GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — Build software better, together

#

interconnection-queue

Star

Here are 15 public repositories matching this topic...

Language: All
Filter by language
All 15 TypeScript 5 Python 4 JavaScript 2 HTML 1 Rust 1 TeX 1
Sort: Most stars
Sort options
Most stars Fewest stars Most forks Fewest forks Recently updated Least recently updated
dchub-mcp-server

azmartone67 / dchub-mcp-server

Star 3

The orchestration layer for data center and energy intelligence. Find power. Find land. Find fiber. Find capacity. Live grid, interconnection, fiber, site and market data for AI agents, including the Data Center Power Index (DCPI). Start with execute_plan. Remote MCP at https://dchub.cloud/mcp. Query and cite (CC-BY-4.0).

energy mcp data-center orchestration fiber datacenter site-selection natural-gas capacity electricity-prices colocation power-grid model-context-protocol mcp-server gemini-cli-extension interconnection-queue data-center-capacity pocket-listings powered-land data-center-power-index
  • Updated Nov 28, 2026
  • JavaScript

tadewald-trent / storage-interconnection-analysis

Star 0

Which grid region should a storage developer file in? Interconnection queue analysis of 1,538 storage projects (Berkeley Lab data).

google-sheets data-analytics energy-storage energy-markets interconnection-queue
  • Updated Nov 19, 2026
grid-crunch

owgreen-dev / grid-crunch

Star 0

Competing-risks survival analysis of 38,201 US interconnection-queue requests (LBNL): who gets built is predictable on day one (AUC 0.72, 3.7x top-decile lift) — who withdraws is a post-entry story.

machine-learning energy scikit-learn survival-analysis competing-risks duckdb interconnection-queue
  • Updated Jul 19, 2026
  • Python

beingRealFrank / queue-ledger

Star 0

Daily point-in-time archive of US power-plant pipelines (EIA-860M, CAISO, SPP) with SHA-256 provenance and change history

open-data dataset spp eia energy-data renewable-energy caiso power-grid power-plants interconnection-queue eia-860m
  • Updated Nov 27, 2026
  • Python

AnonRish / continental-load-registry

Star 0

Public registry of large-load grid interconnection requests, with a conservative bound on residual compute (AI 2040 Plan A, Track 3).

open-data electricity-grid data-centers compute-governance interconnection-queue
  • Updated Nov 22, 2026
  • HTML

kardashev-lab / site-clearance

Sponsor
Star 0

ERCOT Site Clearance: draw a search area, score county-level queue pressure, peer timelines, and market stress

map open-source typescript energy nextjs gis texas lmp power-grid ercot maplibre interconnection-queue kardashev-labs
  • Updated Aug 15, 2026
  • TypeScript

kardashev-lab / large-load-tracker

Sponsor
Star 0

ERCOT large-load interconnection queue tracker: history, zone scorecards, and Batch Zero explainer

typescript energy dashboard nextjs texas datacenter power-grid ercot interconnection-queue kardashev-labs large-load
  • Updated Aug 15, 2026
  • TypeScript

johncarmack1984 / interconnection-atlas

Sponsor
Star 0

Interactive D3 map of US grid interconnection: a hosting-capacity choropleth with the interconnection queue and ISO/RTO territories overlaid (synthetic demo data).

react d3 topojson typescript energy grid geospatial data-visualization choropleth renewable-energy interconnection-queue eia-860m
  • Updated Nov 1, 2026
  • TypeScript

Noah-Parsons / western-queue-reporting

Star 0

Is Berkeley Lab's median withdrawal time for the non-ISO West representative, when only 636 of 5,277 withdrawals report a date? The reporting subset differs sharply, but reweighting moves the median under three months and the direction is not identified. R analysis and paper.

r open-data electricity energy-data interconnection-queue
  • Updated Oct 23, 2026
  • TeX

kardashev-lab / kardashev-mcp

Sponsor
Star 0

MCP server for Kardashev Labs US grid data - LMP, carbon, load, queues, ERCOT large loads, RT−DA spread forecasts. No API key.

open-source typescript energy mcp open-data forecasting energy-data lmp carbon-intensity power-grid ercot ai-agent model-context-protocol mcp-server interconnection-queue kardashev-labs
  • Updated Sep 15, 2026
  • TypeScript

omari91 / rt-grid-screening-agent

Star 0

Physics-grounded LV/MV/HV grid connection screening agent & MCP server: OpenDSS AC power flow, N-1 SCR, AS/NZS 4777.2 droop, and SHA-256 audit receipts.

python mcp power-systems opendss fastapi hosting-capacity agentic-ai model-context-protocol mcp-server grid-connection australian-energy-market interconnection-queue
  • Updated Nov 6, 2026
  • Python

kardashev-lab / interconnection-queue-tracker

Sponsor
Star 0

Search generator interconnection queue projects across US ISOs/RTOs - the public list of power projects waiting to connect to the grid.

open-source energy dashboard nextjs spp miso caiso nyiso isone pjm power-grid ercot interconnection-queue kardashev-labs
  • Updated Sep 5, 2026
  • TypeScript

bakulbadwal / interconnection-queue-lab

Star 0

What the grid interconnection queue means for AI power: odds a project connects, wait distributions, the cost of delay, and ways around the line. Built on LBNL Queued Up data.

energy teaching survival-analysis data-centers power-grid interconnection-queue
  • Updated Oct 22, 2026
  • JavaScript

kakashi3lite / firmgap

Sponsor
Star 0

Interim non-firm grid energization & curtailment economics simulator for AI data centers: BESS sizing, workload throttling, SLA risk, interconnection-queue delay cost. Rust CLI + web.

rust cli grid simulation data-center power-systems energy-storage lmp demand-response bess battery-storage energy-economics techno-economic-analysis flexible-load curtailment ai-infrastructure load-flexibility interconnection-queue non-firm datacenter-energy
  • Updated Nov 22, 2026
  • Rust

HugoFara / complements-in-the-queue-replication

Sponsor
Star 0

Replication material for "Complements in the Queue: What Re-Studying Recovers, and What Only a Joint Interconnection Study Can" — a joint interconnection-allocation engine measuring what segregated generation/load study tracks cost on distribution feeders.

reproducible-research optimization research-paper power-systems mixed-integer-programming power-flow opendss pandapower distribution-networks replication-package hosting-capacity interconnection-queue
  • Updated Oct 25, 2026
  • Python

Add this topic to your repo

To associate your repository with the interconnection-queue topic, visit your repo's landing page and select "manage topics."

Learn more

You are visitor 01402775 — GeezerVison does not store the pages you look up.
Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.