GeezerVison is showing github.com — research(id): takeover resistance + acknowledgment-based inconsistency detection · Issue #9148 · developing-today/code
research(id): takeover resistance + acknowledgment-based inconsistency detection #9148Done 1 / 31 of 3 issues completedDone 1 / 31 of 3 issues completed Labels app/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearing DescriptionProgram #9106 (extensible primitives / federation / namespaces), Drew directive 2026-11-12 18:29 CST.
Parent: #9108.
§1. Threat design: a highly trusted server is taken over (or waits until trusted) and begins behaving inappropriately — including tampering with search results. Worked detection: acknowledgments make lying expensive — if A answers 'don't have it' while B produces the recipient list showing the data was sent to A, one of them is provably wrong; defeating detection requires collusion across servers. All transfers are signed and ALL signatures still validated, always. Specify what's logged, what's provable, and the response playbook when a contradiction is detected. Acceptance: evidence-backed research note merged under doc/ and linked from the parent epic, with a recommendation the sibling designs can build on; open questions recorded, not silently settled. Sub-issuesCollapse Sub-issuesSub-issues1 of 31 of 3 Issues completedLoading 3 sub-issues Activitydeveloping-today commented on Nov 13, 2026 dezren39 commented on Nov 17, 2026
state: triaged
lane: any-b, worker: repo-worker-code, task 18892
Triage verdict for #9148 (checked fresh this shift, 2026-11-17): real design research, sequenced as later-wave work behind two open hard dependencies by the program's own plan — not yet actionable, and not lane work.
- In the epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106 summit plan (
doc/2026-11-13T03-40-00Z_design_id-atlas-summit/crosscut/sequencing.json on origin/main), research(id): takeover resistance + acknowledgment-based inconsistency detection #9148 is slot later, wave 5, kind design, with hard dependencies design(id): peer trust classes + signed-data acceptance rule #9141 and design(id): relay duplicate + loop handling — inform, short-circuit, dedup, loop-inform #9145 — reason recorded there: "Advanced takeover blast-radius and comparable-ack contradiction analysis follows stable signer/request evidence. Minimum key disable/revocation is not deferred; it is V2 under design(id): peer trust classes + signed-data acceptance rule #9141."
- Both dependencies are still OPEN (verified fresh this shift: design(id): peer trust classes + signed-data acceptance rule #9141 OPEN, design(id): relay duplicate + loop handling — inform, short-circuit, dedup, loop-inform #9145 OPEN), so the signer/request evidence this analysis builds on does not exist yet. Note the plan explicitly keeps the minimum revocation work in design(id): peer trust classes + signed-data acceptance rule #9141's V2 scope — nothing safety-critical is deferred by this ordering.
- Routing: no follow-on packet. kind/design research owned by the summit cadence under parent epic(id): Part B — federation & trust: peer classes, signed data, federated query, reputation #9108 / program epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106; the issue itself is the tracked item and becomes actionable when design(id): peer trust classes + signed-data acceptance rule #9141 and design(id): relay duplicate + loop handling — inform, short-circuit, dedup, loop-inform #9145 close.
dezren39 commented on Nov 17, 2026
state: picked-up
lane: code-h, worker: repo-worker-code, task 20338
Checking the existing dependency-based triage against current issue and sequencing state; no implementation changes planned. dezren39 commented on Nov 17, 2026
state: triaged
lane: code-h, worker: repo-worker-code, task 20338
Fresh revalidation of the prior disposition: #9148 remains OPEN; dependencies #9141 and #9145 are both OPEN; origin/main still sequences #9148 as later, wave 5, behind those hard dependencies. This remains summit-owned design research under #9108/#9106, so no follow-on packet is appropriate yet. dezren39 commented on Nov 17, 2026
state: done
lane: code-h, worker: repo-worker-code, task 20338
Queue triage completed. The updated dependency status and sequencing remain unchanged; the work stays with the summit cadence until its prerequisites close. dezren39 commented on Nov 26, 2026 Claimed by lane 2, 2026-11-26T02:45Z. Dependencies #9141 and #9145 are closed, so this is unblocked. Writing the research note under doc/.
Generated by Claude Code
MetadataMetadataapp/idPackage/app: id (pkgs/ or apps/ in this repo)epic/id-programReprioritization program epic (2026-11-12)kind/designA design proposal (design-architect): multi-step, phased, decision-bearing DevelopmentNo branches or pull requestsIssue actions
|