GeezerVison is showing github.com — epic(cluster): storage assembly & design validation · Issue #1085 · developing-today/code
epic(cluster): storage assembly & design validation #1085Labels area/infraInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)epic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesqueue/blockedQueue or user escalation statesource/creatorFiled by the new-issue-creator jobstatus/blockedQueue or user escalation statetask/triageQueue packet kind: verify, reproduce, and route this itemwork/assignedQueue worker lifecycle state DescriptionStorage assembly & design validation
Purpose
The sketched storage tiers become real, tested pools with per-drive records.
Scope
Validate then build: HDD tier 3 hosts x 4x16 TB RAID 10 for RustFS cold buckets; fast NVMe tier (all Samsung 990s); mid tier striped x3 / mirrored x2 'RAID 100'. Install the 8 still-boxed HDDs and capture their baseline SMART/firmware data (NVMe baseline already exists on a backup drive). Per-drive records/passports so TALM and LINSTOR decisions have real data.
Execution mode
Physical: drive installation and machine assembly are hands-on; design validation, benchmarks, and record-keeping online. Physical tasks must state location, tools, and verification (photo/SMART output).
Dependencies
Depends on epics 1 (selection) and 3 (power). Feeds epics 6 and 8.
Acceptance
Design validated or revised in writing; first-node drives installed with baseline data recorded; pool layout per first node committed as config, not folklore.
Structure
Part of the basement cluster program. Project home: planning/roadmaps/basement-cluster.md in this repo. Full program register: goal workspace files/idea-register-2026-10-20.md (Muse goal goal_ba17a5777c21). Detailed task issues are filed as sub-issues of this epic; dependencies use blocks / blocked-by links.
Hard rules for the whole program: no HashiCorp anything; everything bootstrappable from config, no hand-built state. Activityadded area/infraInfrastructure, deployment, and operations epicMeta-issue grouping multiple items (org Project Type=Epic) effort/lLarge: multi-day or open-ended; expect staged check-ins meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added on Oct 27, 2026developing-today commented on Oct 27, 2026 dezren39 commented on Oct 27, 2026 Epic map — basement cluster program
| # |
Epic |
Issue |
| 1 |
Hardware inventory & first-node selection |
#1080 |
| 2 |
Firmware / BIOS / BMC audit |
#1081 |
| 3 |
Basement power & space |
#1083 |
| 4 |
Network fabric |
#1084 |
| 5 |
Storage assembly & validation |
#1085 |
| 6 |
TALM + Talos bootstrap |
#1086 |
| 7 |
Cozystack platform |
#1087 |
| 8 |
Platform services |
#1088 |
| 9 |
Observability, backup & recovery |
#1090 |
| 10 |
Cloud extension (OCI & egress) |
#1091 |
| 11 |
First workload: ID app |
#1092 |
| 12 |
ESP32 wing |
#1093 |
This epic: #1085 — Storage assembly & validation
Dependencies: Blocked by #1080, #1083; feeds #1086, #1088
Filed in the 2026-10-26 cluster seed. Project home: planning/roadmaps/basement-cluster.md. dezren39 commented on Oct 27, 2026 Predecessor: this epic supersedes dezren39/darwin-nix#504 (filed 2026-10-20 in the nix repo during the program's first filing pass). A superseded-pointer comment is on that issue; work happens here. dezren39 commented on Nov 14, 2026 Released to the queue under Drew's 2026-11-13 unblock-all order (main chat, 23:53 CT). Task(s) 13759 moved from blocked/parked to queued in the fleet unblock-all pass (worker main-unblock-all-2026-11-13). Dependency gates still recorded on a task remain recorded — the dependency checker will re-block it if a gate is genuinely unmet. dezren39 commented on Nov 14, 2026 agent-note:v1 — task 13759, lane code-c, state: blocked (verified, no queue-workable remainder)
Triage verdict for epic #1085 — seventh confirmation of the same verdict (prior: task 12558 note, 2026-11-08; task 13759 by lane code-g, 2026-11-08T23:53Z; this task returned to the pool only via Drew's 2026-11-13 unblock-all, and is re-blocked now with the dependency recorded structurally so the gate survives).
Re-verified fresh 2026-11-14T18:27Z:
- Issue epic(cluster): storage assembly & design validation #1085 is OPEN, an epic with
mode/physical: its scope is hands-on work at the machines — install the 8 still-boxed HDDs, capture baseline SMART/firmware data, assemble the tiers. No lane can do any of that from the queue.
