GeezerVison is showing github.com — id: design: versioning, negotiation & forward-compatibility policy (from #5674) · Issue #5809 · developing-today/code
id: design: versioning, negotiation & forward-compatibility policy (from #5674) #5809Labels app/idPackage/app: id (pkgs/ or apps/ in this repo)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingstatus:donetask/triageQueue packet kind: verify, reproduce, and route this item DescriptionSummary
Follow-on design ticket from #5674 — its decomposition sketch names this as a separate design, and the parent's acceptance requires these tickets to be filed and linked. Filed in the 2026-11-04 gap pass (WS-F) so the design work exists and can be prioritised on its own merits; implementation timing is a separate decision, possibly months out.
What this design must settle
How wire versions are negotiated and what forward compatibility promises: what a v1 peer must do with a v2 frame, and what it may never silently drop.
Context from the parent
The parent design fixes the postcard wire-format family and the transport-adapter model that carries ID over non-UDP transports and relays. The parent issue carries the surrounding decisions this ticket must not re-decide; where this ticket's answer would change a parent decision, record that explicitly rather than silently forking it.
Decision record expected
Close this design with a recorded decision (on this issue or in a doc/ record linked from it): the chosen shape, the alternatives rejected and why, and the invariants implementation must hold. If the design splits further, file the splits and link them here rather than growing this issue.
Relations
Parent: #5674. Programme: epic #2056. Filed by WS-F (2026-11-04 ID design gap & expansion pass). Activitydeveloping-today commented on Nov 5, 2026 dezren39 commented on Nov 5, 2026 dezren39 commented on Nov 5, 2026 agent-note:v1
- task: 10212
- state: done (triaged)
- lane: code-h (direct)
Triage 2026-11-05 (task 10212): well-scoped follow-on design ticket; its one real ordering constraint is its parent.
Verified fresh at triage:
- Issue id: design: versioning, negotiation & forward-compatibility policy (from #5674) #5809 open; only comment is the Kaneo link — no decision record exists yet, and none was found in a linked doc.
- Parent id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674 (wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies) is OPEN. This ticket's own context says the parent "fixes the postcard wire-format family and the transport-adapter model" and that this ticket must not re-decide parent decisions. Versioning/negotiation policy is defined over exactly those wire formats, so the decision record here can only be finalised after id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674's wire-format decisions are recorded (or explicitly against a named draft of them, recorded as such on this issue).
- Programme: epic epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056. Labels: added
kind/design to match the sibling design tickets; the ticket already carries app/id.
Routing: design work may proceed in parallel with #5674 (drafting the negotiation shape, v1-peer/v2-frame behavior, never-silently-drop invariants), but the closing decision record is ordered after #5674's decision record. No blocker on Drew; implementation timing is a separate later decision per the filing note. dezren39 commented on Nov 10, 2026 🤖 Agent note · decision record opened
- Agent: repo queue worker, lane code-g (repo-worker-code)
- Session / ID: cron repo-queue-worker-shift-g run 2026-11-10 13:43 CST; task 12799
- Found via: claimed task 12799 this shift; execution-lane assignment returned
direct (row 6048), so this lane worked the task itself per fix(queue): single-session by default — launch-on-handoff, lane works, inline triage (reverses #8097 Rule 3) #8187 — no handoff.
- Task: task 12799 for issue id: design: versioning, negotiation & forward-compatibility policy (from #5674) #5809 (small_fix, design record). Fresh check: issue id: design: versioning, negotiation & forward-compatibility policy (from #5674) #5809 is OPEN, no hard-stop labels (held / user/owned / do-not-merge / do-not-auto-edit). Parent issue id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674 is OPEN and its decision record has not landed.
- Done: decision record written and opened as PR doc: decision record for #5809 — versioning, negotiation & forward-compatibility policy #8199 (
doc/2026-11-10_decision_id5809_versioning_negotiation.md, branch queue/12799-5809-version-negotiation). It decides: (major, minor) version shape with additive-only minors; session-start negotiation settling on the highest mutually supported version with the result bound into the handshake transcript; a v1 peer must not parse and must not silently drop a v2 frame (endpoints return the unsupported-version error, relays forward opaquely byte-for-byte); unknown extension/TLV data is preserved; deprecation runs a full major cycle of dual acceptance with golden vectors as the conformance contract.
- Ordering: per task 12799's acceptance, the record is decided explicitly against a named draft of the parent — the issue id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674 body as checked 2026-11-10 (§1 and §2) — and states that the parent's final record wins on any conflict. Its one addition to the parent sketch (transcript binding of the negotiation result, D2) is flagged in §7 of the record and cross-noted on issue id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674.
- Expectation: PR doc: decision record for #5809 — versioning, negotiation & forward-compatibility policy #8199 review/CI; issue id: design: versioning, negotiation & forward-compatibility policy (from #5674) #5809 stays open until the record merges, per its acceptance. Task 12799 completes as pr_opened, or parks as a CI/review wait on PR doc: decision record for #5809 — versioning, negotiation & forward-compatibility policy #8199.
- Links: issue id: design: versioning, negotiation & forward-compatibility policy (from #5674) #5809, parent issue id: design: Wire format & transport adapters — postcard schema, non-UDP carriers, relays/proxies #5674, PR doc: decision record for #5809 — versioning, negotiation & forward-compatibility policy #8199, task 12799
dezren39 commented on Nov 10, 2026 agent-note:v1
task: 12799
lane: code-n
stage: done
state: task 12799 complete — outcome fixed_merged. PR #8199 MERGED 2026-11-10T21:59:03Z (merge commit 9ea1d34): the #5809 decision record is on main at doc/2026-11-10_decision_id5809_versioning_negotiation.md. The record honors the ordering constraint explicitly — decided against the named #5674 draft (the #5674 issue body's envelope/versioning sections, checked fresh 2026-11-10), with parent-wins precedence stated so no #5674 decision is silently forked. Codex on PR #8199 failed on usage limits with zero findings/reviews (dispositioned on the PR, comment 6779057225); basic checks were still queued in the runner backlog at merge (docs-only, standing merge authority). Issue #5809 closes on this evidence; stale in-flight labels removed in this pass.
MetadataMetadataapp/idPackage/app: id (pkgs/ or apps/ in this repo)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingstatus:donetask/triageQueue packet kind: verify, reproduce, and route this item DevelopmentNo branches or pull requestsIssue actions
|