GeezerVison is showing github.com — id: build: TigerBeetle cluster provisioning — RTT mesh gate, 6-replica format, dead-replica runbook + rehearsal · Issue #2292 · developing-today/code
id: build: TigerBeetle cluster provisioning — RTT mesh gate, 6-replica format, dead-replica runbook + rehearsal #2292DescriptionBuildable follow-on from the #2064 topology investigation (doc PR #2291). The topology decision itself: 6 replicas, 2 per site × 3 cloud providers, sites within a few ms — cluster size is fixed at format time, so nothing here formats a production cluster until the #2064 doc has had its review round and the currency synthesis (#2043) confirms it.
Scope
- Site RTT measurement mesh (pre-format gate). Stand up one throwaway VM per candidate site (3 providers, metro-clustered region picks per the id: investigate: TigerBeetle cluster topology decision — 3 vs 6 replicas, site placement, commit latency #2064 doc §5), measure the full pairwise RTT mesh over ≥24h (p50/p95/p99), and record the results on this issue. Gate: if the slowest pairwise p95 exceeds the vendor's "few milliseconds" guidance by a wide margin, re-pick regions before any format.
- Cluster provisioning. Provision 6 replicas per the vendor hardware rules (dedicated machine + disk per replica, local NVMe, ECC where available, Linux ≥ 5.6, supervisor per replica), format at replica-count 6 with a recorded cluster ID, and bring the cluster up empty. No real value, no production data — this proves the shape.
- Dead-replica replacement runbook + rehearsal. Jepsen (via id: investigate: TigerBeetle — multi-currency ledgers, conversions, per-coin vs balance model, 3-node cluster topology #2040) found replica replacement the sharp operational edge: write the replacement procedure as a runbook in doc/, then rehearse it — kill one replica, replace it per the runbook, verify the cluster returns to full availability with balances intact.
Acceptance criteria
Parent epic: #2056. Origin investigation: #2064. Source investigation: #2040. Activitydeveloping-today commented on Oct 29, 2026 dezren39 commented on Oct 29, 2026 Intake review
Related: #2064 (topology investigation, doc PR #2291), #2040 (Jepsen source), #2043 (synthesis gate), epic #2056
Notes: Acceptance criteria were already in the body as a checklist — labels only this pass, no body edit. The production format stays gated on the #2064 review / #2043 confirmation per the body itself.
Risks: Provisioning real VMs across 3 providers has cost/credential needs a repo-only worker cannot meet; the RTT mesh (≥24h) is the long pole.
Suggested approach: Start with the RTT mesh gate; do not format any cluster before the gate and the review round clear.
🤖 Agent note · filed
- Agent: fleet monitor (repo-fleet-monitor)
- Session / ID: repo-fleet-monitor run 2026-10-29T12:12Z (07:12 CDT)
- Found via: monitor reconciliation
- Task: Duty 2 intake enrichment — acceptance criteria appended (original body preserved verbatim above it), labels normalized,
meta/enriched applied. Still-live check this pass: no merged PR or fix commit explicitly resolving this issue was found; where a queue triage task owns verification, it is named in the notes.
- Expectation: see the effort label; done = the appended acceptance criteria are met.
- Links: this issue
dezren39 commented on Nov 3, 2026 🤖 Agent note · blocked (escalated to Drew)
- Agent: queue worker (
repo-worker-code), OpenChamber scheduled lane c29174f1
- Session / ID: queue task 7869 (triage of id: build: TigerBeetle cluster provisioning — RTT mesh gate, 6-replica format, dead-replica runbook + rehearsal #2292, attempt 2)
- Fresh check 2026-11-03T16:22Z: id: build: TigerBeetle cluster provisioning — RTT mesh gate, 6-replica format, dead-replica runbook + rehearsal #2292 OPEN; its gate parents — id: investigate: TigerBeetle cluster topology decision — 3 vs 6 replicas, site placement, commit latency #2064 CLOSED (topology decision made: 6 replicas, 2 per site × 3 providers), id: design: ID currencies v1 #2043 OPEN (currency synthesis, so production format still gated per the body).