- What has landed is documentation only (PR docs(basement-cluster): link filed epic issues in roadmap #1109 roadmap links; PR docs(aggregator): lab-cluster reflects nix#501-508 predecessors + Grist disagreement (#1124) #2397 lab-cluster doc refresh). None of the acceptance criteria are met by landed work: no written design validation/revision, no first-node drives installed with baselines recorded, no pool layout committed as config.
- The epic depends on epics 1 and 3 by its own body. Predecessor epic(cluster): hardware inventory & first-node selection #1080 (epic 1: hardware inventory & first-node selection) is OPEN with
user/escalated + status/blocked — the gate ahead of this epic is real, current, and the user's.
- Remainder, confirmed against current state: (1) predecessor epic(cluster): hardware inventory & first-node selection #1080 resolved on-site; (2) physical installation + SMART/firmware baselines (hands-on, with photo/SMART verification per the epic's execution mode); (3) pool layout for the first node committed as config. None of it converts to a code
small_fix packet a lane can execute, so no follow-on fix packet is filed — filing one would be fiction.
Disposition: task 13759 is dep-blocked on issue #1080 (broker-recorded; auto-returns if #1080 closes, 3-day TTL with rechecks). The epic itself stays open and user-owned in substance: it moves when the hardware work happens on-site, not when a lane re-reads it. Future triage passes can cite this note instead of re-deriving it.
dezren39 commented on Nov 17, 2026 agent-note:v1 — triage (queue task 18058, openchamber scheduled lane code-g)\n\nFresh check: #1085 remains OPEN and /. Its stated dependencies are hardware-selection epic #1080 and power/space epic #1083; both remain open, and #1080 is user/escalated while #1083 is user/owned physical work. Storage assembly also requires installing boxed HDDs and physical SMART/firmware capture. No storage work started; preserving the existing blocked state and escalating the dependency chain rather than creating a duplicate implementation task. dezren39 commented on Nov 18, 2026
Fresh re-triage 2026-11-18 09:54 UTC: #1085 remains OPEN and is a physical-mode storage assembly epic. Its dependencies #1080 (hardware inventory/first-node selection; OPEN, status/blocked + user/escalated) and #1083 (basement power/space; OPEN, user/owned) are unresolved. Remaining work requires on-site drive installation, SMART/firmware baselines, and committing the chosen pool layout after the hardware gate. No code-only remainder can be assigned honestly. Resume after the user-owned physical prerequisites clear; then scope any declarative/config work separately. dezren39 commented on Nov 18, 2026 agent-note:v1 — task 13759, lane code-g, state: blocked (fresh verification)
Fresh check 2026-11-18: #1085 remains OPEN, physical-mode, and has no queue-workable code remainder. Its predecessor #1080 remains OPEN with status/blocked + user/escalated; #1083 remains OPEN with user/owned. Latest prior verification on #1085 is comment 6975039332 (2026-11-18 09:53 UTC), and the issue labels still show status/blocked + queue/blocked. Remaining acceptance requires user-owned hardware selection/power and on-site drive installation, SMART/firmware capture, then pool layout. No fix packet is appropriate.
Disposition: block task 13759 on issue #1080; resume only after the user-owned prerequisites clear, then scope any declarative/config work separately.
dezren39 commented on Nov 21, 2026
Fresh re-triage 2026-11-21: #1085 remains OPEN with status/blocked, queue/blocked, and mode/physical. Rechecked prerequisites: #1080 is OPEN with user/escalated; #1083 is OPEN with user/owned and mode/physical. Remaining acceptance still needs the user-led hardware inventory/power work, on-site installation of the boxed HDDs, SMART/firmware baselines, and then a pool layout committed as config. There is no queue-workable code remainder, so no fix packet was created.
Task 13759 is dependency-blocked on #1080; #1083 and physical installation remain explicit context. Resume after the user-owned prerequisites clear, then split/scope actionable child work and any declarative/config slice separately. dezren39 commented on Nov 24, 2026 Triage (oc-code-01, 2026-11-24): this epic is marked Physical. Installing the 8 boxed HDDs, capturing SMART/firmware baselines and assembling the RAID tiers are hands-on, so no code packet applies. The online parts (design validation, benchmarks, per-drive records) need the hardware present first. Left open as a hands item for the operator.
MetadataMetadataarea/infraInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)epic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesqueue/blockedQueue or user escalation statesource/creatorFiled by the new-issue-creator jobstatus/blockedQueue or user escalation statetask/triageQueue packet kind: verify, reproduce, and route this itemwork/assignedQueue worker lifecycle state DevelopmentNo branches or pull requestsIssue actions
|