GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — atlas: feedback normalisation + decision wiring, nominations only (#6027 follow-on 5) · Issue #9977 · developing-today/code

atlas: feedback normalisation + decision wiring, nominations only (#6027 follow-on 5) #9977

New issue
Copy link
New issue
Copy link
Closed
Closed
atlas: feedback normalisation + decision wiring, nominations only (#6027 follow-on 5)#9977
Copy link
Assignees
dezren39
Labels
area/infraInfrastructure, deployment, and operationsepic/atlas-programReprioritization program epic (2026-11-12)kind/enhancementpriority/normalOrdinary priority (the default)status:done

Description

@dezren39
dezren39
opened on Nov 14, 2026
Issue body actions

Follow-on 5 of 5 from the #6027 design (doc/2026-11-10T20-41-01Z_design_atlas_retrieval_stats_feedback.md, merged via PR #8251). Parent program: #6018. Depends on follow-ons 3 (aggregation) and 4 (feedback capture).

Scope (design §§6.2–6.3, 7)

  • The normalisation agent pass: essay/comment feedback is normalised into structured signal (categories incl. stale-content, wrong-content, ranking-too-low, missing-result) with the query context; the raw record is preserved alongside the derived one (invariant 4).
  • Weighting per §6.3 (requester kinds; agent self-feedback recorded at weight 0 and flagged per §6.4) applied in aggregation; aggregates report unique-requester counts next to raw counts.
  • Decision wiring produces NOMINATIONS ONLY: retention candidates and ranking-change candidates surfaced via the weekly report (§7 acting rules). No automated deletion or weight change ships in this follow-on — ranking changes still go through the eval harness, deletions through the retention design's gates.

Acceptance

  • Sample essay feedback normalises into the §6.2 categories with raw text preserved.
  • A self-feedback case is recorded at weight 0 with the flag set.
  • The weekly report carries at least the nomination sections with unique-requester figures.

Design: doc/2026-11-10T20-41-01Z_design_atlas_retrieval_stats_feedback.md §§6–7. Filed by queue-worker triage of #6027 (task 15280).

Activity

  1. dezren39
    added
    priority/normalOrdinary priority (the default)
    area/infraInfrastructure, deployment, and operations
    kind/enhancement
    epic/atlas-programReprioritization program epic (2026-11-12)
    on Nov 14, 2026
  2. developing-today commented on Nov 14, 2026

    @developing-today
    developing-todayBot
    on Nov 14, 2026 – with developing.today
    Contributor
    More actions

    CODE-3471

  3. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 16851 BLOCKED on its merge gates (lane code-a, 2026-11-14)

    This task's spec gates the start on both predecessors being merged: "Start only when both are merged" (#9975 statistics aggregation + #9976 feedback capture).

    Checked at 2026-11-14T18:50Z: both are still OPEN —

    • atlas: statistics aggregation + weekly report (#6027 follow-on 3) #9975 — OPEN (its own task 16849 is dependency-blocked on atlas: trace ingestion + retention — statistics-and-reports source class (#6027 follow-on 2) #9974 trace ingestion)
    • atlas: feedback capture surfaces — API, CLI, UI contract (#6027 follow-on 4) #9976 — OPEN

    Task 16851 is dependency-blocked on both (fleet queue block --reason-class dependency --blocked-by-issue developing-today/code#9975,developing-today/code#9976, 3-day TTL with recheck). It re-serves when both close.

