GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — design(pm-orchestration): Versioned canonical work read model and provenance · Issue #9468 · developing-today/code

design(pm-orchestration): Versioned canonical work read model and provenance #9468

New issue
Copy link
New issue
Copy link
Done
Done
design(pm-orchestration): Versioned canonical work read model and provenance#9468
Copy link
Labels
app/fleetpkgs/fleet multicall binary + platform cratesapp/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/mMedium: expected under 1 day of workepic/pm-stackReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingprimary-parent/pm-stackPrimary parent epic pm-stack (design §3)priority/highImportant and time-sensitivepriority/normalOrdinary priority (the default)source/queue-workerFiled or worked by the queue/worker pilotstray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)

Description

@dezren39
dezren39
opened on Nov 13, 2026
Issue body actions

MOB-01 — Versioned canonical work read model and provenance

Issue title: design(pm-orchestration): Versioned canonical work read model and provenance
Design parent: #9201 · Scope: #9201 PM projection/mobile · Version: V3 proposal; not an authorization to implement. Requirement IDs (ALLOCATED): C-R080, H-R011, O-R017. Slice status: curated implementation/research slice. Pinned baseline: a038f084dbeb525494d7bb928ad91f597db2ac51.

This batch creates design/research/validation handoff issues only. After PR #9225 is merged and this slice's granular prerequisites are resolved, a separately scoped implementation issue may be filed; production adoption, migration, deployment, and live acceptance remain separately authorized stages. The local FDR decisions are accepted design defaults; global #9180 registration is pending and is not a blocker to this bounded design work.

Goal and deliverable

project per-fact authority/revision/freshness and queue/Project/GitHub/session state without a new DB. -

Curated requirement trace

  • C-R080 — design-only (requirement); basis: exact frozen implementation_slice_keys inverse join; support rationale: none; occurrences C-108; citations: 02_charter_v1_1.md#C-108:76; design: components/9201-pm-projection-mobile-control.md#31-read-model-one-projection-provenance-per-fact; outcome: Mobile-first interactive operations; residual: See status reason and missing_evidence; implementation slices are local keys, not issue IDs.; missing evidence: exact implementation/parser tests for the full behavior, deployment/live acceptance unless separately cited
  • H-R011 — design-only (requirement); basis: exact frozen implementation_slice_keys inverse join; support rationale: none; occurrences H-138; citations: 01_handoff_pm_stack_fleet_orchestration.md#H-138:103; design: components/9199-distributed-priority.md#independent-dimensions, components/9201-pm-projection-mobile-control.md#31-read-model-one-projection-provenance-per-fact; outcome: Account for project/epic lifecycle and strategic urgency with manual intervention and owner escalation, not arithmetic sorting alone.; residual: See status reason and missing_evidence; implementation slices are local keys, not issue IDs.; missing evidence: exact implementation/parser tests for the full behavior, deployment/live acceptance unless separately cited
  • O-R017 — design-only (candidate); basis: exact frozen implementation_slice_keys inverse join; support rationale: none; occurrences O-688, O-689, O-690, O-691, O-692, O-693, O-694, O-695, O-696, O-697, O-698; citations: 04_recovered_original_combined_design.md#O-688:13, 04_recovered_original_combined_design.md#O-689:13, 04_recovered_original_combined_design.md#O-690:13, 04_recovered_original_combined_design.md#O-691:13, 04_recovered_original_combined_design.md#O-692:13, 04_recovered_original_combined_design.md#O-693:13, 04_recovered_original_combined_design.md#O-694:13, 04_recovered_original_combined_design.md#O-695:13, 04_recovered_original_combined_design.md#O-696:13, 04_recovered_original_combined_design.md#O-697:13, 04_recovered_original_combined_design.md#O-698:13; design: components/9199-distributed-priority.md#candidate-order-and-rank-semantics, components/9201-pm-projection-mobile-control.md#31-read-model-one-projection-provenance-per-fact; outcome: Let project/epic phase, deadlines and dependencies influence effective order selectively; prioritize critical path/unblockers, avoid escalating unrelated children, and expose project plus item urgency.; residual: See status reason and missing_evidence; implementation slices are local keys, not issue IDs.; missing evidence: exact implementation/parser tests for the full behavior, deployment/live acceptance unless separately cited

Deliver this bounded slice only. It enables downstream work only after its stated contracts and prerequisites are accepted; it does not imply that other component specs, closed parent issues, source code, tests, deployments, or runtime behavior are complete.

