GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — GitHub - mit-crpg/TIMCAT

BranchesTags
Open more actions menu

Latest commit

 

History

50 Commits
50 Commits

Folders and files

NameName
Last commit message
Last commit date
ncet
ncet
 
 
.gitignore
.gitignore
 
 
LICENSE.txt
LICENSE.txt
 
 
PWR12_ME_inflated_reduced.csv
PWR12_ME_inflated_reduced.csv
 
 
building_template.csv
building_template.csv
 
 
cost_sensitivity.py
cost_sensitivity.py
 
 
input_CostOverrun.csv
input_CostOverrun.csv
 
 
input_LaborIndices.csv
input_LaborIndices.csv
 
 
input_MaterialIndices.csv
input_MaterialIndices.csv
 
 
input_scaling_exponents.xlsx
input_scaling_exponents.xlsx
 
 
inputfile_LPSR.xlsx
inputfile_LPSR.xlsx
 
 
inputfile_MMNC_12_77.xlsx
inputfile_MMNC_12_77.xlsx
 
 
inputfile_PWR12ME.xlsx
inputfile_PWR12ME.xlsx
 
 
readme.md
readme.md
 
 
scheduler_table.csv
scheduler_table.csv
 
 
setup.py
setup.py
 
 

Repository files navigation

What is TIMCAT?

TIMCAT hosts Nuclear Cost Estimation Tool (NCET)

Citation: Stewart W.R., Shirvan K., "Capital cost estimation for advanced nuclear power plants," Renewable and Sustainable Energy Reviews, Nov. 2021, 111880 https://doi.org/10.1016/j.rser.2021.111880

For more info and access to other already modeled plants contact: Prof. Koroush Shirvan [email protected]

Acknowledgements

This work has been primarily supported by Fortum, www.fortum.com.

Partial financial support by Department of Energy: Nuclear Energy University Program (DOE-NE0008989), ARC-20 (DE-NE0009049) and ARPA-E (DEAR0000978) and by Électricité De France (EDF).

Quick Install

Use python 3.9

Be sure to update your pip installer which is a python installer:

pip3 install --upgrade pip

To install TIMCAT, git clone this package into your preferred location:

gh repo clone mit-crpg/TIMCAT

Installing for the first time use which looks at the setup.py file and installs the packages. Run with sudo. If you use other packages in the code, add the required package to the setup.py file so it will install.

pip3 install .

To update, simply reinstall with pip from the TIMCAT directory:

pip3 install . --upgrade

(And to uninstall, simply run: pip3 uninstall TIMCAT)

Usage

As configured, TIMCAT is run by editing input files and their names in cost_sensitivity.py and running cost_sensitivity.py.

You must specify the basis table, and the input files. Edit these lines in cost_sensitivity.py:

plant = "PWR12ME"
BASIS_FNAME = (
    "PATHTOFILE/PWR12_ME_inflated_reduced.csv"
)
plant_fname = "inputfile_" + plant + ".xlsx"

File descriptions

"PWR12_ME_inflated_reduced.csv"

This is the reference cost data for the PWR12-ME plant. Costs were inflated from 1987 USD in EEDB to 2018 USD.

"inputfile_PWR12ME.xlsx"

This is the input file template for estimating the costs of a new plant. There are 9 tabs: 6 for direct cost categories, 1 for learning inputs, 1 for modularization inputs, and 1 for general plant characteristics.

"input_scaling_exponents.xlsx"

This is the input file for the cost scaling model parameters. The reference values are recommended, but the user is welcome to use their own parameters.

"input_LaborIndices.csv", "input_MaterialIndices.csv", "input_CostOverrun.csv"

These were the scaling matrices used to escalate the EEDB reference costs from 1987 to 2018 USD, and from the PWR12-BetterExperience to the PWR12-Median Experience. They are not called explicitly in the code, except the labor indices are called if steel plate composites are used. Future additions to the code that include new cost items can use this as a sample template.

"building_template.csv", "scheduler_table.csv"

These are template files to organize the output data to run the construction scheduler which is a separate code.

References

The source cost data was from the Economic Energy Data Base published by the US DOE in 1987. The full dataset can be requested here: https://rsicc.ornl.gov/codes/psr/psr5/psr-531.html

Stewart W.R., Shirvan K., "Capital cost estimation for advanced nuclear power plants," Renewable and Sustainable Energy Reviews, Nov. 2021, 111880 https://doi.org/10.1016/j.rser.2021.111880

Preprints:

https://osf.io/erm3g/download

https://osf.io/j45aw/download

License

TIMCAT is approved for distribution under the MIT license.

About

No description, website, or topics provided.

Resources

Readme
License
Activity
Custom properties

Stars

23 stars

Watchers

14 watching

Forks

17 forks
Report repository

Releases

Packages

Used by

Contributors

Languages

You are visitor 01402775 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.