, 2026-11-27): **already solved in substance; tracking home stays open by design.** Living doc `doc/living/quota-full-utilization-burn-plan.md` verified present on `origin/main` (393c383). Agrees with prior verdicts (tasks 18740, 19372, 22816, 25270): no code change, PR, or follow-on warranted; closure/park is Drew's call. Completing as already-done.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    designDesign record / living design doc tracking homedesign/quota-planeDesign: quota-plane - all issues of this effort carry itepic/design-registerEpic: design-register - all issues of this effort carry itepic/fleet-orchestrationReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearing

    Type

    No type

    Projects

    No projects

      Milestone

      • Design register 2026-11No due date

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.