Owned files and boundaries

  • pm-stack/aggregator/src/model.ts
  • pm-stack/aggregator/src/work-projection.ts
  • pm-stack/aggregator/test/work-projection.test.ts

Explicit read-only consumers (not writable ownership): none declared.

Use the existing Fleet queue/PM Stack/adapter owners named in the design; do not add a queue, database, scheduler, service, resolver, executable, GitHub client, or general creation-outbox producer. Shared CLI glue remains owned by the single CLI-13 registration slice. Do not edit #6533 or duplicate its live acceptance; consume #9028/#9073–#9076/#9079/#9081/#9178/#9179/#3424/#8575/#8579 as applicable, not as replacement work.

Prerequisites and sequencing

Hard blockers named by the source slice, after granular-key normalization: #9070, #9062, #9073, #9076
File-collision sequencing edges added by stable topological serialization: none.
Existing issue references retained as non-blocking runtime/evidence gates: none.
Domain-starter parent references are never emitted as hard native blockers. Source parents normalized to granular slices or runtime gates: none.

Use only granular issue-key edges after all keys are resolved. Never make a whole domain starter a hard blocker when it creates a cycle. File collisions are hard sequencing edges. Parent integration adds native parent/blocker edges in a later pass after the command map, requirements IDs, and acyclic graph are verified.

Starting failing test, oracle, and done check

  • First failing test: Done
  • Oracle: deterministic model-based matrix over independent GitHub/Project/queue/session states; output equals golden pm-work-view/v1 fixtures, each fact has a source/revision/freshness; unknown remains absent; stale/errors are not zero. Command: cd pm-stack/aggregator && bun test test/work-projection.test.ts (package.json declares test: bun test). -
  • Done command: deterministic model-based matrix over independent GitHub/Project/queue/session states; output equals golden pm-work-view/v1fixtures, each fact has a source/revision/freshness; unknown remains absent; stale/errors are not zero. Command:cd pm-stack/aggregator && bun test test/work-projection.test.ts (package.jsondeclarestest: bun test). -
  • Tests must first be listed by exact name in the owning target (-- --list); assert the test exists before execution. A zero-test filter passing is not acceptance.

Acceptance and negative cases

deterministic model-based matrix over independent GitHub/Project/queue/session states; output equals golden pm-work-view/v1 fixtures, each fact has a source/revision/freshness; unknown remains absent; stale/errors are not zero. Command: cd pm-stack/aggregator && bun test test/work-projection.test.ts (package.json declares test: bun test). -

Negative coverage: stale input, duplicate/replay, ambiguous resource, unauthorized actor, partial remote effect, unknown version, and no false verified/completed result where applicable.

Compatibility, migration, and runtime gates

  • Preserve the current queue/status/identity/Project-writer/Fleet gh compatibility surfaces. Do not silently change existing spellings or normalize ratified expedite=15 / next-up=25; those remain distinct from do_now.
  • QTI remains unlocated/unverified; research(pm-orchestration): recover Queue Table Improvements provenance and schema crosswalk #9241 is the existing provenance-recovery issue. design(queue): durable task data model — blocker links, park revalidation, status reasons + notes, full event history, actor provenance #3424/Design: one door, one home per fact — the fleet tool owns every route and every fallback #8575/Fleet unification slice 1: wipe-test audit of the queue database schema #8579/docs(fleet): #8579 wipe-test audit of the queue database schema #8602 are candidates/constraints, not presumed equivalents. Any overlapping persisted field/schema change waits for the QTI crosswalk and named current owner.
  • Runtime gates: implementation starts only after the document PR is merged, the exact curated requirement IDs are integrated, and this issue's granular prerequisite edges are resolved. Schema/migration, production rollout, telemetry, authenticated remote writes, deployed behavior, and live acceptance each require their own explicit evidence and approval. Normal triage does not inherit urgency 450/Do Now.
  • Projection rows being rebuildable/disposable does not authorize deleting the PM PostgREST database or unrelated tables. Preserve unique human-authored pmp_links/link writes and all unrelated tables; follow the existing backup/restore requirements before any future migration or cleanup.
  • Compatibility: Additive and reversible only after existing owner/schema review; retain prior data and behavior; no silent fallback or dual authority.
  • Rollback: Disable only the new capability; preserve pending intents, artifacts, existing state, and remote effects. No broad reset, destructive cleanup, or deletion of history.