- Why this is not a repo worker's task: every acceptance criterion needs real infrastructure — one throwaway VM per candidate site on 3 different cloud providers held for a ≥24h RTT mesh, then 6 replicas with dedicated machines/NVMe, then a destructive replica rehearsal. That is provider accounts, credentials and spend a repo-only queue lane cannot authorize.
- Decision needed from Drew: which cloud accounts/projects to use and a spend cap for ~24h–72h of 3 VMs + 6 cluster replicas, plus whether the rehearsal targets a throwaway provider account.
- Ordering once approved: RTT mesh first (gate: slowest pairwise p95 within the vendor's "few milliseconds" guidance, else re-pick regions), then the 6-replica format, then the replacement runbook + rehearsal. The production format additionally waits on id: design: ID currencies v1 #2043 closing.
- Blockers recorded on the issue: infrastructure access/cost (Drew), id: design: ID currencies v1 #2043 (open, currency synthesis). Nothing scoped down or attempted here; no branch or worktree created.
dezren39 commented on Nov 17, 2026 Duplicate triage packet (task 19738, lane any-d): the triage of record for #2292 is task 18216's verdict (2026-11-17T02:37Z, comment above). Re-verified fresh this shift: issue OPEN with status/blocked + queue/blocked; Drew answered the spend question in the Lanes chat on 2026-11-16 — he agrees with the RTT mesh / TigerBeetle idea in principle but does not need a 6-node cluster now and has no cloud setup for it now; the spend is deferred, not approved, and the 3-provider provisioning is not to proceed. No new follow-on from this packet; the build stays blocked on Drew's deferred spend decision, which the issue's labels already record.
dezren39 commented on Nov 22, 2026
Triage complete at current main ecd7891. #2292 remains OPEN; #2043 and #2064 are CLOSED. The existing triage of record (#18216, corroborated by duplicate check #19738) records Drew’s 2026-11-16 answer: spend is deferred, there is no cloud setup, and no mesh or cluster provisioning is authorized. Ordered path remains RTT mesh → 6-replica throwaway rehearsal → replacement runbook, only if a new trigger makes the deferred infrastructure available. No provisioning was attempted. dezren39 commented on Nov 24, 2026 🤖 Agent note · verified (queue task 21790, lane code-j)
Fresh check: #2292 is OPEN with status/blocked and queue/blocked. The triage of record (task 18216, re-confirmed by 19738 and 7869) says the spend is deferred by Drew on 2026-11-16, with no cloud setup and no provisioning authorized. Nothing new to route. The build waits on the deferred spend decision, which the labels already record. developing-today-fleet commented on Nov 26, 2026 🤖 Agent note (lane code-j, 2026-11-26, triage task 24905): still deferred — nothing to route.
developing-today-fleet commented on Nov 27, 2026 🤖 Agent note · 1837-G · still deferred — dispositioned, not provisioned
- Lane: 1837-G (agent work loop DRIVE, 2026-11-26 18:37 CST) · queue task 25373
- Fresh check: issue OPEN, labels status/blocked + queue/blocked. Read all 16 comments.
- Premise/ownership: triage of record is task 18216 (2026-11-17), re-confirmed by tasks 19738, 7869, 21790 and 24905 (2026-11-26). Drew answered the spend question 2026-11-16: he agrees in principle but does not need a 6-node cluster now and has no cloud setup for it — spend DEFERRED, not approved; do not provision the 3-provider RTT mesh VMs or the 6-replica cluster.
- Disposition: no provisioning attempted, no branch/PR. Queue task 25373 is blocked/parked on the same gate. Ready condition: Drew raises this again or a cloud setup exists — revisit only then.
- Gates id: design: ID currencies v1 #2043 and id: investigate: TigerBeetle cluster topology decision — 3 vs 6 replicas, site placement, commit latency #2064 are both CLOSED; the sole remaining gate is the deferred spend/cloud-setup decision.
MetadataMetadataDevelopmentNo branches or pull requestsIssue actions
|