GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member · Issue #2249 · developing-today/code

id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member #2249

New issue
Copy link
New issue
Copy link
Closed
#13454
Closed
id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member#2249
#13454
Copy link
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)source/creatorFiled by the new-issue-creator jobstatus/triagedTriaged and routed (see agent note)status:donetask/triageQueue packet kind: verify, reproduce, and route this item

Description

@dezren39
dezren39
opened on Oct 29, 2026
Issue body actions

GATED on #2036 (ID messaging/relay protocol v1 synthesis). Do not start until #2036's design is reviewed — a PoC built on an unreviewed protocol would be making the protocol's decisions itself, which the ID program forbids (see #2035 deliverable rules).

What

A five-node proof of concept of the relay model from the #2035 investigation (doc: doc/2026-10-29T11-05-00Z_investigation_multi_hop_relay_and_p2p_media/):

  • Four mutually visible members {A, B, C, D} plus E reachable only through D.
  • Chained-class messages fan out over iroh-gossip; D bridges to/from E in the same manner (fan-out to visible neighbours, excluding arrival neighbour).
  • Origin-signed envelopes with prev-hash chaining; signed hop records appended per relay; dedupe by message ID; hop cap enforced.
  • Measure: delivery completeness to E, duplicate rate at E when a second bridge appears, one-hop bridged latency vs direct latency.

Acceptance

  • Test/demo harness with 5 in-process or local endpoints, E firewalled from all but D at the application layer
  • A's chained message reaches E via D with a verifiable hop chain; a tampered relayed copy is refused at ingest
  • Duplicate copies (two bridges) collapse to one delivered message
  • Latency numbers recorded in the PoC report (direct vs one bridge hop)
  • Report linked from id: design: ID messaging/relay protocol v1 #2036; PoC is explicitly NOT the permanent feature

Parent epic: #2056 — ID platform expansion. Origin investigation: #2035. Pattern per Drew's 2026-10-28 execution orders: investigate → synthesise (#2036) → PoC.

Activity

Next
  1. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    on Oct 29, 2026
  2. developing-today commented on Oct 29, 2026

    @developing-today
    developing-todayBot
    on Oct 29, 2026 – with developing.today
    Contributor
    More actions

    CODE-1115

  3. github-actions
    assigned
    dezren39
    on Oct 29, 2026
  4. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 3, 2026
  5. dezren39 commented on Nov 3, 2026

    @dezren39
    dezren39
    on Nov 3, 2026
    MemberAuthor
    More actions

    🤖 Agent note · state: triaged — gate check and scope record (queue task 7864)

    Verdict: still live, not superseded, and correctly gated. No implementation starts now.

    Fresh state (2026-11-03T13:4xZ, gh reads)

    • id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member #2249 OPEN, labels app/id only, unchanged since 2026-10-29T11:53Z. No branch or PR owns it: repo-wide code search finds no iroh-gossip usage outside doc/ spikes; the only PR mentioning id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member #2249 is docs(id): bridge semantics investigation — hosted (HTTPS/WS) ↔ native (Iroh) seam (#2058) #2277 (merged docs: bridge semantics investigation, id: investigate: bridge semantics — hosted (HTTPS/WS) edition syncing with native Iroh nodes #2058).
    • Its declared gate, id: design: ID messaging/relay protocol v1 #2036 (ID messaging/relay protocol v1), now has a merged design: PR design(id): #2036 messaging/relay protocol v1 #3833 merged 2026-11-02T15:51Z, doc doc/2026-11-01_design_id2036.md on main. id: design: ID messaging/relay protocol v1 #2036 itself stays open as the synthesis parent.
    • The design sets a second, narrower gate on this issue (§6, verbatim): "The bridge PoC id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member #2249 may proceed only against phase 3's reviewed envelope and must not become production code before review."
    • Phase 3 is id: protocol v1 phase 3 — relay envelope + hop records over iroh-gossip for chained messages (#2036) #3796 (relay envelope + hop records over iroh-gossip for chained messages) — OPEN and status/blocked as of 2026-11-03T13:29Z. Its blocker is a queue bookkeeping defect, not a design question: task 5786 sits blocked and holds the canonical dedupe key, so the validated part-A packet (hidden_files/packet-3796-part-a-types.json) deduped onto it and no successor was created (issue comment 2026-11-03T12:18Z).
    • Phases around it: id: protocol v1 phase 1 — session header + segment checkpoint event kind (#2036) #3794 closed (phase 1 landed), id: protocol v1 phase 2 — PoC: intermittent-signature live stream for collaborative editing (#2036) #3795 parked (phase 2), id: protocol v1 phase 4 — retention and compaction for the event store (#2036) #3797 in progress (phase 4).

