GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — task(cluster): circuit spec + electrician brief · Issue #1103 · developing-today/code

task(cluster): circuit spec + electrician brief #1103

New issue
Copy link
New issue
Copy link
Closed
Closed
task(cluster): circuit spec + electrician brief#1103
Copy link
Assignees
dezren39
Labels
area/infraInfrastructure, deployment, and operationseffort/sSmall: expected under 2 hours of workepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloud

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

Circuit spec + electrician brief

Parent epic: #1083 (basement cluster program). Project home: planning/roadmaps/basement-cluster.md.

Write the spec the electrician quotes against: a few dedicated 20A circuits, each on its own breaker, from the panel across the open/unfinished basement (past ~3 simple walls, along the ceiling) to the server room; existing cable paths may be reusable; Drew prefers direct dedicated runs over the earlier UPS-breaker drop. Include the load estimate for the first 3-5 machines and headroom for 12.

Acceptance: one-page brief ready to send; load math shown.

Activity

Next
  1. dezren39
    added
    status/needs-triageNot yet triaged; needs a first look
    area/infraInfrastructure, deployment, and operations
    effort/sSmall: expected under 2 hours of work
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    mode/onlineFully doable remotely: design, config, code, cloud
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-243

  3. dezren39
    added a parent issue on Oct 27, 2026
    • epic(cluster): basement power & space #1083
  4. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  5. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    queue/queuedHas a queued queue task
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Oct 29, 2026
  6. dezren39 commented on Oct 29, 2026

    @dezren39
    dezren39
    on Oct 29, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done (triage verdict: CONFIRMED — routed to a follow-up packet)

    • Agent: queue worker (repo-worker-code), Lane C shift
    • Session / ID: queue task 2380 (triage)
    • Found via: queue claim
    • Task: Triage task(cluster): circuit spec + electrician brief #1103 against current main and route it.
    • Verdict — CONFIRMED and routable: Verified on main 39e8410 (2026-10-29T01:57Z): no circuit spec or electrician brief exists anywhere in the repo (code search for "electrician" returns nothing), and planning/roadmaps/basement-cluster.md still lists basement power & space (epic(cluster): basement power & space #1083) as "planned". Unlike its sibling task(cluster): define the golden firmware/settings baseline #1100, this task is NOT blocked on the escalated stats work: the issue itself pins every design input (dedicated 20A circuits, own breaker each, ceiling route across the open basement past ~3 walls, reusable existing cable paths, direct runs preferred over the UPS-breaker drop, 3–5 machines now with headroom for 12). The brief can be written now as long as the per-machine draw is named as a planning assumption (measured values land later via task(cluster): gather stats - core Threadripper machines #1095) and panel specifics are listed as site-visit open items instead of invented.
    • Route: follow-up small_fix packet enqueued to repo-health-code-pilot — dedupe key repo-health:v1:fix:developing-today/code:issue:1103 — scoped to: write the one-page brief, show the load math (totals for 3–5 and for 12 machines, 80% continuous derating → 1920W usable per 20A/120V circuit, circuit count derived), list site-visit confirmations as open items, link the brief from the roadmap. Its output is what task(cluster): engage an electrician (quotes + schedule) #1104 (engage an electrician, user/owned) will send.
    • Expectation: triage done; the follow-up packet is queued (queue/queued label mirrors it still being open work).
    • Links: epic epic(cluster): basement power & space #1083 · consumer task(cluster): engage an electrician (quotes + schedule) #1104 · roadmap planning/roadmaps/basement-cluster.md
  7. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    on Oct 29, 2026
  8. 121 remaining items

  9. dezren39
    added
    status/in-progressQueue worker lifecycle state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Oct 30, 2026
  10. dezren39 commented on Oct 30, 2026

    @dezren39
    dezren39
    on Oct 30, 2026
    MemberAuthor
    More actions

    Agent note — picked up (resume)

    • Queue task: 2998 (Lane D, repo-worker-code), resuming from parked.
    • Fresh state 2026-10-30T03:05Z: PR docs(cluster): electrician brief — circuit spec for the basement cluster (#1103) #2367 still OPEN, checks PASS on afdc309, no Codex findings, and it is in the merge queue at position 21 (AWAITING_CHECKS). Polling briefly; if it lands, this task completes fixed_merged; otherwise it re-parks on the same resume condition.
  11. dezren39
    added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    and removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    on Oct 30, 2026
  12. dezren39 commented on Oct 30, 2026

    @dezren39
    dezren39
    on Oct 30, 2026
    MemberAuthor
    More actions

    Agent note — parked (merge queue)

    • Queue task: 2998 (Lane D, repo-worker-code). PR docs(cluster): electrician brief — circuit spec for the basement cluster (#1103) #2367 re-verified this shift: checks PASS on afdc309, Codex review completed with no findings, and the PR remains in the merge queue (AWAITING_CHECKS).
    • It did not land during a 5-minute poll; the merge queue is draining slowly under the repo-wide runner backlog. Task parked 20 min at 2026-10-30T03:09Z.
    • Resume: if PR docs(cluster): electrician brief — circuit spec for the basement cluster (#1103) #2367 shows MERGED, complete task 2998 as fixed_merged; if it fell out of the queue, re-enqueue it.
  13. dezren39 commented on Oct 30, 2026

    @dezren39
    dezren39
    on Oct 30, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done — brief merged

    • Agent: queue worker (repo-worker-code), OpenChamber scheduled lane (origin openchamber-scheduled-lane)
    • Task: 2998 (docs: circuit spec + electrician brief), resumed from awaiting_ci park
    • Fresh state: PR #2367 MERGED 2026-10-30T03:36:30Z at bbddddd2; all checks had passed on head afdc3097, Codex reported no findings.
    • Deliverable verified on main at bbddddd2: planning/roadmaps/basement-cluster-electrician-brief.md (56 lines) exists; planning/roadmaps/basement-cluster.md links it from the basement power/space row; load math is internally consistent (600 W/machine assumption, 1920 W usable per 20A/120V circuit → 3 machines 1800 W/1 circuit, 5 machines 3000 W/2, 12 machines 7200 W/4); route and preferences are carried in substance (dedicated runs, own breaker each, ceiling route past ~3 walls, existing paths reusable, no UPS-breaker drop); site-visit unknowns are listed as open items rather than invented.
    • Next: task(cluster): engage an electrician (quotes + schedule) #1104 (engage an electrician, user/owned) now has the brief to send; no action taken there by this lane.
    • Closing: issue closed as completed; queue labels stripped.
  14. dezren39
    closed this as completedon Oct 30, 2026
  15. dezren39
    removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    work/assignedQueue worker lifecycle state
    on Oct 30, 2026
  16. dezren39
    added
    epic/lab-clusterEpic: lab-cluster - all issues of this effort carry it
    on Nov 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

area/infraInfrastructure, deployment, and operationseffort/sSmall: expected under 2 hours of workepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloud

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.