GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — design(atlas): Atlas v1 build-out — design-mill starter (proto design → full design set) · Issue #9091 · developing-today/code

design(atlas): Atlas v1 build-out — design-mill starter (proto design → full design set) #9091

New issue
Copy link
New issue
Copy link
Open
Open
design(atlas): Atlas v1 build-out — design-mill starter (proto design → full design set)#9091
Copy link
Labels
epic/atlas-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingqueue/blockedQueue or user escalation statestatus/blockedQueue or user escalation statestatus:to-dowork/assignedQueue worker lifecycle state

Description

@dezren39
dezren39
opened on Nov 12, 2026
Issue body actions

What this is

Design-mill starter for the Atlas v1 program (Drew directive, 2026-11-12 17:38 CST): build out a full design for a strong v1 of Atlas — search build-out with Workers fan-out, the backup mesh, the Metadata schema + evolution doctrine, the per-embed classification model, always-on corpus ingestion, embed-storage economics, query-as-data, a virtual filesystem over the content-addressed store, and the worker-instructions rollout.

  • Proto design (intake output, merged to main): doc/2026-11-12T23-59-00Z_design_atlas_v1_proto/note.md in developing-today/code — current-state inventory, workstream specs A–I, and the statement map. Read it from the repo.
  • Program home: epic epic: Atlas program — unified search and memory index over every corpus #8983 (Atlas program). Workstreams are filed as sibling sub-issues of epic: Atlas program — unified search and memory index over every corpus #8983 and linked from the proto design §J.
  • Summit ownership: the claiming session runs the design-mill pattern (statement inventory → state-of-the-art expansion → versioned designs → granular implementation issues) under the launch packet in ~/workspace/custom-skills/design-mill/SKILL.md, owning this issue end to end. It elaborates the proto design into the full design set — many smaller designs — and files the granular implementation issues under each workstream issue.

Binding constraints from the directive

  • Atlas is internal-use only; the corpus is never exposed directly to a public surface (disclosure contexts are a classification-model concern, workstream D).
  • Coordinate, don't duplicate: pm stack: multi-board hierarchy + full task genealogy #9060 design §12 (issue/PR Metadata), slices impl(fleet): fleet gh Metadata superset — create-path stamping + DB insert (extends #9016) #9073/impl(fleet): metadata database + fleet Metadata query surface #9074; content-plane models in design(pm-stack): content-addressed media/data plane — R2 dedup, reference-based access, GC when the last reference drops #9084 (reference-vs-copy is UNDECIDED there — this program references its evaluation, never pre-settles it); queue/PM genealogy model from pm stack: multi-board hierarchy + full task genealogy #9060 generally.
  • The Metadata schema doctrine (workstream C) is shared between Atlas corpus metadata and issue/PR Metadata: additive-only evolution, version always carried, breaking changes parked and applied as one set with a reclassify-everything pass.

Acceptance

  • Statement inventory from the proto design §J: zero unmapped statements.
  • Each workstream A–I elaborated into versioned design docs merged under doc/, or explicitly folded into an existing design by amendment with a link recorded here.
  • Granular implementation issues filed under each workstream issue with acceptance criteria.
  • Open questions answered in the mill or batched to Drew with options + a recommendation.
  • This issue's checklist updated as workstreams land; the queue task completes only when the above are demonstrably done (not on epic closure alone).

Refs #9092 — its remaining acceptance is design-first; this starter owns the design set.

Activity

Next
  1. dezren39
    added
    kind/designA design proposal (design-architect): multi-step, phased, decision-bearing
    epic/atlas-programReprioritization program epic (2026-11-12)
    on Nov 12, 2026
  2. developing-today commented on Nov 12, 2026

    @developing-today
    developing-todayBot
    on Nov 12, 2026 – with developing.today
    Contributor
    More actions

    CODE-2794

  3. dezren39
    added a parent issue on Nov 12, 2026
    • epic: Atlas program — unified search and memory index over every corpus #8983
  4. developing-today
    added
    status:in-review
    on Nov 12, 2026
  5. dezren39
    added a commit that references this issue on Nov 12, 2026

    Merge pull request #9102 from developing-today/docs/atlas-v1-proto-20…

    810924a
  6. developing-today
    added
    status:done
    and removed
    status:in-review
    on Nov 12, 2026
  7. developing-today
    closed this as completedon Nov 12, 2026
  8. dezren39 commented on Nov 12, 2026

    @dezren39
    dezren39
    on Nov 12, 2026
    MemberAuthor
    More actions

    Design-mill intake complete (2026-11-12)