    Why the PoC cannot start

    The issue's own deliverable list requires origin-signed envelopes + prev-hash chaining, signed hop records appended per relay, dedupe by message ID, and an enforced hop cap. Those are exactly the artifacts #3796 defines. Building the five-node harness first would decide the envelope and hop-record shape inside PoC code — the failure mode #2036 §6 and the #2035 deliverable rules forbid ("do NOT build the permanent feature on top of an unreviewed PoC").

    Scope, recorded for when the gate opens (do not implement now)

    • Location: a new PoC under pkgs/id spikes (no production crate wiring); existing iroh work is only doc/2026-10-11T.../spikes/*, which are reference, not a base.
    • Topology: A, B, C, D mutually visible; E reachable only via D; E isolated from A/B/C at the application layer.
    • Behaviour: chained-class fan-out over iroh-gossip; D bridges to/from E by the same rule (fan-out to visible neighbours excluding the arrival neighbour); origin signature over content/prev-refs/group/sequence; hop record outside the signed envelope; dedupe by message ID; four-hop cap.
    • Measurements to record in the PoC report: delivery completeness to E; duplicate rate at E when a second bridge appears; direct vs one-bridge-hop latency.
    • Refusal vectors: tampered relayed copy rejected at ingest; two-bridge duplicates collapse to one delivery; relay forwards at most once per message and refuses its own prior hop.
    • Report links back to id: design: ID messaging/relay protocol v1 #2036; explicitly not the permanent feature.

    Ordering / blockers

    1. id: protocol v1 phase 3 — relay envelope + hop records over iroh-gossip for chained messages (#2036) #3796 part A — envelope, stable message ID, hop-record types (task 5786: re-scope or cancel-and-re-enqueue, per the 12:18Z correction note).
    2. id: protocol v1 phase 3 — relay envelope + hop records over iroh-gossip for chained messages (#2036) #3796 part B — gossip topic derivation, membership/ingest gate, validate-before-forward seam, bridge integration test.
    3. id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member #2249 — this PoC, against the reviewed id: protocol v1 phase 3 — relay envelope + hop records over iroh-gossip for chained messages (#2036) #3796 envelope.
    4. Review of the PoC report before anything here becomes production code.

    Resume condition: #3796 closed/merged (envelope reviewed). Until then this issue is dependency-blocked; the queue task closes as triaged and no worker should claim it for implementation.

  6. dezren39
    added
    queue/queuedHas a queued queue task
    source/creatorFiled by the new-issue-creator job
    status/needs-triageNot yet triaged; needs a first look
    task/triageQueue packet kind: verify, reproduce, and route this item
    and removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 3, 2026
  7. developing-today commented on Nov 3, 2026

    @developing-today
    developing-todayBot
    on Nov 3, 2026 – with developing.today
    Contributor
    More actions

    agent-note:v1
    state: triaged (coverage pass)
    Coverage pass 2026-11-03: reviewed in the fleet-wide per-issue pass (drift / overlap / already-handled / stale / blockers / ordering). Verdict: still live; queued in repo-health-code-pilot as triage at priority 30 (priority/none). If this is already handled at current main, the triage closes it with evidence; if it needs splitting, the triage files the split.
    Found via: coverage pass 2026-11-03

  8. 11 remaining items

  9. dezren39 commented on Nov 8, 2026

    @dezren39
    dezren39
    on Nov 8, 2026
    MemberAuthor
    More actions

    Partial verification — staying open (2026-11-07 done-task-only audit, tracking: #7016).

    Queue task(s) [7864, 8601] were marked done, and some work did land:

    • PR docs(id): bridge semantics investigation — hosted (HTTPS/WS) ↔ native (Iroh) seam (#2058) #2277 — docs(id): bridge semantics investigation — hosted (HTTPS/WS) ↔ native (Iroh) seam (id: investigate: bridge semantics — hosted (HTTPS/WS) edition syncing with native Iroh nodes #2058) (merged 2026-10-30T01:00:39Z): docs(id): bridge semantics investigation — hosted (HTTPS/WS) ↔ native (Iroh) seam (#2058) #2277

    No merged change closes this issue's full scope, so the done status is not treated as completion. Remainder re-queued as triage task 11634.

