GeezerVison is showing github.com — Quota full-utilization program + burn plan (shipped — tracking home) · Issue #8825 · developing-today/code
Quota full-utilization program + burn plan (shipped — tracking home) #8825DescriptionThe 2026-10-29 program to stop letting non-DeepSeek plans end their periods under-used: a theoretical full-utilization plan for every pool's largest window, burn rates from recorded history, cascade projections across consecutive resets, dated audibles (route-pool weight/priority changes, queue more work when under-pace), checked every 4–6h, over-pace flagged to Drew. Plan v1 landed 2026-10-29 with five dated audibles A1–A5.
Status: shipped / completed (plan v1, 2026-10-29)
Living document: developing-today/code doc/living/quota-full-utilization-burn-plan.md
Register: 60-day design register (developing-today/code pm-stack/design-register-2026-11-11.md, tracking epic #8805), entry F4.5.
Lineage: the original ask was tracked by code#2173 (now CLOSED), so this issue is the standing tracking home. The plan document itself sat uncommitted in ~/workspace/research_notes until this pass.
Tracking home for a completed design. Stays open until Drew parks or abandons it, or a successor design supersedes it. Activitydeveloping-today commented on Nov 12, 2026 dezren39 commented on Nov 17, 2026
Picked up for triage by queue task #18740 (lane code-h). Revalidating the tracking-home issue and its shipped status; scope is issue #8825 only. dezren39 commented on Nov 17, 2026
Triage verdict: shipped / tracking home; no follow-on implementation packet warranted. The issue itself says the 2026-10-29 plan is completed and remains open until Drew parks/abandons it or a successor design supersedes it. The live record is doc/living/quota-full-utilization-burn-plan.md; the design-register entry F4.5 and closed tracking epic #8805 provide the audit context. No implementation action is left for this triage task, and the issue should remain open as its stated tracking home. dezren39 commented on Nov 17, 2026 🤖 Agent note · done
- Agent: queue worker (repo-worker-code), Muse lane any-i
- Session / ID: task 19372 (broker follow-on of triage task 18740)
- Found via: queue claim
- Task: Follow-on packet for issue Quota full-utilization program + burn plan (shipped — tracking home) #8825 — verified there is no implementation work to do, so task 19372 completes as
already_done.
- Fresh verification (2026-11-17, this lane): the triage of record (task 18740, lane code-h, note 6934447859) stands: the quota full-utilization program shipped 2026-10-29, the living document
doc/living/quota-full-utilization-burn-plan.md is present on origin/main (verified this pass), and the issue's own terms keep it OPEN as the standing tracking home until Drew parks/abandons it or a successor design supersedes it. No code change, PR, or further follow-on is warranted; this packet was the broker's automatic triage follow-on, not a scoped fix.
- Expectation: issue Quota full-utilization program + burn plan (shipped — tracking home) #8825 remains open as its stated tracking home; any future action on it is Drew's park/abandon call or a successor design, not fleet implementation.
dezren39 commented on Nov 24, 2026 agent-note:v1 — oc-code-07 second-pass (queue task 22816, pass 3, 2026-11-24). Fresh state: #8825 OPEN, labels unchanged. Living doc doc/living/quota-full-utilization-burn-plan.md present on origin/main. Verdict: already resolved in substance; tracking home stays open until Drew parks or supersedes it. No follow-on packet routed. Tracking: #14158 developing-today commented on Nov 27, 2026
Triage re-verification (queue task 25270, lane oc-code-06, 2026-11-27): shipped / tracking home; no action. Fresh check confirms prior verdicts (tasks 18740, 19372, 22816): issue is OPEN by design as the standing tracking home for the completed 2026-10-29 quota full-utilization program; living doc doc/living/quota-full-utilization-burn-plan.md present on main; labels unchanged. Stays open until Drew parks/abandons it or a successor design supersedes it. No code change, PR, or follow-on packet warranted; completing as already-done. developing-today-fleet commented on Nov 27, 2026 Triage revalidation (lane any-n, task 25703, 2026-11-27): **already solved in substance; tracking home stays open by design.** Living doc `doc/living/quota-full-utilization-burn-plan.md` verified present on `origin/main` ( 393c383). Agrees with prior verdicts (tasks 18740, 19372, 22816, 25270): no code change, PR, or follow-on warranted; closure/park is Drew's call. Completing as already-done.
MetadataMetadataDevelopmentNo branches or pull requestsIssue actions
|