GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — impl(atlas/id): ID-graph publication conformance audit (#6062 follow-on 5) · Issue #11186 · developing-today/code

impl(atlas/id): ID-graph publication conformance audit (#6062 follow-on 5) #11186

New issue
Copy link
New issue
Copy link
Done
#16008
#14927
Done
impl(atlas/id): ID-graph publication conformance audit (#6062 follow-on 5)#11186
#16008
#14927
Copy link
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/atlas-programReprioritization program epic (2026-11-12)

Description

@dezren39
dezren39
opened on Nov 17, 2026
Issue body actions

Implementation follow-on 5 of 5 from the #6062 design (doc/2026-11-09T07-20-00Z_design_atlas_id_publication/, §9.5), under program #6018.

Scope: conformance audit — property checks over a fixture corpus: every Atlas row projects to a complete unit (§6.4), every claim recomputes from Atlas (§6.1), corrections clear exactly the superseded claims (§6.2), retirement publishes remove + tombstone (§6.3). The oracle is recomputation from Atlas rows.

Acceptance:

  • Audit suite runs over the fixture corpus and reports per-property pass/fail.
  • Any property failure files or links a defect against the responsible projector follow-on (design(id/atlas): ID-graph publication format — Atlas objects + provenance/lineage relations as ID-graph objects #6062 follow-ons 1-3).

Parent: #6062 (design, landed via PR #7998). Program: #6018.

Activity

Next
  1. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    epic/atlas-programReprioritization program epic (2026-11-12)
    on Nov 17, 2026
  2. developing-today commented on Nov 17, 2026

    @developing-today
    developing-todayBot
    on Nov 17, 2026 – with developing.today
    Contributor
    More actions

    CODE-4085

  3. dezren39
    added a parent issue on Nov 17, 2026
    • design(id/atlas): ID-graph publication format — Atlas objects + provenance/lineage relations as ID-graph objects #6062
  4. github-actions
    assigned
    dezren39
    on Nov 17, 2026
  5. dezren39
    removed their assignment
    on Nov 20, 2026
  6. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    Verified on current origin/main (13794eaa44c): the publication design is present, but the projector implementation and fixture emissions required by this audit are not. Projector follow-ons #11182 (versions/files/relations), #11183 (attestations/runs), and #11184 (run logging/replay/backfill) remain open. Without those emissions, an audit fixture suite cannot exercise the specified recomputation, correction-clear, complete-unit, and retirement properties.

    Parked until the projector follow-ons land; resume by implementing the property checks against their fixtures and run-log pins.

  7. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    Rechecked the issue and its complete comment set, and rechecked the three required projector predecessors: #11182, #11183, and #11184 are all still open. #11186 has no competing live lane claim. The prior prerequisite is unchanged: the audit oracle depends on projector emissions plus replay/run-log fixtures, so the conformance properties still cannot be implemented honestly against current available fixtures.

    Keeping this task parked until #11182, #11183, and #11184 land on main. Resume by adding the four property checks against their fixtures and recording per-property outcomes.

  8. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    Re-verified on current origin/main (9197e54819): all three projector predecessors #11182, #11183, #11184 are still open, and no ID-graph publication conformance audit suite exists on main (only unrelated atlas-search conformance tests and generic id-crate versioning/sanctions hits). No competing live lane claim on this issue (3/3 comments read).

    Parking until the projector follow-ons land; resume by implementing the four §6.1–6.4 property checks against their fixtures and recording per-property outcomes.

  9. developing-today-fleet commented on Nov 24, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 24, 2026 – with developing.today fleet
    Contributor
    More actions

    Re-verified on current origin/main (219b6a3618): all three projector predecessors #11182, #11183, #11184 are still OPEN, and no ID-graph publication conformance audit suite exists on main (only doc references and design mentions). No competing live lane claim on this issue (4/4 comments read fresh).

    Parking until the projector follow-ons land; resume by implementing the four §6.1–6.4 property checks against their fixtures and recording per-property outcomes.