Source trail

  • Raw source refs: handoff sources/01_handoff_pm_stack_fleet_orchestration.md; charter sources/02_charter_v1_1.md; recovered original sources/04_recovered_original_combined_design.md; cited source section(s) in sources/03_full_orchestration_proposal.md as named by the component; exact occurrence citations are in the curated trace above when allocated.
  • Design ref: components/9201-pm-projection-mobile-control.md, slice MOB-01 (proposal only).
  • Prior-art/evidence receipts: research/track-a-state-of-art.md, research/track-b-state-of-art.md, research/track-b-sources.json; additional exact evidence anchors for this slice: see the pinned census and component evidence links above.
  • Parent-approved support mapping (validation/expansion support only, not a direct slice-key match): none.
  • Existing external requirement refs not assigned a new curated ID: none.
  • Command allocation: none; this is not a command-owning slice. Full command inventory remains census/commands.jsonl; exact allocation source is census/command-slice-map.jsonl (215 rows, no wildcard). V1 baseline keys are not refiled as duplicate implementation issues.
  • Shared architecture: architecture.md; FDR index: decisions/README.md (all FDR-PMO records remain proposed, not ratified).

Original slice text (preserved)

MOB-01 — Versioned canonical work read model and provenance

  • Parent: design(pm-orchestration): PM projection & mobile control surface (Project #4, board, live-session direction) #9201. Requirements: H-SURVIVE-A, C-3/C-6/C-7, O-PART1 §18; V2 §3.1. Goal: project per-fact authority/revision/freshness and queue/Project/GitHub/session state without a new DB.
  • Owned files: pm-stack/aggregator/src/model.ts, new pm-stack/aggregator/src/work-projection.ts, corresponding pm-stack/aggregator/test/work-projection.test.ts; read integration only where existing source APIs already expose the fields.
  • Enables: shared cards/details/views and receipt previews; no mutation.
  • Failing test to start: add a model/golden fixture with same issue open, PR merged, queue blocked, stale Project feed and bound session; assert every facet survives and status projection reports conflict rather than Done/Ready.
  • Named red test: work_projection_preserves_source_state_under_conflicting_facets in pm-stack/aggregator/test/work-projection.test.ts.
  • Done/oracle: deterministic model-based matrix over independent GitHub/Project/queue/session states; output equals golden pm-work-view/v1 fixtures, each fact has a source/revision/freshness; unknown remains absent; stale/errors are not zero. Command: cd pm-stack/aggregator && bun test test/work-projection.test.ts (package.json declares test: bun test).
  • Edges: soft dependency on impl(pm-stack): genealogy read model — ancestors, spawned-by, sentence renderer, API #9070/pm-stack collector: multi-project pool (forks + lab boards) and App-bucket identity #9062 and read contract; consume impl(fleet): fleet gh Metadata superset — create-path stamping + DB insert (extends #9016) #9073–impl(fleet): dual ingestion — webhook listener + interval sweeper, Metadata backfill, retroactive completion #9076. No schema migration; hard boundary that Project stays single-writer.

Activity

Next
  1. dezren39
    added
    app/pm-stackpm-stack (Pad/Grist) in developing-today/code
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    status:to-do
    app/fleetpkgs/fleet multicall binary + platform crates
    on Nov 13, 2026
  2. developing-today commented on Nov 13, 2026

    @developing-today
    developing-todayBot
    on Nov 13, 2026 – with developing.today
    Contributor
    More actions

    CODE-3090

  3. dezren39
    added a parent issue on Nov 13, 2026
    • design(pm-orchestration): PM projection & mobile control surface (Project #4, board, live-session direction) #9201
  4. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    priority/normalOrdinary priority (the default)
    effort/mMedium: expected under 1 day of work
    source/queue-workerFiled or worked by the queue/worker pilot
    on Nov 13, 2026
  5. dezren39 commented on Nov 13, 2026

    @dezren39
    dezren39
    on Nov 13, 2026
    MemberAuthor
    More actions

    Triage (task 15932, lane any-d, 2026-11-13): MOB-01 is a well-formed design-stage slice; implementation is correctly gated and not yet authorized. Routed to a gated implementation follow-on (task 15993).

