GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — task(cluster): basement cleanup + rack layout for the first nodes · Issue #1106 · developing-today/code

task(cluster): basement cleanup + rack layout for the first nodes #1106

New issue
Copy link
New issue
Copy link
Open
Open
task(cluster): basement cleanup + rack layout for the first nodes#1106
Copy link
Labels
area/infraInfrastructure, deployment, and operationseffort/mMedium: expected under 1 day of workepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesqueue/blockedQueue or user escalation statestatus/blockedQueue or user escalation stateuser/ownedA user is personally driving this; automation stays out
Milestone
Lab cluster

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

Basement cleanup + rack layout for the first nodes

Parent epic: #1083 (basement cluster program). Project home: planning/roadmaps/basement-cluster.md.

Clear and lay out the server-room space for the first 3-5 machines per the epic 1 node selection: rack/shelf positions, cable paths, airflow, and where the boxed HDDs and spare machines stage. Layout sketch committed before anything moves.

Acceptance: layout committed; space for the first nodes clear and photographed.

Physical work notes

  • Location: basement / server room, Osseo WI.
  • Tools/parts: as listed in the task; note anything missing on this issue before starting.
  • Safety: machines unplugged before drive or cable work; circuits are electrician-only work (epic 3).
  • Verification: attach a photo of the finished state (and SMART/KVM output where relevant) to this issue before closing.

Activity

  1. dezren39
    added
    status/needs-triageNot yet triaged; needs a first look
    user/ownedA user is personally driving this; automation stays out
    area/infraInfrastructure, deployment, and operations
    effort/mMedium: expected under 1 day of work
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    mode/physicalNeeds physical hands on site: build, install, cable, or configure devices
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-246

  3. dezren39
    added a parent issue on Oct 27, 2026
    • epic(cluster): basement power & space #1083
  4. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  5. developing-today commented on Nov 8, 2026

    @developing-today
    developing-todayBot
    on Nov 8, 2026 – with developing.today
    Contributor
    More actions

    🤖 Agent note · blocked

    • Agent: queue worker (repo-worker-code, lane code-l)
    • Session / ID: task 11428
    • Found via: queue claim
    • Task: Blocked on revalidation: issue task(cluster): basement cleanup + rack layout for the first nodes #1106 carries the user/owned label — a hard stop for queue workers; the physical cluster task is Drew's to direct.
    • Expectation: task 11428 stays blocked until Drew removes user/owned or directs the work himself.
    • Links: issue task(cluster): basement cleanup + rack layout for the first nodes #1106
  6. developing-today
    added
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Nov 8, 2026
  7. dezren39
    added
    epic/lab-clusterEpic: lab-cluster - all issues of this effort carry it
    on Nov 12, 2026
  8. dezren39
    added this to the Lab cluster milestone on Nov 12, 2026
  9. dezren39 commented on Nov 16, 2026

    @dezren39
    dezren39
    on Nov 16, 2026
    MemberAuthor
    More actions

    🤖 Agent note · blocked (revalidation, no change)

    • Agent: queue worker (repo-worker-code, lane code-f)
    • Session / ID: task 11428
    • Found via: queue claim + fresh gh revalidation
    • Task: Still blocked: issue carries user/owned (hard stop) and mode/physical; the physical cluster work is Drew's to direct. Prior block note (lane code-l, 2026-11-08) is unchanged.
    • Expectation: task 11428 stays blocked until Drew removes user/owned or directs the work himself.
    • Links: issue task(cluster): basement cleanup + rack layout for the first nodes #1106
  10. dezren39
    removed their assignment
    on Nov 20, 2026
  11. dezren39 commented on Nov 22, 2026

    @dezren39
    dezren39
    on Nov 22, 2026
    MemberAuthor
    More actions

    agent-note:v1
    state: picked_up
    task: 11428
    lane: oc-code-01 (OpenChamber scheduled lane, worker repo-worker-code)
    stage: claimed → verified

    Claimed task 11428 and revalidated fresh GitHub state. Issue #1106 remains OPEN with hard-stop label user/owned, plus mode/physical, status/blocked, and queue/blocked. No task work or issue edits performed. The existing hold remains controlling.

  12. dezren39 commented on Nov 22, 2026

    @dezren39
    dezren39
    on Nov 22, 2026
    MemberAuthor
    More actions

    agent-note:v1
    state: blocked
    task: 11428
    lane: oc-code-01 (OpenChamber scheduled lane, worker repo-worker-code)
    stage: verified → blocked

    Fresh revalidation confirms #1106 remains OPEN with user/owned (hard stop) and mode/physical; queue workers must not touch it. Kept the existing hold and blocked labels unchanged. Task 11428 is blocked as escalated-to-user; no implementation or triage work was performed. Resume only if the hold is removed or Drew directs the physical work.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area/infraInfrastructure, deployment, and operationseffort/mMedium: expected under 1 day of workepic/lab-clusterEpic: lab-cluster - all issues of this effort carry itmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesqueue/blockedQueue or user escalation statestatus/blockedQueue or user escalation stateuser/ownedA user is personally driving this; automation stays out

    Type

    No type

    Projects

    No projects

      Milestone

      • Lab clusterNo due date

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.