IEC 61131-3 Structured Text implementation of a Vehicle Control Unit (VCU) charging subsystem for electric vehicles. Written for IEC 61131-3 PLC runtimes, this project manages the complete DC and AC charge session lifecycle — from cable insertion through energy transfer to safe disconnect.
Each external device owns a struct in the Global Variable List with explicit rx / tx separation:
| Instance | Type | Role |
|---|---|---|
g_bms |
ST_Bms |
Battery Management System — pack measurements, cell data, contactor feedback, charge limits |
g_evse |
ST_Evse |
Electric Vehicle Supply Equipment — charger status, metering, protocol negotiation |
g_charge |
ST_ChargeSession |
Internal session state — computed by state machine, not tied to a CAN device |
g_vcu |
ST_Vcu |
Vehicle-level signals — control pilot, parking brake, thermal management |
All CAN communication uses J1939 extended 29-bit identifiers with little-endian (Intel) byte order.
Types/ Enums, structs and GVL (CAN IDs, constants)
Communication/ CAN RX decode (8 msgs) and TX encode (5 msgs)
Control/ Charging state machine, DC and AC charge control
Safety/ HV contactor monitoring and weld detection
tests/ Scenario tests, simulated BMS/EVSE and platform mocks
| State | Purpose |
|---|---|
| IDLE | All outputs safe. Waits for CP State B + parking brake |
| CONNECTED | Cable locked. Waits for CP State C + BMS/EVSE comms alive |
| NEGOTIATE | Latches protocol, determines DC/AC mode from EVSE capabilities. 10s timeout |
| ISOLATE | Waits for EVSE insulation test. DC → precharge, AC → direct to active. 30s timeout |
| PRECHARGE | 6-step DC bus voltage equalization with 50ms settle re-check. 5s global timeout |
| ACTIVE | CC-CV charge control with energy accumulation and thermal derating |
| RAMPDOWN | Linear current ramp-down to zero over 2 seconds |
| WELD_CHECK | Opens all contactors, waits 200ms, checks for welded contacts |
| COMPLETE | Charge finished normally. Waits for cable removal |
| ABORT | Emergency safe state. All contactors open, waits for cable removal |
| PAUSED | Entered while g_charge.pauseRequest is set (grid/user). Zero current, contactors held. Resumes when the request clears |
The precharge sub-state machine equalizes the HV bus voltage to the battery pack voltage before closing the main contactors, preventing inrush current damage.
The active charge state implements a standard Constant Current – Constant Voltage algorithm:
- CC Phase: Charges at
MIN(BMS_limit, mode_limit, EVSE_limit) × derateFactor/100until any cell reaches 4150 mV - CV Phase: Holds voltage at 420V while current tapers naturally. Completes when taper current falls below 2A
- Hard cutoff: Any cell reaching 4200 mV forces immediate ramp-down
Energy accumulation: E += V × I × dt / 3,600,000 (W·s → kWh) computed every 10ms cycle.
| Bus | Device | Messages | Cycle |
|---|---|---|---|
| CAN3 | BMS | 5 RX + 2 TX | RX: event, TX: 50ms / 100ms |
| CAN4 | EVSE | 3 RX + 3 TX | RX: event, TX: 100ms / 250ms |
- Encoding: little-endian; voltage and current 0.1/bit, current offset −3200 A, temperature offset −40 °C
- Watchdogs: BMS 500 ms, EVSE 1000 ms, rollover-safe; losing either link at any point after CONNECTED triggers ABORT
- Contactor monitoring runs on its own safety task: 150 ms feedback timeout on close and open
- Weld detection latches if a contactor stays closed after an open command (or the BMS reports a weld), forces all contactors open, and blocks new sessions until power cycle
- Precharge re-checks the bus voltage after 50 ms before closing K1
- Strict enums (
{attribute 'strict'}) give compile-time type safety
The controller is verified off-target with the open-source RuSTy IEC 61131-3 compiler. tests/run.sh compiles the real sources together with mocks for the platform libraries and runs them cycle by cycle against a simulated BMS and EVSE that talk to the VCU only through CAN frames.
tests/run.sh
Scenarios cover a full DC session (including contactor order), AC mode, CC→CV transition, pause/resume, comm loss during precharge and while charging, negotiation and precharge timeouts, the alive counter, and weld detection. The same tests run in GitHub Actions on every push.
| Standard | Application |
|---|---|
| IEC 61851-1 | Control Pilot state machine (CP states A–F) |
| IEC 61131-3 | Structured Text programming language |
| DIN 70121 | DC charging communication protocol |
| ISO 15118 | Plug & Charge, bidirectional communication |
| SAE J1939 | CAN extended frame format (29-bit identifiers) |
- Target: IEC 61131-3 PLC runtime — not yet run on target hardware
- Libraries: a vendor CAN library providing
CanRx/CanTx, and OSCAT forT_PLC_MS - Language: IEC 61131-3 Structured Text
- Task configuration: CycleCharge (10ms) for control logic, CycleSafety (10ms) for contactor monitoring
- POU type: All modules are
PROGRAM(singleton instances)