    Fresh verification:

    • Issue design(pm-orchestration): Versioned canonical work read model and provenance #9468 OPEN, no hard-stop labels (no held / user/owned / do-not-merge / do-not-auto-edit). It is the curated MOB-01 slice under design(pm-orchestration): PM projection & mobile control surface (Project #4, board, live-session direction) #9201 (PM projection and mobile control surface), program PM Stack & Fleet orchestration — priority, dispatch, and work-item lifecycle (design mill) #9196, pinned baseline a038f08 in its body. Its own status line: "V3 proposal; not an authorization to implement." Allocated requirement IDs: C-R080, H-R011, O-R017.
    • Design gate unmerged: PR docs(pm-orchestration): build out both orchestration design tracks #9225 is still OPEN, and design parent design(pm-orchestration): PM projection & mobile control surface (Project #4, board, live-session direction) #9201 is OPEN. The slice text allows a separately scoped implementation issue only after PR docs(pm-orchestration): build out both orchestration design tracks #9225 merges AND its granular prerequisites resolve.
    • Edges are soft, as written on design(pm-orchestration): Versioned canonical work read model and provenance #9468: soft dependency on impl(pm-stack): genealogy read model — ancestors, spawned-by, sentence renderer, API #9070/pm-stack collector: multi-project pool (forks + lab boards) and App-bucket identity #9062 and the read contract; consume impl(fleet): fleet gh Metadata superset — create-path stamping + DB insert (extends #9016) #9073-impl(fleet): dual ingestion — webhook listener + interval sweeper, Metadata backfill, retroactive completion #9076 — all verified OPEN today (pm-stack collector: multi-project pool (forks + lab boards) and App-bucket identity #9062, impl(fleet): fleet gh Metadata superset — create-path stamping + DB insert (extends #9016) #9073, impl(fleet): metadata database + fleet Metadata query surface #9074, impl(fleet): session state — session id in env + worktree pwd-file #9075, impl(fleet): dual ingestion — webhook listener + interval sweeper, Metadata backfill, retroactive completion #9076 individually read back OPEN). They inform the read model; they are not hard gates. The one hard boundary is architectural: Project stays single-writer, no schema migration, no new DB, read integration only where existing source APIs already expose the fields.
    • Oracle baseline established: the slice's named red test is work_projection_preserves_source_state_under_conflicting_facets in pm-stack/aggregator/test/work-projection.test.ts. That file is absent on main (checked the laptop primary at 7535eba; the aggregator test directory exists, the file does not). That is the correct pre-implementation state — the follow-on must assert the file exists before running bun test, since a missing-file run is not acceptance.
    • Gates preserved untouched: unknown remains absent and stale/errors are not zero are acceptance properties of the read model; this triage adds no DB, no mutation path, and no writer. QTI remains unlocated/unverified (research(pm-orchestration): recover Queue Table Improvements provenance and schema crosswalk #9241). No schema, migration, runtime, or production scope is implied by this triage. Historical urgency 450/Do Now was NOT translated into queue priority (priority/normal, task priority 30).

    Labels decided: priority/normal, effort/m, kind/design stands (already present).

    Routing: implementation follow-on enqueued as queue task 15993 (dedupe repo-health:v1:fix:developing-today/code:issue:9468) with the gates as its first instruction — on claim, if PR #9225 is unmerged or #9201 is still open, dep-block on the unmet set instead of starting; the soft edges are read contracts to consume, not extra gates. Acceptance: the named red test exists and bun test test/work-projection.test.ts passes in pm-stack/aggregator, with output equal to the golden pm-work-view/v1 fixtures.

  6. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    on Nov 13, 2026
  7. 43 remaining items

  8. dezren39
    added 2 commits that reference this issue on Nov 25, 2026

    docs(9468): MOB-01 versioned work read model design record (#14726)

    ff14a0d

    feat(pm-aggregator): pm_work_view/v1 canonical work read model with p…

    273cf21
  9. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Progress — MOB-01 implementation slice landed as PR #15188 (xaltha, 2026-11-25 hourly loop, via parent starter #9201).