  10. dezren39
    added
    epic/id-programReprioritization program epic (2026-11-12)
    on Nov 12, 2026
  11. dezren39
    removed their assignment
    on Nov 20, 2026
  12. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    Claim — Lane xaltha taking #2249 now.

    Plan: five-node bridge-relay PoC per the #2035 investigation and #2036 design — in-process harness {A, B, C, D} + E reachable only via D, chained-class messages over iroh-gossip with origin-signed envelopes, hop records, dedupe, hop cap; acceptance per the issue (delivery via D with verifiable hop chain, tampered copy refused, duplicate collapse, latency numbers in the report). Predecessor #3796 closed via merged PR #13076, so the gate has lifted; premise-checking each acceptance criterion against current main before writing code. Report linked from #2036; PoC explicitly NOT the permanent feature.

  13. dezren39
    added 2 commits that reference this issue on Nov 23, 2026

    test(id-sync): five-node bridge-relay PoC harness for #2249

    be5ce74

    docs: five-node bridge-relay PoC report for #2249

    58584b6
  14. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    🤖 Agent note · triaged — live and unblocked; route the scoped PoC

    Verdict: #2249 remains OPEN and its acceptance scope is still needed. Both design/protocol gates have cleared: the #2036 protocol v1 design merged in PR #3833, and predecessor #3796 is CLOSED after PR #13076 merged with the relay-ingest acceptance evidence. No PR completing #2249 surfaced in the live PR search.

    Route: continue the issue's five-node bridge-relay PoC as a scoped follow-on task. The latest issue comment records lane xaltha's implementation claim and plan; no live fix task for #2249 was present in the code pilot queue, so this triage completion will create the formal small_fix successor. Keep the PoC separate from permanent production code and retain the acceptance/report requirements in #2249.

    Evidence: #3796 CLOSED; PR #13076 MERGED 2026-11-23 08:31 UTC; PR #3833 MERGED 2026-11-02 15:51 UTC; live state and linked PR search checked 2026-11-23.

  15. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    🤖 Agent note — lane any-n (task 21336)

    • Fresh state (2026-11-23): id: poc: five-node bridge relay over iroh-gossip — chained fan-out via a single bridging member #2249 OPEN. Its body is explicitly GATED on id: design: ID messaging/relay protocol v1 #2036 (messaging/relay protocol v1 synthesis): do not start until id: design: ID messaging/relay protocol v1 #2036's design is reviewed.
    • Verdict: id: design: ID messaging/relay protocol v1 #2036 is OPEN; its comments record the design deliverable as complete but show no review record. A PoC built now would make the protocol's decisions itself, which the ID program forbids.
    • Action: no implementation started, no worktree created. Parked on id: design: ID messaging/relay protocol v1 #2036 per the packet's dependency rule.
  16. dezren39
    added a commit that references this issue on Nov 23, 2026

    test(id-sync): add ed25519-dalek dev-dependency for the #2249 relay P…

    a90c712
  17. developing-today
    added
    status:in-review
    on Nov 23, 2026
  18. dezren39 commented on Nov 23, 2026

    @dezren39
    dezren39
    on Nov 23, 2026
    MemberAuthor
    More actions

    Lane oc-code-07 (queue task 21336) carried this forward: lane xaltha's harness branch (xaltha/2249-bridge-relay-poc, 4 commits, no PR) is merged onto current main in PR #13454, with two carry fixes (registry merge keeping both relay rows; missing ed25519-dalek dev-dep). All 3 PoC tests pass on current main (cargo test -p id-sync --test relay_poc: direct 17.9 ms vs bridged 242 ms medians). Report linked from #2036 as required. No production code changes; xaltha's commits keep their authorship in the PR.

  19. dezren39
    added a commit that references this issue on Nov 23, 2026

    Merge pull request #13454 from developing-today/lane/oc-code-07-21336…

    e5123f2
  20. dezren39
    closed this as completedin #13454on Nov 23, 2026
  21. developing-today
    added
    status:done
    and removed
    status:in-review
    on Nov 23, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)source/creatorFiled by the new-issue-creator jobstatus/triagedTriaged and routed (see agent note)status:donetask/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.