GeezerVisonThe World Wide Web, restored to 800 pixels of glory. |
| Home|About|Gaming cabinet|Archives|How it works|Starter sites |
GeezerVison is showing github.com — id(ci): F11.8 benchmark harness with committed baselines · Issue #539 · developing-today/code Closed Labels app/idPackage/app: id (pkgs/ or apps/ in this repo)area/ciCI/CD pipelines, workflows, and build automation (area)effort/lLarge: multi-day or open-ended; expect staged check-inskind/performancePerformance problem or optimizationmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:done DescriptionWhat and whyBenchmarks for guest replay of N events, journal append+fsync, checkpoint compaction and session fan-out to K clients, with committed baselines and a non-blocking CI job reporting >20% regressions. Several Phase 11/12 exits (fast CI lane, many worlds per node, fair scheduling) are stated as numbers, and nothing measures them today. SourceCurrent statusNot started. No pkgs/id/benches directory; no Acceptance criteria
SizeL PrerequisitesNone. Activity
MetadataMetadataAssigneesLabelsapp/idPackage/app: id (pkgs/ or apps/ in this repo)area/ciCI/CD pipelines, workflows, and build automation (area)effort/lLarge: multi-day or open-ended; expect staged check-inskind/performancePerformance problem or optimizationmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:done TypeProjectsMilestoneRelationshipsDevelopmentIssue actions |
| You are visitor 01402775 — GeezerVison does not store the pages you look up. Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required. |