    • Gate check (fresh): the MOB-01 design-only gate is void under Drew's 2026-11-24 ruling on PM Stack & Fleet orchestration — priority, dispatch, and work-item lifecycle (design mill) #9196 (self-imposed design-only gates stand only where a hard blocker is named). design(pm-orchestration): Versioned canonical work read model and provenance #9468's named hard blockers are all CLOSED: impl(pm-stack): genealogy read model — ancestors, spawned-by, sentence renderer, API #9070, pm-stack collector: multi-project pool (forks + lab boards) and App-bucket identity #9062, impl(fleet): fleet gh Metadata superset — create-path stamping + DB insert (extends #9016) #9073, impl(fleet): dual ingestion — webhook listener + interval sweeper, Metadata backfill, retroactive completion #9076. The MOB-01 design record already landed in PR docs(9468): MOB-01 versioned work read model design record #14726. No other lane holds this slice (no open PR/branch for design(pm-orchestration): Versioned canonical work read model and provenance #9468 at claim-check).
    • PR feat(pm-aggregator): pm_work_view/v1 canonical work read model with per-fact provenance (#9468) #15188 (xaltha/9468-work-projection): new pm-stack/aggregator/src/work-projection.ts — pure projection to pm_work_view/v1 per design §3.1 (per-fact source/revision/freshness; absent stays absent, stale/error never zeroed; Done only on a verified terminal receipt; parked/blocked never promoted by urgency; In Progress only on a fresh authoritative claim; unverified session binding = conflict, not a live session; manual_only/do_now never bypass hard gates; hierarchy distinct from hard dependencies) — plus test/work-projection.test.ts, a 12-test deterministic matrix naming the §3.1 oracle. Owned files only; model.ts untouched (no changes needed).
    • Verification — INCOMPLETE, stated plainly: remote fleet-command run 45679719401 failed at its "Execute target command" step (step metadata only; CI logs were NOT read — log-readback is a distinct execution-risk hold class). A retry dispatch with a bun bootstrap was refused by the dispatch endpoint on repeated attempts, and PR feat(pm-aggregator): pm_work_view/v1 canonical work read model with per-fact provenance (#9468) #15188's check rollup so far shows only bot checks (CodeRabbit/Proof skipped), no aggregator test run. The slice's done check (cd pm-stack/aggregator && bun test test/work-projection.test.ts) still needs one successful remote run before this can be called verified; re-dispatch when the workflow endpoint recovers.
    • design(pm-orchestration): PM projection & mobile control surface (Project #4, board, live-session direction) #9201 stays open: its remaining children (design(pm-orchestration): Lifecycle projection, column precedence, and truthful claim binding #9469–design(pm-orchestration): Hosted PM/Fleet projection parity #9477) are still labelled blocked, though design(pm-orchestration): Lifecycle projection, column precedence, and truthful claim binding #9469's blockers design(pm-orchestration): Versioned canonical work read model and provenance #9468 (this slice) and design(pm-orchestration): Versioned PriorityProfile contract and pure validation/comparison interface #9478 (now CLOSED) are resolving — worth a label/gate recheck next loop.
  10. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Verification update (xaltha lane, 2026-11-25): PR #15188's remote verification run 45679719401 (fleet-command, developing-today/fleet) completed with conclusion success (created 2026-11-25T18:53:33Z, completed 19:07:19Z; job/step metadata also shows the Execute target command step concluded success). Metadata only — no CI logs read. PR #15188 is verified-green for its dispatched check. This supersedes the earlier incomplete-verification note on this issue, which recorded a step failure for this run before its terminal state.

  11. dezren39
    added a commit that references this issue on Nov 26, 2026

    Merge pull request #15188 from developing-today/xaltha/9468-work-proj…

    5fe3cd1
  12. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    MOB-01 slice merged — PR #15188 (shepherded by lane WC, queue task 23998).