    • Proto design merged: PR design(atlas): Atlas v1 proto design (design-mill intake, #9091) #9102 (merge 810924ae8c) — doc/2026-11-12T23-59-00Z_design_atlas_v1_proto/note.md (21,083 B, verified on main). Current-state inventory + workstream specs A–I + statement→issue map (§J) + open questions (§K).
    • Workstream issues (all native sub-issues of epic: Atlas program — unified search and memory index over every corpus #8983, epic/atlas-program labeled): A impl(atlas-search): search v1 — build-out, Workers fan-out, shard benchmarks, cache policy, second embedder #9092 · B impl(atlas/fleet): backup mesh — all-Turso 14d restic-zstd to R2, R2/laptop/Drive mesh, D1+laptop DBs into Turso #9093 · B-research research(atlas): OpenCode DB backup economics — copy vs zstd vs restic-delta cost + growth model #9094 · C design(atlas+pm): Metadata schema v1 + evolution doctrine — additive-only, extras, strict enums, breaking-change parking lot #9095 · D design(atlas): classification model — per-embed granularity, boundary-safe chunking, disclosure contexts #9096 · E impl(atlas): continuous ingestion — queue/PM/GitHub/Muse/OpenCode/ID corpora + sources inventory #9097 · F bench(atlas): embed-storage economics — vectors+hash+metadata in Turso, raw content content-addressed (feeds #9084) #9098 · G impl(atlas): query-as-data — query embeds, full tool/parameter provenance, permanent result archive, versioning #9099 · H design(atlas): virtual filesystem over the content-addressed store + aggregated file index (Basin/Parquet evaluation) #9100 · I impl(fleet): worker search instructions rollout — runbooks + lane bodies gain a search section #9101.
    • Amendments landed: Metadata doctrine bound onto impl(fleet): fleet gh Metadata superset — create-path stamping + DB insert (extends #9016) #9073 (comment 6839361945) and impl(fleet): metadata database + fleet Metadata query surface #9074 (comment 6839362599); content-plane cross-reference on design(pm-stack): content-addressed media/data plane — R2 dedup, reference-based access, GC when the last reference drops #9084 (comment 6839363279); breaking-changes parking lot seeded on design(atlas+pm): Metadata schema v1 + evolution doctrine — additive-only, extras, strict enums, breaking-change parking lot #9095 (comment 6839363887 — parked set explicitly empty).
    • Queue task: 15341 (queue code, priority 10, status queued at filing) — validated repo-task/v1 packet; its body carries the summit-ownership instructions and the anti-already_done lesson from task 15339. The claiming summit session owns this issue's acceptance checklist end to end.
    • One correction to the original brief, on the record: there is no developing-today/atlas repository — Atlas lives in developing-today/code (pkgs/atlas-search, pkgs/fleet/crates/fleet-search, doc/ designs), which is why the proto design landed in code's doc/ per the 17 existing Atlas design precedents.
    • Source-coverage note for workstream E: every source in Drew's list was confirmed to exist (queue/PM Turso DBs, GitHub orgs, Muse data, OpenCode DB + sessions, ID stores). One adjustment: the Muse corpus source is partially in the index already via the 2026-10-31 publish (Muse among its adapters); OpenCode thinking traces are NOT confirmed present in any store today — that is exactly the investigation impl(atlas): continuous ingestion — queue/PM/GitHub/Muse/OpenCode/ID corpora + sources inventory #9097 carries.
  9. dezren39
    reopened this on Nov 13, 2026
  10. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status:done
    on Nov 13, 2026
  11. 79 remaining items

  12. dezren39
    added
    status/parkedDeliberately paused with a recorded resume condition
    and removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    on Nov 14, 2026
  13. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 15341 dep-blocked on issue #9179 (lane any-c), replacing the park loop

    • state: blocked (dependency, broker-watched per runbook §5b)
    • Task 15341 re-claimed by lane any-c at 2026-11-14T23:25:08Z after lane code-a's dispatch attempt this evening: the send (23:16Z) and the claimant bind (launch_one, 23:19Z) were both refused while the ledger binding to the terminal session ses_e5e2dc87169ffeXD5Q6yj2SIeR stands — evidence on issue Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179 (comment 6885852967) and on this issue (comments 6885779343, 6885855267).
    • The 30-minute park cycle cannot fix a stale binding; the gate is structural. Task 15341 is therefore dep-blocked on issue Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179: when a binding-clearing path exists and Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179 closes, the broker returns the task to the pool automatically and the recorded launch packet (SEND_NOTES_CODE_A.md, worktree ~/git/fleet/queue-15341-9091-atlas-mill, branch queue/15341-muse-send) is the resume path for the summit dispatch.
    • No design work was done in this touch; none of the five acceptance items is met yet.
  14. dezren39
    added
    queue/blockedQueue or user escalation state
    status/blockedQueue or user escalation state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 14, 2026
  15. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    🤖 Agent note · triaged — work is already routed and correctly dep-blocked; no duplicate dispatch filed (task 18839)

    • Agent: queue worker (repo-worker-code), lane any-c
    • Session / ID: task 18839
    • Found via: queue claim (bulk-intake triage packet, 2026-11-16)

    Triage verdict (fresh, 2026-11-17, via gh):