  10. dezren39
    added a commit that references this issue on Nov 24, 2026

    docs(#6062): 9-point sufficiency record for ID-graph publication form…

    eb579fe
  11. dezren39 commented on Nov 25, 2026

    @dezren39
    dezren39
    on Nov 25, 2026
    MemberAuthor
    More actions

    Lane any-n rechecked #11186 and the projector prerequisites against fresh current main d7e91888af3c (2026-11-25). Issue #11186 is OPEN with 5/5 comments read via REST; no competing live claim. The audit suite is absent. Current main has version/attestation projection slices, but not the correction/retirement outputs under open PR #14683 or the run-log input pins required by §§6.1/6.4 (#11184 remains OPEN).

    No code changed. Parking until correction/retirement projection and projector run-log input pins land on main; then recheck the fixtures and implement the four §6.1–6.4 property checks. #11182/#11183 may remain open for unrelated follow-on scope.

  12. developing-today-fleet
    added
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 25, 2026
  13. 3 remaining items

  14. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Bounded audit slice PR #14927 merged 2026-11-26T15:19:31Z (merge commit 3811aab681325ebe056a1205fab225fdd4f72253, head 3351fd1d3330c0d7ff47b45c993ae92684144556) by queue lane WS (task 24019) under standing merge authority. Shepherd evidence: #14927 (comment) — mergeable/clean re-checked immediately before merge; the test's dependencies (version_projection.rs, atlas-core Cargo.toml, fixture) are byte-identical on current main and the PR head, so the 5/5 pass on the exact head carries to main.

    Disposition verified: #14927 carried no closing keyword and stated it does not close this issue; this issue remains OPEN for the pending signed complete-unit (§6.4), pinned replay (§6.1), correction (§6.2), and retirement (§6.3) slices.

  15. dezren39
    reopened this on Nov 26, 2026
  16. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Correction to the note above (lane WS, task 24019): merging #14927 at 2026-11-26T15:19:31Z auto-closed this issue at 15:19:33Z as "completed". The cause is GitHub's closing-keyword parser matching the phrase "does not close #11186" in the PR body — the negation is not parsed. The PR's stated intent, and the record on this issue, is that the bounded slice does NOT complete #11186: signed complete-unit (§6.4), pinned replay (§6.1), correction (§6.2), and retirement (§6.3) remain pending on #11182/#11184 and #14683.

    I have reopened this issue to restore the intended disposition. The merged slice itself stands: PR #14927, merge commit 3811aab681325ebe056a1205fab225fdd4f72253, test file now on main at blob 2dd5828b….

  17. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Follow-on audit slice PR #15725 adds fixture-derived correction-clear and retirement-marker checks after PR #14683 supplied the explicit source facts. Fleet run 45895043645 on head d7167e0448b74f234d64197a6d599b046635cd16 passed the changed-file formatter check and the audit suite (6 passed, 0 failed). All nine implemented property checks report PASS; signed complete-unit §6.4 and pinned replay §6.1 remain pending on #11182/#11184. References #11182, #11183, #11184.

  18. dezren39 commented on Nov 26, 2026

    @dezren39
    dezren39
    on Nov 26, 2026
    MemberAuthor
    More actions

    Follow-on audit slice PR #15725 merged at 1f699f216726fed91bcfbea256e5d2ae80ab6342 (head d7167e0448b74f234d64197a6d599b046635cd16). Fleet run 45895043645 passed: file-scoped rustfmt check and 6 audit tests, 0 failed. The 9 implemented properties all report PASS, including exact correction clears and retirement tombstones. Signed complete-unit §6.4 and pinned replay §6.1 remain pending; #11182 and #11183 are OPEN, and #11184 is PARKED on those prerequisites.

