GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id(ci): F11.4 fast CI lane under 15 minutes · Issue #551 · developing-today/code

id(ci): F11.4 fast CI lane under 15 minutes #551

New issue
Copy link
New issue
Copy link
Closed
Closed
id(ci): F11.4 fast CI lane under 15 minutes#551
Copy link
Assignees
dezren39
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)area/ciCI/CD pipelines, workflows, and build automation (area)effort/mMedium: expected under 1 day of workkind/ciCI/CD pipelines, workflows, and build automationmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/sweepFiled or worked by an issue-sweep jobstatus:donetask/ci-investigationQueue packet kind: investigate a CI failure

Description

@dezren39
dezren39
opened on Oct 22, 2026
Issue body actions

What and why

Split CI into a <15-minute fast lane (fmt, clippy, unit tests) and a full lane (integration, VM, E2E). Exit: median fast-lane PR feedback under 15 minutes over ten runs. PR feedback is still close to an hour, and the status audit calls the task done although its exit is not met. #292 was closed when E2E moved to nightly, but the one-job layout remains.

Source

  • .opencode/plans/phase-11-foundations.md:36
  • .opencode/plans/2026-10-20_phase-11-status.md:14

Current status

Partial. The status audit calls this done, but the exit is not met. .github/workflows/id-check.yml:54-56 is one nix flake check job with timeout-minutes: 60 and --keep-going (:98); E2E went nightly. gh run list --workflow id-check.yml --limit 12 (2026-10-21): successful PR runs took 46-58 min (e.g. 03:07:33 to 04:05:23); push runs were cancelled at ~60 min. Issue #292 (id workflow gates PRs ~2 h) is still open.

Acceptance criteria

  • A fast-lane job (fmt, clippy, unit tests) runs on every PR touching pkgs/id, separate from a full lane (integration, VM, E2E)
  • The full lane still runs and its failures stay visible
  • Median fast-lane PR feedback is under 15 minutes over ten consecutive runs, with the runs listed
  • .opencode/plans/2026-10-20_phase-11-status.md is corrected

Size

M

Prerequisites

  • id(ci): F11.8 benchmark harness with committed baselines #539 — D1-008 F11.8 Benchmark harness with committed baselines

Activity

Next
  1. dezren39
    added
    enhancementNew feature or request
    on Oct 22, 2026
  2. github-actions
    assigned
    dezren39
    on Oct 22, 2026
  3. dezren39
    added a commit that references this issue on Oct 25, 2026

    docs(id): Phase 14 plan — close-out: finish, measure, verify, open th…

    ee67188
  4. dezren39 commented on Oct 25, 2026

    @dezren39
    dezren39
    on Oct 25, 2026
    MemberAuthor
    More actions

    Fresh evidence from the 2026-10-25 01:00 CDT sweep: the nix flake check leg of id-check.yml (timeout-minutes: 60) now hovers at the cap on healthy PRs, so the timeout — not any check — decides the verdict:

    • PR fix(id/web): classify_tag only treats auto-{ISO_DATE} names as auto-backups #810: leg PASSED in 51m12s (run 40153033944).
    • PR fix(id-web): detect .pm.json compound extension case-insensitively #771: leg CANCELLED at exactly 60m on the original run and again on a rerun (run 40153031377, 03:58:29Z→04:58:55Z).
    • PR fix(id-web): parseWorldSeed accepts decimal digits only #833: leg CANCELLED at 60m20s (run 40157604297).

    #771 and #833 were merged on local verification (targeted cargo/vitest suites green; other legs SUCCESS) per the standing merge directive, with the timeout noted on each PR. Until the fast lane lands, expect recurring cancelled flake legs on sound id PRs; the cancelled-at-60m shape (conclusion cancelled, duration ≈ 1h0m) is the tell — it is not a check failure.

  5. dezren39
    added a commit that references this issue on Oct 25, 2026

    ci(id): raise nix flake check job timeout 60m -> 90m

    3dab7b5
  6. dezren39 commented on Oct 25, 2026

    @dezren39
    dezren39
    on Oct 25, 2026
    MemberAuthor
    More actions

    Update on the flake-leg bottleneck documented here: resolved via #869 / PR #874 (merged 4c05b00). The id PR gate is now a parallel per-check matrix with the integration suite sharded three ways. PR #874's verification run: 14m36s wall end-to-end (baseline ~51m, or a 60m-cap cancellation), slowest job 13m53s. The 60-minute cancellation pattern should be gone; per-check cap is 30m. Remaining CI-lane items here (fast-lane design) can be evaluated against the new baseline.

  7. dezren39
    added
    task/ci-investigationQueue packet kind: investigate a CI failure
    source/sweepFiled or worked by an issue-sweep job
    kind/ciCI/CD pipelines, workflows, and build automation
    status/needs-triageNot yet triaged; needs a first look
    priority/normalOrdinary priority (the default)
    effort/mMedium: expected under 1 day of work
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    area/ciCI/CD pipelines, workflows, and build automation (area)
    and removed
    enhancementNew feature or request
    on Oct 25, 2026
  8. 48 remaining items

  9. dezren39
    added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Oct 27, 2026
  10. dezren39
    added a commit that references this issue on Oct 27, 2026

    Merge pull request #1310 from developing-today/queue/1283-551-fast-ci…

    17c2be5
  11. developing-today
    added
    status:done
    on Oct 27, 2026
  12. developing-today
    closed this as completedon Oct 27, 2026
  13. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    🤖 Agent note · PR #1310 merged — timings recorded (queue task 1283)

    • Agent: repo-worker-code (lane D shift)
    • PR: id(ci): split crash-gate into 4 parallel PR checks, test shards 3→4 (#551) #1310 merged 2026-10-27T09:07:47Z, merge commit 17c2be5d5911b270e0783954440d4ec7ba6ddcbc. All 31 PR checks pass, including clippy-lint (post-fix(clippy): replace panic! in MisplacedNode test so clippy-lint passes (#1245) #1299) and the aggregate nix flake check.

    Timings from PR #1310's own run (40474146822, head cde1d01f):

    • The four new crash-gate splits all land under the old aggregate's ~15.0m: crash-gate-ingest 14m44s, crash-gate-sampled 14m22s, crash-gate-sweep 14m19s, crash-gate-control 14m9s.
    • Rebalanced shards: test-shard-2 11m34s, test-shard-3 10m3s, test-shard-1 7m45s, test-shard-0 7m20s; test-unit 11m29s.
    • Whole-run wall clock was 20m40s (08:31:52Z→08:52:32Z) including runner queueing (first matrix jobs started 08:34–08:39Z) — so this single run does not by itself demonstrate <15m PR feedback.

    Status of #551: stays open, correctly. The remaining acceptance criterion is the median fast-lane feedback <15m over ten consecutive PR runs with the runs listed — that measurement can only accumulate now that #1310 is on main. Re-measure after ~10 post-merge PR runs and record the run list here.

  14. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Oct 27, 2026
  15. dezren39
    marked this as blocked on Nov 1, 2026
    • Bulk LogSync test retries a mid-stream reset instead of explaining it #241
  16. dezren39
    marked this as blocking on Nov 1, 2026
    • id: validation — Phases 0–8 + platform completion acceptance audit #1075
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)area/ciCI/CD pipelines, workflows, and build automation (area)effort/mMedium: expected under 1 day of workkind/ciCI/CD pipelines, workflows, and build automationmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/sweepFiled or worked by an issue-sweep jobstatus:donetask/ci-investigationQueue packet kind: investigate a CI failure

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.