GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id: design: DoS scenario catalogue per interface (from #5685) · Issue #5892 · developing-today/code

id: design: DoS scenario catalogue per interface (from #5685) #5892

New issue
Copy link
New issue
Copy link
Closed
Closed
id: design: DoS scenario catalogue per interface (from #5685)#5892
Copy link
Assignees
dezren39
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)status:donetask/triageQueue packet kind: verify, reproduce, and route this item
Milestone
ID platform program

Description

@dezren39
dezren39
opened on Nov 5, 2026
Issue body actions

Summary

Follow-on design ticket from #5685 — its decomposition sketch names this as a separate design, and the parent's acceptance requires these tickets to be filed and linked. Filed in the 2026-11-04 gap pass (WS-F) so the design work exists and can be prioritised on its own merits; implementation timing is a separate decision, possibly months out.

What this design must settle

Concrete scenarios, load profiles, and pass/fail + recovery assertions per interface.

Context from the parent

The parent programme fixes the adversarial DoS suite and the per-interface benchmark programme as CI regression gates sharing one load/measurement machinery. The parent issue carries the surrounding decisions this ticket must not re-decide; where this ticket's answer would change a parent decision, record that explicitly rather than silently forking it.

Decision record expected

Close this design with a recorded decision (on this issue or in a doc/ record linked from it): the chosen shape, the alternatives rejected and why, and the invariants implementation must hold. If the design splits further, file the splits and link them here rather than growing this issue.

Relations

Parent: #5685. Programme: epic #2056. Filed by WS-F (2026-11-04 ID design gap & expansion pass).

Activity

Next
  1. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    on Nov 5, 2026
  2. developing-today commented on Nov 5, 2026

    @developing-today
    developing-todayBot
    on Nov 5, 2026 – with developing.today
    Contributor
    More actions

    CODE-1575

  3. dezren39
    added
    queue/queuedHas a queued queue task
    task/triageQueue packet kind: verify, reproduce, and route this item
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    queue/queuedHas a queued queue task
    on Nov 5, 2026
  4. dezren39 commented on Nov 5, 2026

    @dezren39
    dezren39
    on Nov 5, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done (triage)

    • Agent: queue worker (repo-worker-code), lane code-t
    • Session / ID: task 10294
    • Found via: queue claim
    • Task: triaged design issue id: design: DoS scenario catalogue per interface (from #5685) #5892; confirmed well-formed and unblocked, design work re-enqueued in this same pass (addendum below names the task id)
    • Expectation: done = issue id: design: DoS scenario catalogue per interface (from #5685) #5892 routed with evidence; the decision-record work proceeds as the follow-up task
    • Links: issue design(id): DoS suite & performance benchmark programme — adversarial CI coverage and per-interface regression gates #5685 (parent), issue epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 (epic)

    Triage findings (verified fresh 2026-11-05):

    1. Well-formed, self-contained design ticket. Issue id: design: DoS scenario catalogue per interface (from #5685) #5892 (from issue design(id): DoS suite & performance benchmark programme — adversarial CI coverage and per-interface regression gates #5685's decomposition, WS-F gap pass 2026-11-04) states its acceptance plainly: close with a recorded decision on the DoS scenario catalogue per interface — concrete scenarios, load profiles, and pass/fail + recovery assertions per interface — with alternatives rejected and invariants stated. Nothing missing, no defect to verify.
    2. Context verified live: parent issue design(id): DoS suite & performance benchmark programme — adversarial CI coverage and per-interface regression gates #5685 is OPEN; programme epic issue epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 is OPEN (verified this shift). The parent fixes the adversarial DoS suite and per-interface benchmark programme as CI regression gates sharing one load/measurement machinery; those are fixed context this ticket must not re-decide silently.
    3. No blocker, no Drew decision needed to start. Implementation timing being a separate, possibly-months-out decision gates implementation, not this design. The only remaining work is the design itself, so the follow-up enqueued in this pass is the decision-record task for this same issue (standard triage dedupe key, enqueued after this triage completes).

    Disposition: triaged; design work proceeds as the follow-up task named in the addendum. Issue #5892 stays open for it.

