GeezerVison is showing github.com — epic(cluster): basement power & space · Issue #1083 · developing-today/code

epic(cluster): basement power & space #1083

New issue
Copy link
New issue
Copy link
Open
1 / 41 of 4 issues completed
Open
epic(cluster): basement power & space#1083
1 / 41 of 4 issues completed
Copy link
Labels
area/infraInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)epic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesstatus/needs-triageNot yet triaged; needs a first lookuser/ownedA user is personally driving this; automation stays out
Milestone
Lab cluster program

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

Basement power & space

Purpose

Power and physical space stop being the blocker for running the fleet.

Scope

Dedicated 20A circuits, each on its own breaker, from the panel across the unfinished basement to the server room (separate tracked goal: basement electrician). Basement cleanup and a rack/layout plan for the first 3-5 machines first, the full ~12 as the long tail. UPS strategy recorded.

Execution mode

Physical: electrician work and cleanup are hands-on and Drew-owned; agents prepare specs, get quotes, and track scheduling online.

Dependencies

Gates running more than a couple of machines at once; epics 5 and 6 need at least the first-node power in place.

Acceptance

Electrician engaged with the circuit spec; first circuits installed and verified; a layout plan for the first 3-5 machines exists and the space for them is clear.

Structure

Part of the basement cluster program. Project home: planning/roadmaps/basement-cluster.md in this repo. Full program register: goal workspace files/idea-register-2026-10-20.md (Muse goal goal_ba17a5777c21). Detailed task issues are filed as sub-issues of this epic; dependencies use blocks / blocked-by links.

Hard rules for the whole program: no HashiCorp anything; everything bootstrappable from config, no hand-built state.

Sub-issues

Collapse Sub-issuesSub-issues

1 of 41 of 4 Issues completed
Loading 4 sub-issues

Activity

  1. dezren39
    added
    status/needs-triageNot yet triaged; needs a first look
    user/ownedA user is personally driving this; automation stays out
    area/infraInfrastructure, deployment, and operations
    epicMeta-issue grouping multiple items (org Project Type=Epic)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    mode/physicalNeeds physical hands on site: build, install, cable, or configure devices
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-224

  3. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  4. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Epic map — basement cluster program

    # Epic Issue
    1 Hardware inventory & first-node selection #1080
    2 Firmware / BIOS / BMC audit #1081
    3 Basement power & space #1083
    4 Network fabric #1084
    5 Storage assembly & validation #1085
    6 TALM + Talos bootstrap #1086
    7 Cozystack platform #1087
    8 Platform services #1088
    9 Observability, backup & recovery #1090
    10 Cloud extension (OCI & egress) #1091
    11 First workload: ID app #1092
    12 ESP32 wing #1093

    This epic: #1083 — Basement power & space
    Dependencies: Gates fleet power; feeds #1085, #1086

    Filed in the 2026-10-26 cluster seed. Project home: planning/roadmaps/basement-cluster.md.

  5. dezren39
    added sub-issues on Oct 27, 2026
    • task(cluster): circuit spec + electrician brief #1103
    • task(cluster): engage an electrician (quotes + schedule) #1104
    • task(cluster): install and verify the dedicated 20A circuits #1105
    • task(cluster): basement cleanup + rack layout for the first nodes #1106
  6. dezren39
    added a commit that references this issue on Oct 27, 2026

    docs(basement-cluster): link filed epic issues in roadmap

    914043d
  7. dezren39
    marked this as blocking 2 issues on Nov 1, 2026
    • epic(cluster): storage assembly & design validation #1085
    • epic(cluster): TALM + Talos bootstrap #1086
  8. dezren39 commented on Nov 3, 2026

    @dezren39
    dezren39
    on Nov 3, 2026
    MemberAuthor
    More actions

    Program tending — epic status (2026-11-03, via #1352)

    This epic has had no activity in 7+ days: the epic and its open sub-issues were last touched 2026-10-27, while its sibling cluster epics all received fleet activity today.

    • What moved last: sub-issue task(cluster): circuit spec + electrician brief #1103 is closed; task(cluster): engage an electrician (quotes + schedule) #1104, task(cluster): install and verify the dedicated 20A circuits #1105 and task(cluster): basement cleanup + rack layout for the first nodes #1106 remain open and untouched since 2026-10-27T03:19Z.
    • What's next (per the epic's own acceptance): an electrician engaged with the dedicated-20A circuit spec (tracked separately as the basement-electrician goal), then first circuits installed/verified and the layout plan for the first 3–5 machines.
    • What's blocked: execution is physical and Drew-owned (electrician work, basement cleanup) — there is no fleet-actionable unblock to enqueue; agents prepare specs/quotes and track scheduling. This epic also gates cluster epics 5 and 6, which need at least first-node power in place.

    Status recorded so the stall is visible, not silent. No closure proposed — acceptance is unmet.

  9. dezren39
    added
    epic/lab-clusterEpic: lab-cluster - all issues of this effort carry it
    on Nov 12, 2026
  10. dezren39
    modified the milestones: Lab cluster, Lab cluster program on Nov 12, 2026
  11. dezren39
    removed their assignment
    on Nov 20, 2026
  12. dezren39 commented on Nov 27, 2026

    @dezren39
    dezren39
    on Nov 27, 2026
    MemberAuthor
    More actions

    Program-tending status check-in (2026-11-27) — this epic has had no activity since 2026-11-20 (7+ days), so the tender is recording where it stands.

    • Sub-issues: 1 of 4 closed. Still open: task(cluster): engage an electrician (quotes + schedule) #1104 (engage an electrician — quotes + schedule, untouched since 2026-11-20), task(cluster): install and verify the dedicated 20A circuits #1105 (install and verify the dedicated 20A circuits, untouched since 2026-11-20), task(cluster): basement cleanup + rack layout for the first nodes #1106 (basement cleanup + rack layout for the first nodes, last activity 2026-11-22).
    • What moved last: task(cluster): basement cleanup + rack layout for the first nodes #1106 on 2026-11-22; nothing since.
    • What's next, per this epic's own acceptance: an electrician engaged with the circuit spec (task(cluster): engage an electrician (quotes + schedule) #1104) is the first acceptance item and gates the rest — the circuits (task(cluster): install and verify the dedicated 20A circuits #1105) and the layout/space work (task(cluster): basement cleanup + rack layout for the first nodes #1106) follow it.
    • Blocked on: this programme is physical and Drew-owned by its own execution mode (agents prepare specs, get quotes, and track scheduling) — there is no fleet-actionable unblock to enqueue; task(cluster): engage an electrician (quotes + schedule) #1104 is the step waiting on a human decision/schedule.

    No state change made by this comment; it exists so the stall is on the record, not silent.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area/infraInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)epic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesstatus/needs-triageNot yet triaged; needs a first lookuser/ownedA user is personally driving this; automation stays out

    Type

    No type

    Projects

    No projects

      Milestone

      • Lab cluster programNo due date

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.