  19. dezren39 commented on Nov 27, 2026

    @dezren39
    dezren39
    on Nov 27, 2026
    MemberAuthor
    More actions

    Lane 2137-G (queue task 21471) fresh premise + ownership check, 2026-11-27:

    • Read impl(atlas/id): ID-graph publication conformance audit (#6062 follow-on 5) #11186 and ALL 11 comments (REST per_page=100, count-confirmed). No competing live claim — the only claim is this queue task.
    • Fresh states: impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182 CLOSED, impl(atlas/id): projector — attestations and ingest runs (#6062 follow-on 2) #11183 CLOSED, impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184 OPEN (projector operations — run logging, replay, backfill; design(id/atlas): ID-graph publication format — Atlas objects + provenance/lineage relations as ID-graph objects #6062 follow-on 3).
    • Already landed: PR test(atlas): audit ID projection publication properties #14927 merged (3811aab) and PR test(atlas): audit correction clears and retirement tombstones #15725 merged (1f699f2) — 9 audit properties PASS (fleet run 45895043645: 6 tests, 0 failed), including correction exact-clear and retirement remove-tombstone.
    • Remaining acceptance cannot be audited yet: pinned replay §6.1 and signed complete-unit §6.4 depend on impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184's run-log input pins / replay fixtures, which are not on main while impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184 is open. This matches the task's prior park (ready_condition issue_closed impl(atlas/id): projector operations — run logging, replay, backfill (#6062 follow-on 3) #11184).

    Disposition: parking queue task 21471 with ready_condition = #11184 closed. Wake: #11184 closes and its pins/replay fixtures are on main — then add the remaining §6.1/§6.4 checks, run the audit suite via the dispatch route, and record commands + counts here.

  20. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Lane any-n / task 21471 refreshed the premise against GitHub REST (issue plus all 12 comments; count confirmed) at 2026-11-27 04:44Z. #11186 remains OPEN. #11184 remains OPEN (updated 04:41Z); its run-log input pins/replay fixtures are still the prerequisite for the remaining pinned-replay §6.1 and signed complete-unit §6.4 checks. Existing merged audit slices #14927/#15725 already cover nine passing properties. No competing live claim is recorded. No code changed; keeping the task parked until #11184 closes and its pins/replay fixtures are on main.

  21. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Gate revalidation (2026-11-27): #11182, #11183, and #11184 are now CLOSED. Projector run-log pins (#15892), pinned replay (#15956), and backfill plus ordering/atomicity (#15985) are merged. This clears the task resume condition. The prior audit already has nine passing property checks (#14927/#15725); I am now implementing the remaining pinned-replay §6.1 and signed complete-unit §6.4 checks against the landed APIs/fixtures. No live effects or deployments are in scope.

  22. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Audit implementation verified; final-head replay in progress.

    • Remote run dezren39/fleet#45964199704 passed on audit commit 491110cf941: cd pkgs/atlas-search && cargo test -p atlas-core --test id_publication_conformance -- --nocapture — 8 passed, 0 failed. All 11 reported properties PASS, including replay.pinned-inputs and publication.complete-unit.
    • Added the audit integration file to the existing atlas-search.rust test-suite registry entry.
    • Merged newer main into the branch (merge commit b8500d26012); rerunning the same suite against this exact final head before opening the PR.
    • Scope note: atlas-core projects unsigned descriptors; the complete-unit oracle verifies the document + required relation descriptors and signer-ready references. It does not claim runtime signing or publisher transaction behavior, which lives in the later publication adapter.
  23. developing-today-fleet
    closed this as completedin #16008on Nov 27, 2026
  24. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    ID-graph publication conformance audit complete. PR #16008 merged at 2e4d90013b86d8830e6ac3ef533235fd9a26c868; GitHub closed #11186 on merge.

    • Terminal Fleet run dezren39/fleet#45965673982 on the final PR branch passed cd pkgs/atlas-search && cargo test -p atlas-core --test id_publication_conformance -- --nocapture: 8 passed, 0 failed, 0 ignored, 0 measured. The report lists all 11 properties PASS, including replay.pinned-inputs and publication.complete-unit.
    • The merged-main tree is byte-identical to that tested head for both id_publication_conformance.rs and .github/test-suite-registry.json.
    • A follow-up run targeting main (dezren39/fleet#45967006452) has a successful Execute target command step; Fleet’s post-execution cleanup is still nonterminal, so it is not counted as a second completed run.
    • Complete-unit means fixture-derived unsigned document/lineage descriptors and signer-ready references; it does not claim runtime event signing or publisher transaction behavior.
  25. developing-today-fleet
    removed
    status:in-review
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 27, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/atlas-programReprioritization program epic (2026-11-12)

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.