    PR #15188 (pm_work_view/v1 canonical work read model, pm-stack/aggregator/src/work-projection.ts + test/work-projection.test.ts) was independently verified (files byte-identical to PR head by blob SHA; bun test test/work-projection.test.ts = 12 pass / 0 fail; corroborates fleet run 45679719401 success) and merged 2026-11-26T14:56:19Z, merge commit 5fe3cd13e952d8ed130d2999c5f35fb0d58573e7. Both files are on main with unchanged blob SHAs; main-branch CI for the merge commit was queued at merge time. Evidence: #15188 (comment)

    #9468 itself stays open (the PR only Refs it): it is the design parent for the remaining MOB slices.

  13. developing-today-fleet
    removed
    status/blockedQueue or user escalation state
    queue/blockedQueue or user escalation state
    on Nov 27, 2026
  14. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Decided: remove stale owner/design-container blocker labels; #9201 remaining open is not a blocker for this delivered, bounded read-model slice.
    Why: #15188 is merged (5fe3cd1), the prior recorded 12-test verification is successful, and current main contains the projection plus an expanded 14-test matrix. The latest comment itself states the slice is merged. This issue is MOB-01 under design parent #9201, not a reason to block all remaining MOB slices. I did not rerun the full acceptance or close the issue in this bounded shortlist check; retain any concrete remaining acceptance, not an owner-approval gate.
    Undo: restore blocking labels only with a named unmet technical prerequisite and code evidence.
    By: code-i

    Fleet front door returned this as a shortlist item, not a queue claim. No new implementation was started on the already-merged writer branch; any remaining MOB-01 verification or code slice needs a fresh branch.

  15. developing-today-fleet
    added
    epic/pm-stackReprioritization program epic (2026-11-12)
    primary-parent/pm-stackPrimary parent epic pm-stack (design §3)
    stray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)
    on Nov 27, 2026
  16. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage verdict (lane oc-code-06, queue task 18983): resolved — closing as completed

    Fresh verification 2026-11-27 against origin/main (485dd8c):

    • Implementation slice merged: PR feat(pm-aggregator): pm_work_view/v1 canonical work read model with per-fact provenance (#9468) #15188 feat(pm-aggregator): pm_work_view/v1 canonical work read model with per-fact provenance — MERGED 2026-11-26T14:56:19Z.
    • Deliverables on main: pm-stack/aggregator/src/work-projection.ts and pm-stack/aggregator/test/work-projection.test.ts both present.
    • Tests green (fresh run this lane): bun test test/work-projection.test.ts on the exact origin/main file content → 14 pass / 0 fail, 44 expect() calls. Oracle: design(pm-orchestration): PM projection & mobile control surface (Project #4, board, live-session direction) #9201 design §3.1 rules as a deterministic matrix; golden shape pm_work_view/v1 with per-fact source/revision/freshness.
    • Prerequisites: PR docs(pm-orchestration): build out both orchestration design tracks #9225 MERGED (2026-11-13); design record PR docs(9468): MOB-01 versioned work read model design record #14726 MERGED; named hard blockers impl(pm-stack): genealogy read model — ancestors, spawned-by, sentence renderer, API #9070, pm-stack collector: multi-project pool (forks + lab boards) and App-bucket identity #9062, impl(fleet): fleet gh Metadata superset — create-path stamping + DB insert (extends #9016) #9073, impl(fleet): dual ingestion — webhook listener + interval sweeper, Metadata backfill, retroactive completion #9076 all CLOSED.
    • Design parent design(pm-orchestration): PM projection & mobile control surface (Project #4, board, live-session direction) #9201 still OPEN, but per the 2026-11-27 fleet decision on this issue, its remaining-open status is not a blocker for this delivered, bounded read-model slice.

    No follow-on packet: the MOB-01 deliverable (versioned canonical work read model with per-fact provenance, no new DB) is implemented, tested, and on main. Closing as completed.

  17. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Closed as implemented.

  18. developing-today-fleet
    closed this as completedon Nov 27, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/fleetpkgs/fleet multicall binary + platform cratesapp/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/mMedium: expected under 1 day of workepic/pm-stackReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingprimary-parent/pm-stackPrimary parent epic pm-stack (design §3)priority/highImportant and time-sensitivepriority/normalOrdinary priority (the default)source/queue-workerFiled or worked by the queue/worker pilotstray-workStray work: not tied to a design or roadmap item (AUDIT-7 Lane 7)

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.