GeezerVisonThe World Wide Web, restored to 800 pixels of glory. | |||||||||||||||||||||||||||
| Home|About|Gaming cabinet|Archives|How it works|Starter sites | |||||||||||||||||||||||||||
GeezerVison is showing www.alanhamby.com — Tiger I Information Center - The Henschel Tiger Factory Page 3
At this point Step 6 began and the Tiger was painted, but only the lower hull and sides. Then it was on to Step 7 in which the Tiger was taken on a test drive. Any problems during the automotive tests were noted and repaired before the Tiger went on to Step 8. In this step the final equipment fitting took place the most notable of which was the attachment of the turret to the hull.
Step 9 consisted of the final painting of the Tiger and later in the war the application of Zimmerit. Henschel did not apply camouflage paint jobs at the factory. At this point the completed Tiger was ready for delivery.
During the war the city of Kassel was bombed some 40 times by the Allies. This disrupted Tiger production, most notably in late 1943 when during the night of October 22/23 the RAF dropped 1800 tons of bombs causing severe damage at the Henschel facilities as well as killing or injuring a good portion of its workforce. Yet production continued right up until the end. The U.S. Third Army began the battle to capture Kassel on April 1, 1945 and, as they approached, the Henschel factory completed work on 13 Tiger II tanks which were handed directly over to two companies of schwere Panzer-Abteilung 510 and 511. Three days later at 1200 hours on April 4, 1945 the city was surrendered and Henschel Tiger production was forever ended.
| |||||||||||||||||||||||||||
| You are visitor 01402503 — GeezerVison does not store the pages you look up. Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required. |