  4. developing-today
    added
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    on Nov 14, 2026
  5. github-actions
    assigned
    dezren39
    on Nov 14, 2026
  6. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status/blockedQueue or user escalation state
    queue/blockedQueue or user escalation state
    on Nov 15, 2026
  7. dezren39 commented on Nov 15, 2026

    @dezren39
    dezren39
    on Nov 15, 2026
    MemberAuthor
    More actions

    Agent note — task 16851 picked up, dependency gates CLEARED (lane any-c, 2026-11-14)

    Revalidated fresh at 2026-11-15T03:21Z:

    • Issue atlas: feedback normalisation + decision wiring, nominations only (#6027 follow-on 5) #9977 OPEN, no hard-stop labels (held / user/owned / do-not-merge / do-not-auto-edit absent). Stale queue/blocked + status/blocked from the earlier dep-block are cleared by this claim sync.
    • Gate atlas: statistics aggregation + weekly report (#6027 follow-on 3) #9975 (statistics aggregation) CLOSED 2026-11-15T01:41:51Z, status:done.
    • Gate atlas: feedback capture surfaces — API, CLI, UI contract (#6027 follow-on 4) #9976 (feedback capture) CLOSED 2026-11-15T03:14:13Z, status:done.
    • No open PR or branch owns atlas: feedback normalisation + decision wiring, nominations only (#6027 follow-on 5) #9977 work.

    Both merge gates the task spec required are now met, so implementation starts in this session: normalisation pass (design S6.2-S6.4), weighting in aggregation with unique-requester counts, and weekly-report nomination sections (S7, nominations only).

  8. developing-today
    added
    status:in-review
    on Nov 15, 2026
  9. dezren39
    added a commit that references this issue on Nov 15, 2026

    feat(atlas): feedback normalisation + decision wiring, nominations on…

    e77ed21
  10. dezren39 commented on Nov 15, 2026

    @dezren39
    dezren39
    on Nov 15, 2026
    MemberAuthor
    More actions

    Agent note — task 16851 DONE, fixed_merged (lane any-c, 2026-11-14)

    PR #10422 MERGED 2026-11-15T03:41:14Z, merge commit e77ed21 (verified on origin/main).

    What landed (design §§6.2–6.4, 7 of the #6027 doc):

    • atlas-core::feedback_normalise — atlas-feedback-normalised/v1 derivatives over the raw store (raw preserved verbatim, invariant 4; per-day regeneration), deterministic §6.2 category classifier, first-sentence summary, about_chunk_id; vote-only/superseded records skip the pass. CLI: atlas traces normalise.
    • Aggregation (§§6.3–6.4): agent self-feedback flagged at weight 0 in its own self_feedback_votes counter (excluded from weighted thumbs, categories, unique-requester figures); identical comments from one requester collapsed per embed in category counts; per-embed normalised_categories; per-query votes (chunk_id: null) aggregate at window level with missing_result_votes.
    • Weekly report §7 wiring, nominations only: retention_reingest_candidate (stale-content), content_review_candidate (wrong-content), ranking_change_candidate (recurring ranking-too-low, eval-gated), self_feedback_process_finding, ingestion_candidate (per-query missing-result) — details name unique-requester figures; markdown gained the feedback table. No automated deletion/ranking/weight change.

    Acceptance: sample essays → §6.2 categories with raw preserved (tests); self-feedback weight 0 + flag (tests + CLI smoke); weekly report nomination sections with unique-requester figures (tests + smoke).

    Tests: atlas-core 102 passed, atlas-search 41 + 11 passed (cargo test, post-fmt re-run green). CLI smoke on a temp fixture: normalise 3 raw → 3 derivatives (1 self-feedback at weight 0.0); report nominated retention_reingest + ingestion. Codex review on PR #10422 failed on Codex usage limits with zero findings — dispositioned on the PR (comment 6888689729).

    This was follow-on 5 of 5 — with follow-on 3 (#9975) and follow-on 4 (#9976) already closed, the #6027 design split is now fully implemented.

  11. dezren39
    added
    status:done
    and removed
    status:in-review
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 15, 2026
  12. dezren39
    closed this as completedon Nov 15, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

area/infraInfrastructure, deployment, and operationsepic/atlas-programReprioritization program epic (2026-11-12)kind/enhancementpriority/normalOrdinary priority (the default)status:done

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.