GeezerVison is showing github.com — Show the last-updated time in the generated gh-pages docs? · Issue #385 · googleapis/google-cloud-node
Show the last-updated time in the generated gh-pages docs? #385Labels 🚨This issue needs some love.triage meI really want to be triaged. DescriptionI know we have the version history, but it'd be really cool if we could see the date that the docs were last updated. Any chance we can put that into the travis deployment build? Activitystephenplusplus commented on Feb 9, 2015 The site displays docs for the latest tagged version by default, so the last built date will always be the date of the latest version's release. We could use the GitHub api to get information that should work. For example, we can filter through https://api.github.com/repos/googlecloudplatform/gcloud-node/releases for the matching version and get the date.
We could also probably make the active version more noticeable as well as clickable to take the user to the GH release page. ryanseys commented on Feb 9, 2015 stephenplusplus commented on Feb 9, 2015 I think the most useful date to show on our docs is the one that matches when the version was released. Unless you meant we can fish through the commits to gh-pages to find some kind of indicator of a release's build? ryanseys commented on Feb 9, 2015 Nope I meant the latest commit as per @jgeewax request for "date that the docs were last updated" which would coincide with the last push, regardless of release. If this is not what @jgeewax meant, then release date works for me. jgeewax commented on Feb 10, 2015 ContributorAuthor More actions OK so -- two scenarios I see:
- I'm using version x.y -- I want to see the docs for x.y (and honestly, the date doesn't really matter... the version is the important piece).
- I'm using master -- I want to see the docs for master (at which point, the date and/or last commit ID matter a bunch, the version not so much...)
For the first case, I think we're covered. This issue is to cover the second case. Can we make "master" also include a commit ID and date of the commit? Or is that a stupid amount of work? added 2 commits that reference this issue on Feb 16, 2015This issue will close once commit 3ad850d is merged into the 'master' branch.3ad850d This issue will close once commit 16123dc is merged into the 'master' branch.16123dc stephenplusplus commented on Feb 16, 2015 added a commit that references this issue on Feb 16, 2015This issue will close once commit ace863b is merged into the 'main' branch.ace863b added a commit that references this issue on Mar 18, 2026This issue will close once commit 4f0fed4 is merged into the 'main' branch.4f0fed4
MetadataMetadata🚨This issue needs some love.triage meI really want to be triaged. DevelopmentNo branches or pull requestsIssue actions
|