    • Issue design(atlas): Atlas v1 build-out — design-mill starter (proto design → full design set) #9091 is OPEN and already fully routed: the summit dispatch lives in task 15341, which is dep-blocked on issue Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179 (fleet park + cap audit — the ledger binding to a terminal session cannot be cleared; both re-dispatch routes were tried 2026-11-14 and refused at the same bind, evidence on Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179 comment 6885852967 and on this issue). Issue Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179 re-verified still OPEN this shift, so the dependency is live.
    • Work kind: kind/design (stands). The labels status/blocked + queue/blocked + work/assigned on this issue reflect task 15341's dep-blocked state and are left exactly as found — they are the queue-state sync for the blocked dispatch, not staleness.
    • This is a §5b dependency (the blocker is another fleet item), not an escalation: nothing here needs Drew, and no can't-you gate applies — the fleet cannot clear a stale session-ledger binding until Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179's binding-clearing path exists.
    • No duplicate packet filed: enqueueing a second design-mill dispatch for design(atlas): Atlas v1 build-out — design-mill starter (proto design → full design set) #9091 would fork the summit. When Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179 closes, the broker returns task 15341 to the pool automatically and its recorded launch packet (SEND_NOTES_CODE_A.md, worktree ~/git/fleet/queue-15341-9091-atlas-mill) is the resume path.

    Task 18839 completes as triaged naming the standing route: task 15341, dep-blocked on #9179. Issue #9091 stays open and blocked for the summit dispatch.

  16. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    Agent note — task 20290 triaged; existing routing verified, no duplicate dispatch

    OpenChamber scheduled lane code-g claimed task 20290 and immediately checkpointed it with origin openchamber-scheduled-lane. Fresh GitHub verification (2026-11-17): #9091 remains OPEN with status/blocked, queue/blocked, and work/assigned, which reflect the standing design dispatch. Its prior triage note for task 18839 already records the verdict and route: task 15341 is dep-blocked on #9179; #9179 is still OPEN, and its latest comments show the fleet-actionable audit work is done while two Drew-call caps remain. No new design-mill packet is appropriate because it would duplicate the existing summit work. Existing labels were left unchanged.

    Task 20290 is complete as triaged, naming the standing route (task 15341, dependency #9179) and prior evidence at #9091 comment 6938721168 and #9179 comments 6939042513 / 6939421162.

  17. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    🤖 Agent note · blocked on packet validation and required summit dispatch (task 15341, lane any-n)

    • Claim path quarantined this task under repo-queue: claim can hand out a payload-null task, and list views cannot recover a live claim by lane #5444: packet.max_attempts does not match payload.max_attempts.
    • This task requires opencode-route/summit; this scheduled lane cannot switch routes in-session. No designs or worktree changes were made.
    • Blocked pending packet correction and valid summit dispatch after the Fleet park + cap audit (2026-11-12): parks that can never lapse, bound-work parks on verified-stale bindings, escalation-as-park, and BATCH_CLAIM_MAX for Drew's call #9179 binding-clearing condition is available.
  18. dezren39
    removed their assignment
    on Nov 20, 2026
  19. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    🤖 Agent note (lane code-j, 2026-11-26, triage task 24757): verified-blocked, Summit-owned programme — no packet.

    • Fresh check: OPEN with status/blocked + queue/blocked (labels already match). Design-mill starter under the Atlas v1 programme; requires Summit dispatch, which this lane cannot provide.
    • Atlas design work continues in doc/ records; the build-out belongs to the Summit process, not a lane slice. No duplicate dispatch. Refs epic: Atlas program — unified search and memory index over every corpus #8983, Queue reprioritization programme 2026-11-24: full census, reorder, unblock #14158.
  20. developing-today commented on Nov 27, 2026

    @developing-today
    developing-todayBot
    on Nov 27, 2026 – with developing.today
    Contributor
    More actions

    🤖 Agent note · fresh triage (queue task 25229, lane code-h, 2026-11-27)

    Fresh state: #9091 remains OPEN with status/blocked, queue/blocked, work/assigned; no state change since the 2026-11-26 verdict. Existing Summit-owned design-mill task 15341 is still BLOCKED. Its recorded blocker is the stale binding/session plus packet-validation mismatch; its last progress requires a correctly dispatched opencode-route/summit owner session after the #9179 binding/dependency path clears. #9179 remains OPEN; its latest progress (2026-11-25) has PR #14769 parked behind Q6 task 21704, so the dependency remains live.

    Verdict: already routed and correctly blocked — no duplicate dispatch or new packet. #9091's acceptance remains unchecked; this is not resolved work. The existing Summit design-mill route owns it, and this lane does not replace that route.

  21. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Refs #9092 — its remaining acceptance is explicitly design-first; this starter owns the design set and next concrete slice (cache semantics / benchmark protocol). The existing benchmark execution task is #9133.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    epic/atlas-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearingqueue/blockedQueue or user escalation statestatus/blockedQueue or user escalation statestatus:to-dowork/assignedQueue worker lifecycle state

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.