  5. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 5, 2026
  6. dezren39 commented on Nov 5, 2026

    @dezren39
    dezren39
    on Nov 5, 2026
    MemberAuthor
    More actions

    🤖 Agent note · addendum to task 10294 triage

    • Agent: queue worker (repo-worker-code), lane code-t
    • Session / ID: task 10294
    • Task: the follow-up named in the triage note above is task 10502 (queue repo-health-code-pilot, status queued): produce the issue id: design: DoS scenario catalogue per interface (from #5685) #5892 decision record for the DoS scenario catalogue per interface. Enqueued immediately after task 10294 completed, because the packet dedupe pattern reuses the standard triage key for issue id: design: DoS scenario catalogue per interface (from #5685) #5892.
  7. dezren39
    added
    queue/queuedHas a queued queue task
    and removed
    queue/queuedHas a queued queue task
    on Nov 5, 2026
  8. 259 remaining items

    Load more actions
  9. dezren39
    added
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status:in-review
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 18, 2026
  10. dezren39 commented on Nov 18, 2026

    @dezren39
    dezren39
    on Nov 18, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: queue worker (repo-worker-code), lane oc-code-05
    • Session / ID: OpenChamber scheduled lane; task 19920
    • Found via: one-queue claim (filter: repo = code)
    • Task: revalidate and triage design issue id: design: DoS scenario catalogue per interface (from #5685) #5892; first checkpoint records origin=openchamber-scheduled-lane.
    • Expectation: record the current design/implementation disposition and close task 19920 or park with a concrete owner/resume condition.
    • Links: id: design: DoS scenario catalogue per interface (from #5685) #5892
  11. dezren39 commented on Nov 18, 2026

    @dezren39
    dezren39
    on Nov 18, 2026
    MemberAuthor
    More actions

    🤖 Agent note · triaged / resolved

    • Agent: repo-worker-code, lane oc-code-05
    • Task: 19920 triage; fresh GitHub state checked 2026-11-18.
    • Verdict: the issue requests a design decision record. That acceptance is met: PR docs(id): record DoS scenario catalogue for #5892 #7738 is MERGED (2026-11-16T10:53:40Z, merge 88f1b715f8f80dc6a0aac68182b9b14da92e162d), and doc/2026-11-08_decision_id5892_dos_scenario_catalogue.md is on main (blob 65aebf5f0b1ef0a691659fe40db21e6d021a8e9b). No hard-stop labels were present. The issue body says implementation timing is a separate decision, so this design issue is closed as satisfied; no implementation packet is invented here.
    • Evidence: issue id: design: DoS scenario catalogue per interface (from #5685) #5892 was OPEN at verification; PR docs(id): record DoS scenario catalogue for #5892 #7738 state MERGED; decision-record path verified on main.
    • Links: docs(id): record DoS scenario catalogue for #5892 #7738 · id: design: DoS scenario catalogue per interface (from #5685) #5892
  12. dezren39 commented on Nov 18, 2026

    @dezren39
    dezren39
    on Nov 18, 2026
    MemberAuthor
    More actions

    Design acceptance is complete: PR #7738 merged as 88f1b71, and the decision record is on main at doc/2026-11-08_decision_id5892_dos_scenario_catalogue.md. Implementation timing is explicitly separate from this design ticket. See triage evidence in the preceding agent note.

  13. dezren39
    closed this as completedon Nov 18, 2026
  14. developing-today
    added
    status:done
    on Nov 18, 2026
  15. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 18, 2026
  16. dezren39 commented on Nov 18, 2026

    @dezren39
    dezren39
    on Nov 18, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done

    • Agent: repo-worker-code, lane oc-code-05
    • Task: 19920 triage completed as already_done.
    • Verified: issue id: design: DoS scenario catalogue per interface (from #5685) #5892 is CLOSED with status:done; PR docs(id): record DoS scenario catalogue for #5892 #7738 is MERGED at 88f1b715f8f80dc6a0aac68182b9b14da92e162d; no claim/queue/work labels remain.
    • Result: requested design record already satisfied the issue acceptance; implementation is a separate timing decision, so no follow-on packet was invented.
  17. dezren39
    added a commit that references this issue on Nov 25, 2026

    docs(id): confirm the per-scenario CI tier table for the DoS suite (#…

    c901d20
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)status:donetask/triageQueue packet kind: verify, reproduce, and route this item

Type

No type

Projects

No projects

    Milestone

    • ID platform programNo due date

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.